Pay applications for drywall and framing contractors

Drywall, metal stud framing, taping and finishing, and acoustical ceiling subs bill commercial work on a monthly pay application. The work moves floor by floor in clear phases (framing, board, tape, finish), board is stocked on floors ahead of hanging, and extras come up constantly from other trades' changes. This page covers how to bill each part and where drywall subs most often lose money, with the free guide or tool for each.

What makes drywall billing different

SituationWhat the GC usually wantsHow to bill itFree guide or tool
Framing, board, tape and finish move floor by floorLines that match what the GC sees on a walkSplit the SOV by floor or area and by phase, so each month's percent is a count, not a guessFree Excel SOV template
Board and studs stocked on floors weeks before hangingDelivery tickets and photos for material on siteBill it as stored materials if the subcontract allows, and move it to work completed as it is hungBilling stored materials
Extras from other trades' changes, rework and added blockingA signed ticket for each extraWrite a T&M ticket the same day, get it signed, and roll signed tickets into a change order requestT&M ticket log
Back charges for clean-up or damageDeducted from your payment, sometimes with little noticeAsk for the back charge in writing with its basis, and reconcile it when the check comes in shortPaid short? Reconcile the check
Punch list at the end of each floorItems done and back-checked before the floor is acceptedTrack punch items by floor and send a back-check request when fixedPunch list tracker
Retainage on a long jobRelease at completion or per the statuteKnow your state's retainage rules and track each job's retainage until it is paidRetainage explained

An example drywall schedule of values

An example only; your subcontract and the GC's form decide the lines. Phases per floor let each month's percent be counted rather than estimated.

LineExample descriptionWhy it is its own line
1Mobilization and submittalsEarly work; keep it in proportion
2Material stocked on siteStored materials until hung
3 to 6Metal stud framing by floorFirst phase on each floor
7 to 10Board hanging by floorSecond phase
11 to 14Tape and finish by floorThird phase, often the slowest
15Acoustical ceilingsLate work, sometimes a separate crew
16Punch list and clean-upThe last line; ties to close-out

Where drywall subs lose money on pay apps

Common questions

How should a drywall contractor set up the schedule of values?

By floor or area and by phase (framing, board, tape and finish, ceilings, punch), with stocked material on its own line. Each month's percent then comes from what is done on each floor.

Can I bill for drywall board delivered to the floor but not hung?

Often yes, as stored materials, if your subcontract allows it; attach delivery tickets and photos. Move it to work completed as it is hung.

How do I dispute a back charge on a pay application?

Ask for it in writing with its basis (who, what, when, cost), compare it with your subcontract's back-charge clause, and answer in writing. Keep it on your log so it is not forgotten when the next check arrives.

How do I get paid for extra work caused by other trades?

Write a T&M ticket or change order request the day it happens and get it signed by the GC's superintendent, then bill it once approved.

Drywall pay apps, tickets and punch lists in one place

PayApps is hosted pay-app billing for specialty subcontractors. It keeps the SOV by floor and phase, carries stocked material until it is hung, logs T&M tickets with photos and turns signed ones into change orders, records each check and what it was short, and keeps a punch list per job. It is open now: pay applications with retainage and change orders, free on one job, no card. Lien waivers, QuickBooks and job costing are in the paid plans, which are not on sale yet. Start free in PayApps.