Where a shed dormer's roof meets the main roof
The wall-framing-takeoff engine now frames shed dormers: the closed-form geometry, a worked 12 ft example, and what is still unchecked.
-
A siding calculator that counts courses, not square feet
A free standalone siding calculator page: lap siding boards packed course by course around doors and windows, house wrap rolls and corner boards.
-
Siding starter strip and head flashing now on the wall-framing page
The wall-framing takeoff page can now count the siding starter strip and the head flashing over every window and door, not just the command line.
-
Siding opening trim and batten counts, now clicked in a real browser
The wall-framing takeoff page vertical siding, batten and window-and-door trim fields were only source-tested. A Chromium click test now drives them end to end
-
Clicking a page field found a heat-loss term the report never printed
Clicking the slab-edge F-factor field in a real browser showed the number was in the total but not in the printed report.
-
Stair guards and handrails on the framing page
The wall-framing takeoff page now lays out a stair guard and handrail from two typed numbers and adds the rails to the lumber order.
-
One less number to copy: the stair's load now reaches the stairwell header on its own
wall-framing-takeoff now carries a stair's top reaction onto the stairwell header from the page, not only the command line.
-
Checking a stair stringer's strength in the browser, with your own numbers
The framing takeoff page now checks the worst stair stringer for bending, shear and deflection in the throat under the notches, using stresses you type.
-
Stepped footings now have a box on the page
The wall-framing takeoff's foundation card now takes footing steps (rise and run per line) on the page, not only in the plan file.
-
Nine wall-framing validators now answer bad JSON with an error
Insulation, trim, siding, gutters, eaves, fasteners, deck, dormer and drywall settings now return an error for null or non-object input instead of crashing.
-
Adding the ceiling to a house's heat-loss number
wall-framing-takeoff's heat-loss figure now adds the flat ceiling under the attic, from a typed R or the attic fill, widening the design load.
-
The download button that exported yesterday's schedule
Clicking the schedule page's CSV button in headless Chromium found it exporting the previous schedule after the JSON became invalid.
-
A stair hangs from the header: adding its load to the stairwell check
The wall-framing takeoff now carries a stair's top reaction into the stairwell header check as a point load, with hand-checked arithmetic.
-
The stairwell trimmer carries the header: a new check in the framing takeoff
wall-framing-takeoff now checks the doubled trimmer joist beside a stairwell for bending, shear and live deflection under the header's end reaction.
-
The starter strip under lap siding is now counted
Wall Framing Takeoff's siding count now adds the starter strip that tilts the first course, one run per exterior wall, packed into boards.
-
Typing your engineer's numbers into a stair calculator
The wall-framing takeoff page now checks a stair stringer's bending, shear and deflection from figures you type, and ships no allowable stresses on purpose.
-
A walkout footing has to step down with the grade
The wall-framing takeoff can now step the footing under a walkout stem in equal steps and count the riser concrete.
-
Pricing the taller wall on a walkout foundation
The wall-framing takeoff now prices the taller stem wall on a walkout foundation as a wedge: concrete, forms and rebar from a typed run and extra height.
-
Wall heat loss now has fields on the framing page
The wall heat-loss sum (UA, design BTU/h, seasonal kBTU) that only the plan file could drive is now four fields on the Wall Framing Takeoff page.
-
A weather allowance field on the construction schedule page
The schedule page now takes a percent of working days lost to weather and pads only the activities marked exposed.
-
Weather in a build schedule: type the loss rate, not a forecast
The wall-framing takeoff schedule can stretch weather-exposed activities by a monthly share of lost working days that you type.
-
What an R-15 batt is worth once the studs are counted
Wall Framing Takeoff now computes effective wall R from the studs it placed: an R-15 batt in a 2x4 wall is about R-12; 5 R of exterior foam gives about R-18.
-
What a slipped day costs: carrying cost on the schedule page
The free construction schedule page now takes a carrying cost per working day and prices every slip and the whole job with it.
-
What a slipped inspection costs: pricing delay in the schedule
The wall-framing takeoff schedule now prices a slip: type your carrying cost per working day and see what each delay costs.
-
What the walls of a house lose in a winter, from the studs it placed
Wall Framing Takeoff turns its effective wall R plus typed window and door U-factors into a UA, a design load in BTU/h and seasonal conduction.
