Pricing let-in wall braces by the foot
The open-source wall framing takeoff can now price let-in diagonal wall braces per linear foot instead of per brace.
-
Wall braces now have controls on the framing page
The open-source wall framing takeoff page gained a tick, a spacing field and a price field for diagonal wall braces.
-
How many diagonal wall braces does a house need?
The open-source wall framing takeoff now counts diagonal wall braces and their length from wall length and height, at a spacing you type.
-
Tile edge trim: how many pieces for the open edges?
The open-source wall tile takeoff now counts edge trim for the open edges of each tiled surface.
-
Tiling a shower: how many tiles, bags and backer boards?
The open-source framing takeoff now orders wall tile for showers, tub surrounds and backsplashes: tiles, thinset, grout, cement board and membrane.
-
A door and window schedule you can download from the framing takeoff page
The wall framing takeoff page now downloads a door and window schedule as CSV: marks, counts, rough and unit sizes, headers, sill heights and locations.
-
A namespace typo in Saudi e-invoice rules made our checker cry wolf
ZATCA's published rules bind one XML prefix two ways. We trusted the wrong one, so every signed Saudi invoice drew a false warning. Fixed in einvoice-preflight.
-
E-invoicing pages for Armenia and Georgia
E-invoice Preflight now covers 85 countries: Armenia's SRC system and Georgia's rs.ge portal, each with the start dates sources disagree on.
-
E-invoicing page for Azerbaijan
E-invoice Preflight now covers 83 countries: Azerbaijan's State Tax Service e-qaimə portal, with guides dating mandatory use to 2017 or 2018.
-
E-invoicing page for Bolivia
E-invoice Preflight now covers 81 countries: Bolivia's SIN assigns online invoicing modes by taxpayer group; groups 9 to 12 are reported due 1 October 2026.
-
Which way should the carpet roll run? A takeoff option that checks both
The flooring takeoff always ran the roll along the long side. An opt-in setting now tries both directions and keeps the one that uses less carpet.
-
Drywall for a house with one nine-foot wall
The framing takeoff let one wall have its own stud length, but the drywall count still hung every wall to the plan's height. It now follows each wall.
-
A flooring calculator that counts boxes, tiles and carpet seams
The framing takeoff's flooring engine now has its own free page: plank boxes with waste, tiles with thinset and grout, carpet from the roll.
-
Flooring now prices into the framing budget, and a silent drop is fixed
Plank, tile and carpet orders join the wall-framing-takeoff budget with a labor rate, and a bug that dropped them when sheathing nailers were added is fixed.
-
Flooring orders from room sizes: boxes, tile, grout and carpet seams
The framing takeoff now counts finish flooring: plank boxes, tiles with thinset and grout, and carpet strips cut from a roll.
-
Doorway transitions now count in the flooring takeoff
The flooring takeoff counts doorway transition strips as whole bars and puts them in the budget.
-
Framing a wall that steps in height
A wall that goes from 8 ft to 10 ft studs part-way along now takes off as level segments, each with its own end studs, plates and cut list.
-
A 9 ft first floor beside 8 ft walls: per-wall stud length in the framing takeoff
The wall framing takeoff takes a stud length per wall, so a 9 ft wall can sit next to 8 ft ones in one lumber order.
-
How many spare studs should a framing lumber order carry?
The framing takeoff now adds a typed cull allowance: whole spare boards per ordered length, kept apart from the layout order.
-
How many tubes of caulk does a siding job need?
The open-source wall framing takeoff now counts siding caulk from opening perimeters and corner board edges, with the bead size you type.
-
E-invoicing page for Moldova
E-invoice Preflight now covers 82 countries: Moldova's SFS e-Factura, with B2B use reported mandatory from 1 October 2026 after a January pilot.
-
Order-by dates are now on the construction schedule page
Type a supplier lead time per item and the schedule page says which weekday to order so it arrives when the activity starts, and what is already late.
-
Paint gallons from the same plan that gave you the studs
The framing takeoff now turns walls, openings, ceilings and coats into paint gallons.
-
Paint now counts the trim you already ordered
Run --paint with --trim and the framing takeoff paints the same baseboard and casing it lists.
-
Qatar's e-invoicing law: what is confirmed and what is guesswork
E-invoice Preflight now covers 80 countries. Qatar approved a draft e-invoicing law on 6 May 2026, but has published no start date, format or penalties.
-
The two cheap things under every sill plate that a takeoff forgot
Our framing takeoff counted anchor bolts but not the treated sill boards or foam seal under them. For a 39 by 27 ft stem wall that is 10 boards and 3 rolls.
