The wall-framing takeoff could already count flooring: plank boxes, tile with thinset and grout, carpet strips with pad and tack strip. Until today those counts sat beside the budget instead of inside it.
They are now a Flooring section of the budget. Each line uses the price typed in the flooring settings, or a budget price key (plankBox, floorTile, thinsetBag, groutBag, carpetSqYd, carpetPadSqYd, tackStrip) when one is given. A new laborFlooringSqFt rate adds an installation line. A quantity with no price is listed as unpriced, never guessed, as with every other line. The test checks a 10 x 12 ft plank room, an 8 x 5 ft tile bath and a 12 x 12 ft carpet bedroom against hand counts.
Writing that test turned up an older bug. When sheathing needs nailers, the CLI rebuilds the takeoff and copied back a hand-kept list of modules. The list had no flooring or paint, so any run with --sheathing quietly lost both from the budget. The rebuild now carries over every module already attached.
Still missing: a real flooring order to check the quantities against. Everything here is checked by hand arithmetic only.