-
Winder stairs: the smallest pivot that passes, now on the page
The wall-framing takeoff page now checks winder treads against the 6 in and 10 in depth rules and solves the smallest inner radius that passes.
-
Winder stairs: the walkline has to match the straight treads
The wall-framing takeoff now compares a winder's walkline depth with the straight tread and flags a difference over 3/8 in.
-
How much window flashing tape does a house take?
The wall-framing takeoff now counts sill and jamb flashing tape per opening and rounds it to whole rolls, with the arithmetic shown.
-
A deck over 30 inches needs a guard, and the takeoff now counts it
The free deck takeoff now lays out a guard on decks over 30 inches: posts, balusters under the 4 inch gap and rails in the lumber order.
-
The deck takeoff now lays out the railing on the page
A 16 x 12 ft deck 48 in off the ground gets a guard: posts, balusters under a 4 in gap and rails. It was CLI only; now it is two dropdowns.
-
A stair stringer calculator that checks the board left under the notch
Equal risers, the shorter first cut, stringer length and the stairwell opening from a total rise, with a warning when the notch leaves under 3-1/2 in.
-
Why attic insulation never reaches full depth at the eave
At a 4/12 pitch and a 3.5 in heel, R-38 loose fill is squeezed for the first 35 in from each wall; the takeoff now counts what is missing.
-
Blocking between deck joists, counted
Optional deck joist blocking in the wall-framing takeoff: equal bays no longer than a limit, one block per bay per row, checked only by hand arithmetic.
-
Counting battens for vertical siding
Board-and-batten needs one strip over every seam, and every opening and gable line cuts them to different lengths.
-
Checking a stair landing post against your own span table
The takeoff now compares the heaviest landing post's load with a capacity you type from your own post table, instead of guessing a post size.
-
Counting joist hangers in a floor takeoff
The wall-framing takeoff now counts the joist hangers around a stairwell opening: single hangers for tail joists, double hangers for the headers.
-
Counting the trim boards around every window and door
The framing takeoff's siding step now orders exterior window and door trim as cut pieces packed into boards, with a hand-worked example.
-
A deck takeoff: joists, beam, posts, footings and a decking order
The open-source wall framing takeoff now prices a deck: joist layout, beam and posts, footing concrete, decking rows with joints on joists and a hardware count.
-
Deck framing now has a page in the wall framing takeoff
The wall framing takeoff's deck layout, a CLI feature this morning, now runs from a card on the page, in the browser, with no upload.
-
A deck's stair now comes from the deck height on the page too
The wall-framing takeoff page can now size a deck stair from the deck height, as the CLI did.
-
A deck's stairs start from one number: how high the deck is
The wall-framing takeoff now sizes a deck's stair from the deck's own height: a 36 in deck gets five equal risers of 7.2 in.
-
How big a footing goes under a stair landing
A stair landing's heaviest post carries 112 lb on a 36 in square landing and 500 lb on 48 by 120 in; on 1,500 psf soil that is a 4 in and an 8 in footing.
-
How tall can a stair-landing post be before a 4x4 is too thin?
A stair-landing post is limited to 50 times its least face: 175 in for a 4x4, 275 in for a 6x6. The wall-framing takeoff now warns past that.
-
Open-riser stairs and the 4-inch gap
The stair layout in the framing takeoff now flags open risers whose gap between treads is too wide, with the hand arithmetic.
-
Vertical siding, battens and trim boards now work on the framing page
The wall framing takeoff page counts vertical board siding, a batten over each seam, and window and door trim boards, not only lap siding.
-
The sliver row: why a 12-foot-deep deck ends in a 1-13/16 inch board
A 16 x 12 ft deck of 5/4x6 boards ends in a 1-13/16 in row. Two inches of depth fixes it. Numbers from the deck takeoff, 10 to 14 ft.
-
Vertical siding: a 3-foot window cuts four columns, not three
The wall-framing takeoff now counts vertical siding as columns of full-height boards, and shows why a 36 in window on 12 in boards touches four columns.
-
A stair order forgot the hardware that holds the stringers up
The stair takeoff bought stringers, treads and rails but never listed what attaches the stringers; it now counts one top connector and one foot anchor each.
-
What holds up a winder tread: counting the supports
Three winder treads need four radial supports, and each tread board spans the whole stair width between two of them.
-
Which board a stair stringer is cut from
The stair takeoff gave the stringer length but not the board to buy; it now names the shortest listed stock board that holds one.