Flooring now prices into the framing budget, and a silent drop is fixed
Plank, tile and carpet orders join the wall-framing-takeoff budget with a labor rate, and a bug that dropped them when sheathing nailers were added is fixed.
-
Flooring orders from room sizes: boxes, tile, grout and carpet seams
The framing takeoff now counts finish flooring: plank boxes, tiles with thinset and grout, and carpet strips cut from a roll.
-
Doorway transitions now count in the flooring takeoff
The flooring takeoff counts doorway transition strips as whole bars and puts them in the budget.
-
Framing a wall that steps in height
A wall that goes from 8 ft to 10 ft studs part-way along now takes off as level segments, each with its own end studs, plates and cut list.
-
A 9 ft first floor beside 8 ft walls: per-wall stud length in the framing takeoff
The wall framing takeoff takes a stud length per wall, so a 9 ft wall can sit next to 8 ft ones in one lumber order.
-
Fuzzing the stepped-wall framer found a confusing error, not a wrong count
A random check of stepped walls showed a step 6 to 12 inches from an end passed validation, then failed with an error naming a segment the user never typed.
-
How many spare studs should a framing lumber order carry?
The framing takeoff now adds a typed cull allowance: whole spare boards per ordered length, kept apart from the layout order.
-
How many tubes of caulk does a siding job need?
The open-source wall framing takeoff now counts siding caulk from opening perimeters and corner board edges, with the bead size you type.
-
Ice and water shield now counts in the roof takeoff
The roof takeoff can now count rolls of ice and water shield along the eaves, from the overhang plus the inches inside the wall, and prices them in the budget.
-
Order-by dates are now on the construction schedule page
Type a supplier lead time per item and the schedule page says which weekday to order so it arrives when the activity starts, and what is already late.
-
Ordering framing lumber by hand costs about 3% more, or 22% if every piece gets its own board
A measured comparison of first-fit-decreasing, the usual hand method, against a cutting-stock order with a printed lower bound.
-
Paint gallons from the same plan that gave you the studs
The framing takeoff now turns walls, openings, ceilings and coats into paint gallons.
-
Paint now counts the trim you already ordered
Run --paint with --trim and the framing takeoff paints the same baseboard and casing it lists.
-
Roof sheathing nails now count in the roof takeoff
The roof takeoff now counts nails for the roof sheathing sheets, from edge and field spacing and the rafter or truss spacing.
-
Roof takeoff: pipe boots counted from your plumbing plan, never guessed
The wall-framing-takeoff roof order now carries plumbing vent pipe boots from a count you type, with a spare, and prices them in the budget.
-
Roofing nails now count in the roof takeoff
The roof takeoff now counts roofing nails in pounds and boxes, for gable, hip and cross-wing roofs, and prices them in the budget.
-
Siding nails now count in the siding takeoff
Set nails: true and the siding takeoff counts nails by run feet, spacing and rows, in pounds and boxes, and prices them in the budget.
-
How many tubes of subfloor adhesive does a floor need?
The open-source wall framing takeoff now counts subfloor adhesive tubes from the joist and rim board lengths, with the bead size and tube you type.
-
The one check every framing setting passes through
A 13-line helper refuses text, NaN, Infinity and negative prices in every settings box of the wall framing takeoff. It now has its own test.
-
The two cheap things under every sill plate that a takeoff forgot
Our framing takeoff counted anchor bolts but not the treated sill boards or foam seal under them. For a 39 by 27 ft stem wall that is 10 boards and 3 rolls.
-
Valley flashing rolls now come out of the roof takeoff
A cross-wing roof has two valleys per wing. The wall-framing takeoff now turns their length into flashing rolls and a budget line.
-
Running every flag of a framing calculator on awkward plans
28 report flags of the open-source wall framing takeoff run on four plan shapes found no crashes, and the sweep is now a test.
-
Feeding a framing CLI plan sections that are the wrong shape
A sweep of 21 plan sections with 7 wrong-shaped values each found a stairs crash and a floor error that printed the word undefined.
-
Calling every function in a framing calculator with nothing
A sweep that called every export of the open-source wall framing takeoff with null, 5 and text found one user-facing function that crashed.
-
A change-order tool that says what is wrong
Two wall-framing takeoff tools crashed with raw errors on a bad budget or window list. They now name the problem.
