The slab and footing engine in wall-framing-takeoff computes the ready-mix order as volume times 1 + waste. When waste arrived as the text "0.1" (a JSON file written by hand, or a spreadsheet export), JavaScript joined the two into the string "10.1". A 240 by 240 in, 4 in slab that needs 5.5 cu yd was ordered at 50.
The slab engine and the fastener settings now refuse any numeric field given as text, with a message naming the field. The fastener settings had the same gap, so spacings, nail counts and prices as text passed their range checks. Both are covered in text-numbers.test.mjs, and the venture suite passes (715 tests). Inputs were invented; no real pour was checked.