-
Clicking through the trim card: shoe moulding and scarf joints in a real browser
Two trim fields in the wall framing tool were only checked by reading the page source. A Chromium click test now types into them and reads the result.
-
How wide a footing does a deck post need?
The wall-framing takeoff's deck post check now sizes the round footing from the worst post load and a soil bearing you type, and flags a small one.
-
Deck joists, checked instead of guessed
The deck planner now checks joist bending, shear and deflection from stresses you type in, and says plainly when a 2x8 is too long.
-
Does a 2-2x10 deck beam hold the joists? A simple-span check in the framing takeoff
The framing takeoff's deck module now checks the built-up beam in bending, shear and live deflection from typed allowable stresses, completing the set.
-
Every labor rate the framing budget reads is now named on the page
The takeoff page's price box now lists all thirteen typed labor rates, and a test keeps the list in step with the budget engine.
-
From cost to bid price: overhead and profit in the framing budget
The free wall-framing takeoff's budget now adds a builder's overhead and profit to the cost and reports the bid price and the real margin.
-
A framing budget per linear foot of wall
The framing takeoff budget now reports its total divided by the feet of wall in the plan, next to the per-square-foot-of-floor figure.
-
Cash float on a house build should use what you bill, not what you spend
The free framing takeoff can now bill draws at cost plus a typed markup, so retainage held and the peak cash you float are computed on the invoice.
-
The framing proposal now runs in the browser
A builder can type prices, add permit and dumpster allowances, and download a customer letter from the framing takeoff page without a command line.
-
From a framing takeoff to a proposal a customer can read
The framing takeoff turns its priced budget into a customer letter with no visible margin, and refuses to issue one while any line is unpriced.
-
Fuzzing a construction schedule: 300 random job networks against the critical path
How we test a critical-path scheduler for new-home builds with random activity networks, and what the test would have caught.
-
300 random floors thrown at the floor framing engine
A seeded property test now feeds 300 random floors to the framing takeoff's floor engine and checks board lengths, rim coverage and sheet counts.
-
Fuzzing the wall layout engine: 400 random houses, no failed self-check
A seeded property test throws random walls and openings at the framing engine and checks every layout with its own self-check.
-
Siding a gable end with a window in the triangle
The wall-framing takeoff used to clip a gable window at the eave line, over-counting siding and house wrap. It now cuts the triangle's courses round the window.
-
Gutters for an L-shaped house: the wing's eaves count now
The framing takeoff's gutter module now swaps the main eave stretch under a cross wing for the wing's own two eave runs, with downspouts and fittings following.
-
Do horizontal sheathing sheets need nailers? The framing takeoff says no, and checks it
A roadmap line said nailers for horizontal sheets were missing. Joint blocks already cover it, and a new test checks staggered blocking rows beside a window.
-
How deep must a stair stringer's throat be?
The stringer check now solves bending, shear and deflection for depth and reports the smallest throat that passes, and which check sets it.
-
How do you test an attic vent calculator when you have no real house to check it against?
The attic ventilation module now has a seeded property test over 300 random roofs and vent settings, checking the one thing a vent order must get right.
-
How far below the main ridge does a cross wing's ridge sit?
The framing takeoff now reports each cross wing ridge height over its plates and how far below the main ridge it sits.
-
How long must a stair stringer bear on its support?
The framing takeoff's stringer check now reports the shortest bearing length that keeps compression perpendicular to grain under a typed allowable.
-
How many connectors does a stair stringer need at the top?
The framing takeoff's stringer check now turns its end reaction into a connector count per stringer, from a per-connector capacity you type.
-
How much cash does a builder float between spend and draw?
The schedule tool now turns typed draw terms, a payment lag and retainage, into the deepest gap between cash paid out and cash received.
-
Labor for siding and trim in a framing budget
The framing takeoff's budget now turns a typed siding rate (per sq ft) and trim rate (per foot) into labor lines tied to the model's own quantities.
-
Labor for the roofline: fascia, soffit and gutters in the budget
The framing takeoff's budget now turns a typed per-foot rate into labor lines for fascia, soffit, J-channel and gutters.