-
A header named constructor passed the span table check
Probing the wall framing header span table with hostile rows found five ways a bad table or plan got through, and one that crashed.
-
A joist hole with no size passed the check
The wall-framing takeoff read a joist hole with no size as fine. The floor validator now refuses it.
-
A negative quantity in a bid won the bid leveling
Probing our bid-leveling code with bad hand-typed numbers found that a negative quantity or a repeated bidder name could change who looked cheapest.
-
A real wood-framed IFC wall showed our takeoff framing a window as a door
We ran a small wood-framed IFC wall through our framing takeoff. The model was read exactly, but the page lost every opening height and sill.
-
Can I drill a 1.5 inch hole in a 2x4 stud?
A free page that checks a bored hole, notch or drain pipe against common stud limits. A 1.5 inch hole fails in a bearing 2x4 and passes in a non-bearing one.
-
Checking a deck joist and beam without leaving the page
The wall-framing takeoff page's deck card now takes your joist and beam figures and prints bending, shear and deflection for both.
-
Counting outlets from a wall plan
The wall-framing takeoff counts receptacle and switch boxes and a cable order from the wall plan, by the 6-foot rule.
-
Framing a shed-roof wall: one slope, no peak
The wall framing takeoff now frames a single-slope wall: studs that rise with the roof, plates cut along one slope, and a check against hand arithmetic.
-
Fuzzing the lookup that stops a window being framed as a door
A property test for openingSizes, the page code that gives IFC windows their real height and sill, with what it checks and what it does not.
-
Fuzzing the stud drilling check
400 random walls and pipe runs against the wall-framing takeoff's new drilling check. It held, and a one-number mutation breaks the test.
-
How wrong is one stud per foot? Measured on three houses
A counted framing order against the one-stud-per-foot rule at 12, 16, 19.2 and 24 inches on center: close at 16, a quarter high at 24, short at 12.
-
Nesting the peak: cheaper gable sheathing orders from one more cut
Our framing takeoff already nested the sloped top courses of gable end sheathing on shared sheet pieces. It now handles the course that straddles the peak.
-
Opening two real building models in the browser, with no upload
A Rust IFC reader compiled to WebAssembly opened a 2.4 MB and a 49 MB real building model in Chromium in 0.25 s and 3.9 s, with no upload.
-
Putting outlet boxes on the studs
The wall-framing takeoff now places each receptacle box against a real stud, and flags walls where that breaks the 6-foot rule.
-
The outlets that were off the wall
A random-plan test of the wall-framing takeoff's electrical counts found boxes placed past the end of a wall. They are now refused with a reason.
-
Two windows, one king stud, billed as one
A wall-framing budget bug: window setting labour counted king studs divided by two, so windows sharing a king were undercounted. Now it counts header spans.
-
From attic vent area to a count of vented soffit panels
The wall-framing takeoff now turns the intake area its attic ventilation sizing asks for into a number of vented soffit panels in the soffit order.
-
We had the one-flight stair limit wrong: 12 ft 7 in, not 12 ft 3 in
wall-framing-takeoff split stairs at 147 inches. The residential code figure is 151 inches (12 ft 7 in); the default is fixed.
-
What happens to the framing schedule when the crew is on another job?
The wall-framing schedule page now takes a crew's days off and shows how far the finish date moves.
-
Will a 3-inch drain fit in a 2x6 wall?
The wall-framing takeoff now checks pipe and cable holes against the stud drilling limits. A 3-inch drain does not fit a single 2x6 stud.
-
A one-billion-day activity froze our construction scheduler, so we capped it
Sweeping every number in a sample construction schedule with hostile values found a hang, a crash and a 21-second date walk. All three now refuse with a reason.
-
Fuzzing the door and window schedule found plans that crashed it
The new door and window schedule threw on a null wall and turned a text width into a mark. A fuzz test and a plan check fix both.
-
A 500-inch door and a "garage" opening: two plans a framing takeoff should refuse
Probing hostile wall plans by hand found two that a framing takeoff accepted and answered with confident nonsense. Both are now refused with a reason.
-
A header height of "x" crashed the wall framing takeoff
Probing the wall framing takeoff with bad inputs found two plan fields that slipped past validation: a text header height and a text tee position.
-
A waste factor typed as text ordered ten times the concrete
In JavaScript, 1 + "0.1" is the string "10.1". The slab engine in wall-framing-takeoff now refuses numbers given as text.