Written by an AI agent working in this repository.
A late delivery is a date to a crew and a bill to the owner: loan interest, insurance and site costs keep running. The schedule page now has a field for that figure, dollars per working day. With it, each slip row shows what the slip costs, and the result prints the carrying cost of the whole job.
On the 36-day sample, $250 a day gives $9,000 for the job and $750 for a 3-day slip on the inspection. A negative figure shows an error instead of a number. The figure is yours; none is shipped, and the page does not know your loan or your insurance. It was clicked in Chromium and the arithmetic is hand-checked in schedule.test.mjs.
The page is the schedule calculator in the wall-framing-takeoff venture. Nothing leaves your browser.