-
A number field that refused your degree-days
The degree-day box on the wall framing takeoff page had min 1 and step 10, so 6000 was flagged invalid. A repo check caught it; the step is now any.
-
Air leakage joins the wall-framing heat load
The wall-framing takeoff now turns a blower-door ACH50 result into infiltration heat loss alongside walls, windows, slab edge and ceiling.
-
Why the lowest bid is often not the lowest
A free bid leveling page: type a scope and each sub's bid, and see what the bids cost once short quantities and left-out items are priced.
-
Can your rafter take a birdsmouth? The notch gets deeper as the roof gets steeper
The seat of a birdsmouth is as wide as the wall plate, so a steeper pitch cuts a deeper notch. A 2x6 at 12:12 over a 3-1/2 in plate loses 45% of its depth.
-
Can you drill that joist? A hole and notch check for floor framing
wall-framing-takeoff now checks plumbing holes and notches in floor joists against typed depth-fraction limits and reports which ones fail.
-
Cantilever joist tip deflection: choose your own limit on the page
The wall-framing takeoff page can now set the tip deflection ratio for a cantilevered floor joist instead of fixing it at 2a/180.
-
Checking a cantilevered floor joist from your own figures
The wall-framing takeoff now checks the joist behind a floor overhang: bending, shear, tip deflection and uplift at the near support.
-
Checking a stairwell header from the browser
The wall-framing takeoff page now checks a doubled stairwell header for bending, shear, deflection and hanger load from your own loads and stresses.
-
Checking the header around a stairwell, with your own numbers
The wall-framing takeoff now checks the doubled header at a stairwell for bending, shear and deflection, from loads and lumber values you type in.
-
Checking the trimmer's bearing at a stairwell
wall-framing-takeoff now fails a stairwell trimmer whose larger end reaction exceeds a bearing capacity you type in.
-
Clicking through the floor cantilever field
The wall-framing page's cantilever field is now checked in a real browser: the card, the saved plan and the 8 ft limit.
-
Counting straps at a stairwell header, from figures you type
The framing takeoff now turns a typed tie force and a typed strap rating into a strap count per stairwell header.
-
Counting the nails in every joist hanger
The wall-framing takeoff now totals hanger nails from typed per-hanger counts and prices them in the budget.
-
Deck blocking, now a field on the deck page
The wall-framing takeoff page can now add rows of blocking across deck joists and count the pieces, without editing a plan file.
-
Checking deck posts for column buckling without leaving the page
The deck post check (NDS column stability and beam bearing) now takes its loads from one page field. A 16 x 12 ft deck at 36 in: 4x4 posts at 19%, 6x6 at 8%.
-
Does a deck post ever fail in compression? Numbers from the takeoff
A 16 x 12 ft deck at 50 psf puts about 2,300 lb on its busiest post. A 4x4 at 90 in is still at 27% of its column capacity. Where the limit really is.
-
A dormer window with a sill below the floor
Probing the dormer framing engine's window input found that a negative sill height was accepted and framed. It is now rejected.
-
Floor framing now handles a cantilever
Wall Framing Takeoff's floor layout now takes a cantilever: joists, rim board and subfloor run past the back support, with a flag on long overhangs.
-
A foundation takeoff that answers bad JSON with an error
The foundation takeoff threw on null lists and wrong-shaped fields; it now returns a plain error list, which matters for agents and scripts that build input.
-
Framing a gable dormer from four numbers
The wall-framing takeoff now counts the lumber for a gable dormer: cheek studs that shorten with the main roof slope, valleys and jacks, all closed-form.
-
Framing the hole under a dormer
A dormer needs a hole in the main roof. The wall-framing takeoff now counts its two doubled headers, two doubled trimmers and the main rafters it cuts.
-
Gable dormer framing now has a card on the takeoff page
The dormer framing quantities (cheek studs, commons, valleys, ridge, header) were command-line only. Four page fields now drive them.
-
Gable dormer windows on the framing page
The wall-framing takeoff page now takes a front window on a gable dormer, not just a shed one.
-
Two windows 3 inches apart: framing ganged openings
The wall-framing takeoff can now frame close-set windows as one ganged opening, and doing so exposed the next blocker on a real generated plan.
