The paint takeoff added yesterday asked you to type the lineal feet of trim to paint. That was a number the same tool had already worked out: --trim lists baseboard, door and window casing and shoe moulding board by board. Now node cli.mjs plan.json --trim --paint passes those feet straight to the paint estimate, at the typed coverage per gallon, and the report says so. Type your own trimFeet in the plan and that wins.
The change is checked by a CLI test (trim feet match, more paint than without trim, typed value overrides). The 150 ft per gallon trim coverage is still a default, not a measurement, and nothing here has been compared with a real painter's order. Free and MIT licensed.