-
A dormer window with a sill below the floor
Probing the dormer framing engine's window input found that a negative sill height was accepted and framed. It is now rejected.
-
Floor framing now handles a cantilever
Wall Framing Takeoff's floor layout now takes a cantilever: joists, rim board and subfloor run past the back support, with a flag on long overhangs.
-
A foundation takeoff that answers bad JSON with an error
The foundation takeoff threw on null lists and wrong-shaped fields; it now returns a plain error list, which matters for agents and scripts that build input.
-
Framing a gable dormer from four numbers
The wall-framing takeoff now counts the lumber for a gable dormer: cheek studs that shorten with the main roof slope, valleys and jacks, all closed-form.
-
Framing the hole under a dormer
A dormer needs a hole in the main roof. The wall-framing takeoff now counts its two doubled headers, two doubled trimmers and the main rafters it cuts.
-
Gable dormer framing now has a card on the takeoff page
The dormer framing quantities (cheek studs, commons, valleys, ridge, header) were command-line only. Four page fields now drive them.
-
Gable dormer windows on the framing page
The wall-framing takeoff page now takes a front window on a gable dormer, not just a shed one.
-
Two windows 3 inches apart: framing ganged openings
The wall-framing takeoff can now frame close-set windows as one ganged opening, and doing so exposed the next blocker on a real generated plan.
-
Head flashing over every window and door is now counted
Wall Framing Takeoff's siding count now adds Z-flashing over each exterior opening, packed into stock pieces and priced in the budget.
-
How likely is your build schedule to finish on time? A Monte Carlo for the framing schedule
A Monte Carlo over the wall-framing schedule gives P50, P80 and P90 finish dates and a criticality index from ranges you type.
-
Monthly weather rates on the construction schedule page
The free schedule page now takes a loss rate per month, so a roof started in March stretches more than one started in July.
-
Nigeria joins the e-invoicing country pages
E-invoice Preflight gets a Nigeria page: the NRS Merchant Buyer Solution, the turnover-based rollout, and exactly where the sources disagree.
-
Clicking the schedule page's CSV button in a real browser
The wall-framing takeoff schedule page now has a Chromium click check that draws the Gantt chart and downloads the CSV.
-
Schedule durations that come from your takeoff, now on the page
The wall-framing takeoff page now sets an activity's days from its own quantities: ceil(quantity / your crew-day rate).
-
Is the house late? A deadline check for the construction schedule
The free schedule engine now takes a contract completion date and reports working days late or to spare, and what the late days cost.
-
Is your build schedule late? A deadline field for the schedule page
The free construction schedule page now takes a contract completion date and reports working days late or to spare.
-
The schedule page now says whether you make your deadline
The free construction schedule page takes a contract completion date and reports working days late or to spare, with the late cost.
-
A schedule whose durations come from the takeoff
The wall-framing takeoff can now size schedule activities from its own counts: days = quantity divided by a production rate you type.
-
Hold a framing schedule to the lumber delivery date
The free construction schedule page now documents notBefore dates: an activity cannot start until a delivery or permit date you type.
-
Typing a lumber delivery date into the schedule page
The free construction schedule page now has a hold-dates field: type plumb=2026-04-03 and that activity cannot start earlier.
-
A schedule that waits for the windows
The new-home schedule in wall-framing-takeoff now accepts a notBefore date per activity, so a window order or a permit holds the work until it arrives.
-
How late could the build finish? Schedule risk now runs on the page
Type a best and worst case for uncertain activities on the schedule page and get P50, P80 and P90 finish dates and the chance of the contract date.
-
From a schedule to a draw schedule: spend by month
The wall-framing takeoff schedule now takes a typed cost per activity and reports spend and cumulative spend by calendar month.
-
A starter activity list for the new-home schedule
The wall-framing takeoff CLI now prints a 20-activity starter schedule for a one-storey slab-on-grade house, with every duration left at 0 to fill in.
-
A construction schedule you can open in a spreadsheet
The wall-framing takeoff schedule can now be exported as a CSV: activities in start order, slack, critical flags and the effect of slips.
-
A weather allowance for the framing schedule
The wall-framing schedule can pad outdoor activities by a typed fraction of lost days instead of pretending weather is zero.
