Winder stairs: a tread that passes by arc can fail by straight edge
Three 30-degree winders at the smallest radius that passes the 6 in rule measured along the arc come up short when you measure with a tape across the wedge.
-
1,200 random walls, and no gap in the sheathing
A seeded fuzz test throws random walls and openings at wall-framing-takeoff's sheathing layout and checks the panels tile every wall. It found no bug.
-
Baseboard splices cost board: a scarf-joint allowance in the framing takeoff
A baseboard run longer than one board needs splices, and a scarf joint overlaps. The wall-framing takeoff now counts that overlap.
-
Do your stair treads span too far between stringers?
The wall-framing takeoff now warns when stringers are too far apart for the tread thickness, with a worked example.
-
Drag a door along the wall: the plan sketch editor learns to edit openings
The wall-framing takeoff's plan sketch now lets you slide a door or window along its wall and resize it by dragging an edge, with overlaps and slivers refused.
-
Drag a corner, keep the house closed: moving walls in the framing sketch
The wall-framing takeoff plan sketch now has a Move tool: drag a corner or slide a wall, and the walls that meet there follow.
-
Draw your house, get a framing takeoff
The free Wall Framing Takeoff page now has a plan sketch editor: click walls, doors and windows on a grid and it works out corners, tees and openings for you.
-
First-fit lumber ordering costs 9.5% extra when long boards cost more per foot
On 150 small framing orders with length-priced lumber, first-fit-decreasing found the cheapest order 29% of the time; the shipped solver found it every time.
-
Foundation takeoff now counts piers: pads, columns and rebar
The wall-framing takeoff's foundation module now takes pier groups (square pads with optional columns) and returns concrete and rebar, with arithmetic shown.
-
Gable-end wall panels now carry a sheathing weight
The wall-framing takeoff's shop panels skipped sheathing weight on gable walls. They now count the eave rectangle plus the triangle under each panel.
-
How many eave baffles does your attic need? The framing takeoff now counts them
The free wall-framing takeoff now counts attic eave baffles, one per rafter or truss bay on both eaves, next to the loose-fill bag count.
-
Reading doors made of doors: nested CAD blocks in the wall framing takeoff
The wall-framing takeoff's DXF reader now sizes door and window symbols built from other symbols, including mirrored leaves.
-
Pier footings now go in the wall framing takeoff page
The free wall framing takeoff page now takes pier groups: pad size, column, rebar, concrete yards and trucks, no plan file needed.
-
Five real DXF files, five failures: layer flags for the wall-framing takeoff
Real DXF files from the ezdxf test set showed the wall-framing takeoff only found walls on layers named like 'wall'. New CLI flags name the layers.
-
Siding takeoff now counts the triangle on a gable end
The free wall-framing takeoff's siding count used to treat a gable end as a rectangle. It now lays courses up the triangle and wraps its true area.
-
The wall-framing plan sketch now survives a page reload
wall-framing-takeoff's click-drawn plan sketch used to vanish on reload. It now saves on your device only, and the browser test reloads to prove it.
-
Staggered blocking in a wall takeoff
wall-framing-takeoff can now stagger blocking rows so each block can be face-nailed, and keeps fire-block spacing under 10 ft.
-
Stepped footings in a framing takeoff
How wall-framing-takeoff now prices a footing that steps down a sloping lot: taller stem, riser blocks, extra bars.
-
Straighten a crooked plan scan before you trace it
The wall-framing plan sketch can now turn a tilted scan or photo level (or plumb) from two clicks, so walls you trace come out square.
-
The stair order was missing its risers
The wall-framing takeoff laid out stair risers and a handrail but never bought them. Now solid risers and the handrail join the lumber order.
-
Trace over a scanned plan in the free framing takeoff
The wall-framing takeoff's sketch editor can now put a picture of your plan under the grid, scale it from one known dimension, and let you trace the walls.
-
A traced floor plan that survives a page reload
The wall-framing takeoff sketch editor now keeps your scanned plan, its scale and its straightening on your device, so a reload no longer costs the setup.
-
Trim take-off: shoe moulding and scarf joints now on the framing page
The free wall framing take-off page now counts shoe moulding along the baseboard and lets you type a scarf overlap, so long trim runs are bought honestly.
-
Two storeys were one plan: testing the framing tool on a real IFC house
A real two-storey ArchiCAD house exposed a bug in wall-framing-takeoff's IFC import: upper and lower walls merged. It now reads one storey at a time.
-
Build schedules that skip your holidays
The wall-framing-takeoff schedule now skips the holidays and weather days you list, so finish dates match the calendar.
-
Counting siding course by course instead of by square foot
The wall-framing takeoff now counts lap siding, house wrap and corner boards from walls and openings: a window cuts a course, the run splits, offcuts carry on.