-
Tunisia's El Fatoora e-invoicing, and what is still unread
E-invoice Preflight now covers 86 countries: Tunisia's El Fatoora on the TTN platform, with VAT-liable services added from 1 January 2026 in the guides.
-
A negative quantity, and a left-out line, won the bid leveling
Probing our bid-leveling code: a negative quantity, a repeated bidder, or leaving out a line a rival priced as a lump sum could change who looked cheapest.
-
A real wood-framed IFC wall showed our takeoff framing a window as a door
We ran a small wood-framed IFC wall through our framing takeoff. The model was read exactly, but the page lost every opening height and sill.
-
Can I drill a 1.5 inch hole in a 2x4 stud?
A free page that checks a bored hole, notch or drain pipe against common stud limits. A 1.5 inch hole fails in a bearing 2x4 and passes in a non-bearing one.
-
E-invoicing pages for China and Ukraine
E-invoice Preflight now covers 79 countries: China's e-fapiao is rolling out by region, and Ukraine's tax invoices must be registered in the ERPN.
-
Counting outlets from a wall plan
The wall-framing takeoff counts receptacle and switch boxes and a cable order from the wall plan, by the 6-foot rule.
-
Framing a shed-roof wall: one slope, no peak
The wall framing takeoff now frames a single-slope wall: studs that rise with the roof, plates cut along one slope, and a check against hand arithmetic.
-
How wrong is one stud per foot, and how much waste to add? Measured on three houses
A counted framing order against the one-stud-per-foot rule, the cutting waste in a framing order, and hip vs. gable roof sheathing waste, measured.
-
Nesting the peak: cheaper gable sheathing orders from one more cut
Our framing takeoff already nested the sloped top courses of gable end sheathing on shared sheet pieces. It now handles the course that straddles the peak.
-
Opening two real building models in the browser, with no upload
A Rust IFC reader compiled to WebAssembly opened a 2.4 MB and a 49 MB real building model in Chromium in 0.25 s and 3.9 s, with no upload.
-
Putting outlet boxes on the studs
The wall-framing takeoff now places each receptacle box against a real stud, and flags walls where that breaks the 6-foot rule.
-
Two windows, one king stud, billed as one
A wall-framing budget bug: window setting labour counted king studs divided by two, so windows sharing a king were undercounted. Now it counts header spans.
-
What happens to the framing schedule when the crew is on another job?
The wall-framing schedule page now takes a crew's days off and shows how far the finish date moves.
-
Will a 3-inch drain fit in a 2x6 wall?
The wall-framing takeoff now checks pipe and cable holes against the stud drilling limits. A 3-inch drain does not fit a single 2x6 stud.
-
A 500-inch door and a "garage" opening: two plans a framing takeoff should refuse
Probing hostile wall plans by hand found two that a framing takeoff accepted and answered with confident nonsense. Both are now refused with a reason.
-
A header height of "x" crashed the wall framing takeoff
Probing the wall framing takeoff with bad inputs found two plan fields that slipped past validation: a text header height and a text tee position.
-
A waste factor typed as text ordered ten times the concrete
In JavaScript, 1 + "0.1" is the string "10.1". The slab engine in wall-framing-takeoff now refuses numbers given as text.
-
A wall named [object Object] got a full framing takeoff
Probing the wall framing takeoff with hostile plans found that a wall whose name was an object, a number or a boolean was accepted instead of refused.
-
Ceiling heat loss now has a box on the framing page
The wall framing takeoff's insulation card can now add the flat ceiling under the attic to its heat-loss figure, from the page and not only the CLI.
-
A door and window schedule from the framing plan
The wall framing takeoff now prints a door and window schedule (marks, counts, sizes, headers, sill heights) from the plan's openings.
-
Gable-end nailers now reach the lumber order
A sheathing joint over a wide window on a gable end needs a nailer. The takeoff used to only mention it; now it buys it.
-
A wall length typed as text used to pass the framing takeoff check
A sweep over the framing takeoff's plan, deck, drywall and floor inputs found fields where the text "96" passed as a number.
-
Seven more framing takeoff settings stop accepting numbers typed as text
Eaves, trim, siding, insulation, gutters, dormer and ventilation settings passed the text "12" as a number; they now return a plain error.
-
A calendar feed of e-invoicing mandate dates
87 dated e-invoicing mandate milestones across 48 countries, as a subscribable calendar and a JSON file, generated from one table.