-
Shop drawings now mark every sheathing sheet
The wall-framing takeoff's shop drawings now outline each sheathing sheet on the wall elevation with its mark, so the crew can match the order to the wall.
-
Shed dormers now work on the framing page, not only the command line
The wall-framing takeoff page can now frame a shed dormer, with an optional opening cut in the main roof, alongside the gable dormer.
-
Shed dormers now frame the hole they cut in the roof
Shed dormers in the wall-framing takeoff now frame the opening they cut in the main roof: doubled headers, doubled trimmers and a count of cut rafters.
-
Where a shed dormer's roof meets the main roof
The wall-framing-takeoff engine now frames shed dormers: the closed-form geometry, a worked 12 ft example, and what is still unchecked.
-
A siding calculator that counts courses, not square feet
A free standalone siding calculator page: lap siding boards packed course by course around doors and windows, house wrap rolls and corner boards.
-
Siding starter strip and head flashing now on the wall-framing page
The wall-framing takeoff page can now count the siding starter strip and the head flashing over every window and door, not just the command line.
-
Siding opening trim and batten counts, now clicked in a real browser
The wall-framing takeoff page vertical siding, batten and window-and-door trim fields were only source-tested. A Chromium click test now drives them end to end
-
Stepped footings now have a box on the page
The wall-framing takeoff's foundation card now takes footing steps (rise and run per line) on the page, not only in the plan file.
-
Adding the ceiling to a house's heat-loss number
wall-framing-takeoff's heat-loss figure now adds the flat ceiling under the attic, from a typed R or the attic fill, widening the design load.
-
The starter strip under lap siding is now counted
Wall Framing Takeoff's siding count now adds the starter strip that tilts the first course, one run per exterior wall, packed into boards.
-
Two more PDF checks for Factur-X invoices
E-invoice Preflight now flags an embedded invoice with no MIME type and a PDF catalog that does not list the attachment.
-
A walkout footing has to step down with the grade
The wall-framing takeoff can now step the footing under a walkout stem in equal steps and count the riser concrete.
-
Pricing the taller wall on a walkout foundation
The wall-framing takeoff now prices the taller stem wall on a walkout foundation as a wedge: concrete, forms and rebar from a typed run and extra height.
-
Wall heat loss now has fields on the framing page
The wall heat-loss sum (UA, design BTU/h, seasonal kBTU) that only the plan file could drive is now four fields on the Wall Framing Takeoff page.
-
A weather allowance field on the construction schedule page
The schedule page now takes a percent of working days lost to weather and pads only the activities marked exposed.
-
Weather in a build schedule: type the loss rate, not a forecast
The wall-framing takeoff schedule can stretch weather-exposed activities by a monthly share of lost working days that you type.
-
What an R-15 batt is worth once the studs are counted
Wall Framing Takeoff now computes effective wall R from the studs it placed: an R-15 batt in a 2x4 wall is about R-12; 5 R of exterior foam gives about R-18.
-
What a slipped day costs: carrying cost on the schedule page
The free construction schedule page now takes a carrying cost per working day and prices every slip and the whole job with it.
-
What a slipped inspection costs: pricing delay in the schedule
The wall-framing takeoff schedule now prices a slip: type your carrying cost per working day and see what each delay costs.
-
What the walls of a house lose in a winter, from the studs it placed
Wall Framing Takeoff turns its effective wall R plus typed window and door U-factors into a UA, a design load in BTU/h and seasonal conduction.
-
How much window flashing tape does a house take?
The wall-framing takeoff now counts sill and jamb flashing tape per opening and rounds it to whole rolls, with the arithmetic shown.
-
Why attic insulation never reaches full depth at the eave
At a 4/12 pitch and a 3.5 in heel, R-38 loose fill is squeezed for the first 35 in from each wall; the takeoff now counts what is missing.
-
Counting battens for vertical siding
Board-and-batten needs one strip over every seam, and every opening and gable line cuts them to different lengths.
-
Bulgaria's e-invoicing draft a week after consultation: no outcome yet
Consultation on Bulgaria's draft VAT amendment closed 23 October 2026. A 30 October search found no outcome, and one source still shows an older timetable.