-
Guarding the open edge of a stair landing
Open landing edges on a stair now get posts, balusters under a 4 in gap and rails in the wall-framing takeoff order.
-
Gutters and downspouts join the framing takeoff page
The wall-framing takeoff page can now count gutter sections, downspouts, hangers, caps and elbows from the roof's eaves, and price them into the budget.
-
How many balusters does a 9-foot stair guard need? 21 per side, with a 3-11/16 in gap
A worked guard and handrail layout for a 14-riser stair: posts, balusters under the 4 in sphere rule, rails and handrail length.
-
How many gutter sections and downspouts does a 40 by 24 ft house need?
On a gable roof with 12 in overhangs: 84 ft of gutter, 9 ten-foot sections, 4 downspouts, 44 hangers and 8 end caps, from the free wall-framing takeoff.
-
How many pails of joint compound does a house need? Checking a rule of thumb against the label
wall-framing-takeoff's 0.01 gal per sq ft joint compound rate matches the 450 sq ft per 4.5 gal pail on Sheetrock listings; ultralightweight uses ~10% less.
-
How many risers, and how long must the stairwell be? A 9 ft floor-to-floor example
A 108 in rise needs 14 risers of 7-11/16 in, 13 treads, four 2x12 stringers 14 ft 11-15/16 in long and a stairwell at least 9 ft 11-5/8 in long.
-
How tight can a winder staircase turn before it fails code?
Three wedge treads round a zero-size pivot always fail the code's 6 inch rule. The smallest passing pivot is 11.5 inches for three treads, 15.3 for four.
-
Level the bids before you pick the low one: a framing-takeoff page card
The wall-framing takeoff now lines subcontractor bids up against its own quantities in the browser, so a short count or left-out scope shows up before you sign.
-
What a real CAD door symbol did to our wall-framing import
Four real CAD door symbols, put in a made-up house, showed our DXF reader counting one double door as several 4-inch doors. Here is the fix.
-
Reading window height and sill from a real IFC file
The wall-framing takeoff's IFC reader ignored opening heights. A real buildingSMART sample showed the cost: a 500 mm sill framed as 34.5 in.
-
Counting siding course by course, now in the browser
wall-framing-takeoff's siding, house wrap and corner board count now has a page card. On the example house: 56 courses, 154 boards at 7 in exposure.
-
Soffit, fascia and J-channel counted from the roof you already drew
wall-framing-takeoff's page now counts soffit, fascia and J-channel from the roof overhangs: a 40 x 28 ft gable sample needs 8 panels, 11 fascia boards.
-
Soffit, fascia and J-channel now count on the wall-framing page
The wall-framing page now has a soffit, fascia and J-channel card: enter overhangs and eave lengths, get panels and boards to buy, with waste.
-
Lay out a stair in your browser: risers, stringers and the stairwell opening
A free browser card that turns a total rise into equal risers, stringers, tread boards and the stairwell opening length, and splits tall rises at a landing.
-
A stair that rises 13 ft 4 in needs a landing: what the lumber list looks like
wall-framing-takeoff now splits a stair rising over 147 inches into two flights around a landing and adds the landing lumber to the order.
-
Counting the steel at wall plate joints
The wall-framing takeoff now counts straps across top-plate and cap-plate joints, and prices them in the budget, from the joints it already placed.
-
Plate straps now have page controls in the wall framing takeoff
The wall-framing-takeoff page can count steel straps across top-plate and cap-plate joints and price them in the budget.
-
Reading door and window symbols from a CAD plan to size wall framing
The wall-framing takeoff now reads door and window block symbols in a DXF as openings, sized from each block's box: a 36 in door leaf, a 72 in window.
-
The first real IFC file broke our wall reader twice
Wall Framing Takeoff only read hand-written IFC. buildingSMART's real sample house found two bugs: unreadable mesh walls and lengths 1000 times too long.
-
Wall framing takeoff page now counts anchor bolts
The foundation section of the wall framing takeoff page takes an anchor bolt spacing and plate-end distance, so the bolt count no longer needs a plan file.
-
Wall framing takeoff budget now exports to a spreadsheet from the command line
node cli.mjs plan.json --budget --csv prints the priced takeoff, labor lines and totals as CSV.
-
Wall framing takeoff now counts ceiling steps in the drywall
A dropped soffit or tray edge adds board, corner bead and taped angle; the drywall count now includes them from a length and a drop.
-
Dropped soffits can now be typed into the wall framing takeoff page
The drywall ceiling box on the wall framing takeoff page takes a soffit as 'length x drop' and counts its board, bead and taped angle.
-
How far off is a framing allowance from a counted lumber order?
Two rules of thumb against wall-framing-takeoff's optimised order on an invented house and a generated one: from +1.9% to +24.6%.