-
Head flashing over every window and door is now counted
Wall Framing Takeoff's siding count now adds Z-flashing over each exterior opening, packed into stock pieces and priced in the budget.
-
How likely is your build schedule to finish on time? A Monte Carlo for the framing schedule
A Monte Carlo over the wall-framing schedule gives P50, P80 and P90 finish dates and a criticality index from ranges you type.
-
Is my notched stair stringer strong enough? A throat-section check
The wall-framing takeoff tool now checks a stair stringer's throat for bending, shear and deflection from stresses you type in.
-
Landing edge guards on the framing page
The wall-framing takeoff page now takes the open edges of a stair landing and adds their guard posts, balusters and rails to the lumber order.
-
The landing post column check is now on the page
The wall-framing takeoff page has a field for the stair landing post check, so you no longer need a plan file to use it.
-
A stair landing post now gets a real column check
The wall-framing takeoff now checks stair landing posts against the NDS column stability factor from typed design values.
-
Linking a stair to the stairwell header it hangs from
wall-framing-takeoff's CLI now carries a stair's stringer reaction into the stairwell header check with one field, instead of a hand-copied number.
-
Monthly weather rates on the construction schedule page
The free schedule page now takes a loss rate per month, so a roof started in March stretches more than one started in July.
-
Picture-frame borders for the deck takeoff, with the arithmetic
The wall-framing-takeoff deck module now lays out a mitred picture-frame border: field size, rows, border boards and the two extra frame joists, hand-checked.
-
Clicking the schedule page's CSV button in a real browser
The wall-framing takeoff schedule page now has a Chromium click check that draws the Gantt chart and downloads the CSV.
-
Schedule durations that come from your takeoff, now on the page
The wall-framing takeoff page now sets an activity's days from its own quantities: ceil(quantity / your crew-day rate).
-
Is the house late? A deadline check for the construction schedule
The free schedule engine now takes a contract completion date and reports working days late or to spare, and what the late days cost.
-
Is your build schedule late? A deadline field for the schedule page
The free construction schedule page now takes a contract completion date and reports working days late or to spare.
-
The schedule page now says whether you make your deadline
The free construction schedule page takes a contract completion date and reports working days late or to spare, with the late cost.
-
A schedule whose durations come from the takeoff
The wall-framing takeoff can now size schedule activities from its own counts: days = quantity divided by a production rate you type.
-
Hold a framing schedule to the lumber delivery date
The free construction schedule page now documents notBefore dates: an activity cannot start until a delivery or permit date you type.
-
Typing a lumber delivery date into the schedule page
The free construction schedule page now has a hold-dates field: type plumb=2026-04-03 and that activity cannot start earlier.
-
A schedule that waits for the windows
The new-home schedule in wall-framing-takeoff now accepts a notBefore date per activity, so a window order or a permit holds the work until it arrives.
-
How late could the build finish? Schedule risk now runs on the page
Type a best and worst case for uncertain activities on the schedule page and get P50, P80 and P90 finish dates and the chance of the contract date.
-
From a schedule to a draw schedule: spend by month
The wall-framing takeoff schedule now takes a typed cost per activity and reports spend and cumulative spend by calendar month.
-
A starter activity list for the new-home schedule
The wall-framing takeoff CLI now prints a 20-activity starter schedule for a one-storey slab-on-grade house, with every duration left at 0 to fill in.
-
A construction schedule you can open in a spreadsheet
The wall-framing takeoff schedule can now be exported as a CSV: activities in start order, slack, critical flags and the effect of slips.
-
A weather allowance for the framing schedule
The wall-framing schedule can pad outdoor activities by a typed fraction of lost days instead of pretending weather is zero.
-
Shop drawings now mark every sheathing sheet
The wall-framing takeoff's shop drawings now outline each sheathing sheet on the wall elevation with its mark, so the crew can match the order to the wall.
-
Shed dormers now work on the framing page, not only the command line
The wall-framing takeoff page can now frame a shed dormer, with an optional opening cut in the main roof, alongside the gable dormer.
-
Shed dormers now frame the hole they cut in the roof
Shed dormers in the wall-framing takeoff now frame the opening they cut in the main roof: doubled headers, doubled trimmers and a count of cut rafters.