What makes mechanical billing different
| Situation | What the GC usually wants | How to bill it | Free guide or tool |
|---|---|---|---|
| Rooftop units, air handlers, boilers, water heaters and fixtures delivered ahead of install | Invoices, delivery tickets and photos; for material stored off site, often insurance, title papers and a storage location | Bill it as stored materials, then move it to work completed when set; the rollforward keeps it from being billed twice | Billing stored materials |
| Underground, rough-in and trim for plumbing; ductwork and piping by floor | Lines the GC can check on a walk | Split the SOV by system (plumbing, HVAC piping, ductwork, equipment, controls) and by floor or phase | Free Excel SOV template |
| Start-up, testing and balancing, controls, training | Separate lines that are billed only when done | Give each its own line with a fair value, so the end of the job is not left with nothing to bill | Front-loading check |
| Engineer's changes, equipment substitutions, added fixtures | An approved change order before it is billed | Log each change from request to approval and bill approved changes as their own lines | Change orders and the SOV |
| Close-out: O&M manuals, warranties, as-builts, test and balance reports | The full package before final payment and retainage release | Collect close-out documents as the job goes, not at the end, and send them with the release request | Getting retainage released |
| Supplier and lower-tier sub (insulation, controls, balancing) payments | Lien waivers from them with your pay app | Collect conditional waivers with each application and unconditional ones after payment | Lien waiver log |
An example mechanical schedule of values
An example of how a combined HVAC and plumbing subcontract is often broken down, not a standard; follow your subcontract and the GC's form.
| Line | Example description | Why it is its own line |
|---|---|---|
| 1 | Mobilization, permits, submittals and coordination drawings | Early work; keep it in proportion |
| 2 | Plumbing underground | Before the slab; inspected separately |
| 3 to 6 | Plumbing rough-in by floor | Progress per floor |
| 7 | Plumbing fixtures and equipment (material) | A stored-materials line until installed |
| 8 | Plumbing trim and fixture setting | Late work with its own value |
| 9 to 12 | Ductwork and HVAC piping by floor | Progress per floor |
| 13 | HVAC equipment (material) | Usually the largest single delivery |
| 14 | Equipment setting, rigging and connections | Billed when set and connected |
| 15 | Controls | Often a lower-tier sub with its own waivers |
| 16 | Start-up, testing and balancing | Billed when the reports are delivered |
| 17 | Close-out, O&M manuals, training and warranty | Ties to the retainage release |
Where mechanical subs lose money on pay apps
- Equipment billed before the contract allows it. Read the stored-materials clause first: some allow on-site material only, some off-site with conditions. On federal work, FAR 52.232-5 sets the rule for off-site material.
- Start-up and balancing left with too little value. When the SOV is loaded toward rough-in, the last months bring little cash while retainage is still held. The front-loading check shows the balanced version.
- Close-out documents gathered at the end. Retainage is often released only once the O&M manuals, warranties and test reports are in. Start the binder at the first equipment delivery.
- Short payments nobody reconciles. When a check comes in under the certified amount, find which lines were cut before the next application repeats the gap.
Common questions
How do HVAC contractors bill for equipment that is not installed yet?
As stored materials, if the subcontract allows it, with the invoices, delivery proof and photos it asks for; off-site storage usually needs more, such as insurance and title papers. When the unit is set, move its value from stored materials to work completed.
Should start-up and testing and balancing be separate schedule of values lines?
It is common and it helps: each is billed when done, and giving them a fair value keeps cash coming at the end of the job instead of leaving only retainage.
Why is my retainage held after the work is finished?
Most often because close-out items are missing: O&M manuals, warranties, as-builts, test and balance reports or training. Check your subcontract's release conditions and send the full package with your release request.
Do plumbing and HVAC subs need lien waivers from their suppliers?
GCs often ask for waivers from your suppliers and lower-tier subs with each pay application. Collect conditional waivers with the application and unconditional ones once you have paid them.
Mechanical pay apps from rough-in to close-out
PayApps is hosted pay-app billing for specialty subcontractors. It carries stored equipment from month to month until it is set, keeps change orders and the SOV in step, keeps a close-out checklist per job with the documents attached, and tracks the retainage waiting on it. It is open now: pay applications with retainage and change orders, free on one job, no card. Lien waivers, QuickBooks and job costing are in the paid plans, which are not on sale yet. Start free in PayApps.