-
Checking a stair landing's joists and the load the flights add to its posts
The framing takeoff now checks a stair landing's joists in bending, shear and deflection and adds both flights' reactions to the heaviest post and footing.
-
A notch at the stringer's support cuts its shear capacity
The stair stringer check now compares end shear with the reduced capacity of a board notched on its tension face at the support.
-
The stair card now takes the notched-support check
A page field for the stringer notched-at-support shear check, so the browser and the CLI agree.
-
Permits and delivery in a framing budget: typed allowances
The framing takeoff's budget now takes typed lump sums for permits, delivery and equipment, counted before overhead and profit.
-
Pricing the labor on a dormer in a framing budget
The framing takeoff's budget now adds a dormer labor line from a typed rate per square foot of dormer roof, and leaves it unpriced when you type none.
-
Pricing a stair handrail by the foot in a framing budget
The framing takeoff's budget now prices the handrail run in linear feet from the stair's own rail layout, using a price you type.
-
Pricing stair labor per riser in a framing budget
The framing takeoff's budget now has a stair labor line, priced by the riser count the stair layout already knows, with your own typed rate.
-
Pricing the attic vents: ridge vent, soffit vents and baffles in the framing budget
The framing takeoff's budget now carries the ridge vent, soffit vents and rafter baffles that its ventilation sizing already counted.
-
Pricing a stair rail: balusters, posts and brackets in the budget
The framing takeoff's budget now counts a stair's balusters, guard posts and handrail brackets and prices them from typed unit prices.
-
A payment schedule for the framing proposal
The customer proposal now splits its price into typed milestone payments that add up to the cent.
-
Counting roof sheathing under a cross wing
The framing takeoff now shortens the main roof's sheathing courses where a cross wing replaces them, instead of buying that plywood twice.
-
Soffit and fascia now count the cross wing on an L-shaped roof
The framing takeoff's soffit, fascia and J-channel count used to stop at the main roof; it now swaps in a cross wing's own eaves and rakes.
-
Stair stringer connection and bearing checks now have a page field
The framing takeoff page can now run the stringer connector count and bearing check without editing a plan file.
-
The dormer the budget forgot
The framing takeoff's budget now prices a dormer's lumber by board foot and its roof by area, from typed prices only.
-
The framing budget now prices the deck
A plan with a deck now gets a Deck section in the budget, with lumber, footing bags, screws and a typed labor rate, all tied to the deck layout.
-
The framing budget now prices stair connectors and risers
Stringer connectors, foot anchors and solid riser boards join the stair labor line in the framing budget, and a duplicate stair labor line is gone.
-
A price picker for the framing budget
The wall-framing takeoff budget card now has a dropdown that adds any price name the engine reads to the price box.
-
What does a framing change cost? A change-order diff for the takeoff
The framing takeoff can now compare two plans and show the budget difference line by line, so a design change has a price before anyone argues about it.
-
What a staircase costs: a per-riser labor line in the framing budget
The framing takeoff budget now prices stair labor per riser from a rate you type, across every flight in the plan.
-
What does a design change cost? A free change-order page
A free browser page that diffs a budget before and after a design change, line by line, listing unpriced lines instead of guessing.
-
What will this house cost to heat, gas furnace against heat pump?
The framing takeoff turns its seasonal heat loss into a yearly fuel quantity and cost per heating system you type, with no prices or efficiencies shipped.
-
Where a stair stringer bears: a check on the support end
The framing takeoff's stringer check now reports bearing stress at the support from a typed compression-perpendicular allowable.
-
Will a stair tread hold a 300 lb point load between its stringers?
The framing takeoff's stair module now checks one tread board in bending and deflection under a typed concentrated load at midspan between stringers.
-
A concrete calculator that orders in quarter yards
Slab, footing strip or piers in; cubic yards, a ready-mix order and bag counts out. A 12 x 12 ft slab at 4 in is 1.78 yd and an order of 2.
-
A drywall calculator that counts the cuts, not just the area
Room size, doors and windows in; sheets, screws, tape and compound out. A 12 x 12 ft room is 15.9 sheets by area and 17 to buy.
-
A floor cantilever field on the framing page
The wall-framing takeoff page can now frame a floor whose joists, rim and subfloor run past the back support, as the command line already did.