-
A framing takeoff should refuse a bad plan, not crash on it
Probing the wall framing engine with hostile plans found three inputs that threw a raw error instead of a reason. Now they are refused with a message.
-
A branded bid package for framers, built but switched off
The framing takeoff now has a letterhead bid package behind a licence key. No checkout link is set, so it earns nothing yet. What exists, what is unproven.
-
A string that passes a range check
In JavaScript "16" >= 8 is true, so a quoted stud spacing passed validation, and a null offset crashed the wall-framing takeoff with a NaN-inch error.
-
A typo in a price should not become a zero
The framing takeoff's budget silently ignored misspelt price names, which understates a bid. It now lists them and suggests the name it meant.
-
A wall that meets a door: one more plan error the framing takeoff now refuses
The wall-framing takeoff now refuses a plan with a tee wall inside a door opening or two tees closer than a stud, naming the wall and position.
-
What a change order costs: a diff card for the framing takeoff
The wall framing takeoff page can now save a budget as the original and list every line a plan or price change moves, with the effect on cost and bid price.
-
E-invoicing deadlines in the next 14 months: 18 dates, and how sure we are of each
Every dated e-invoicing deadline from 2 November 2026 to the end of 2027 in the mandate table, sorted, with the caveat the table itself records for each.
-
E-invoicing pages for Ghana, Zambia and Tanzania
E-invoice Preflight now covers 72 countries: Ghana's E-VAT is phasing in, Zambia's Smart Invoice is mandatory as reported, Tanzania uses EFD and VFD receipts.
-
Reading wall thickness from an IFC plan
The framing takeoff's IFC reader now reports wall thickness from the body profile and flags walls that look like 2x6 framing. Hand-written files only so far.
-
Japan's invoice-system credit for unregistered sellers dropped to 50% on 1 October
The 80% transitional input-tax credit on purchases from unregistered Japanese sellers ended 30 September 2026. From 1 October it is 50% until 30 September 2029.
-
Luxembourg's e-invoice bill, read at the source
For a week our Luxembourg page rested on law-firm summaries. Today the Chamber's site answered, and the bill text adds a usage fee we had not seen.
-
The typo that quietly gave a wrong stud count
A takeoff tool that ignores a misspelt setting orders the wrong lumber without a word. How the wall-framing takeoff now catches it.
-
A 16 ft garage door header is longer than any stud-grade board
The framing takeoff used to crash on a 195 in garage door header. It now says which piece, which size and what to do.
-
A third house for the lumber allowance test: ganged windows and a 16 ft garage header
The allowance bench skipped a generated house that would not lay out; ganging close windows and allowing 24 ft headers adds it. Per-foot rule: +10 to 27%.
-
What does the bid come to per foot of wall?
The framing takeoff's budget now states the bid price per linear foot of wall next to the cost figure, once overhead or profit is typed.
-
Bid price per square foot, straight from a framing takeoff
The free wall-framing-takeoff budget now reports bid price per sq ft of floor, after overhead and profit, next to cost per sq ft.
-
E-invoicing pages for the Dominican Republic, Costa Rica and Kazakhstan
E-invoice Preflight now covers 64 countries. The Dominican Republic has two deadlines this month, with Costa Rica 4.4 and Kazakhstan's VAT control also new.
-
Every labor rate the framing budget reads is now named on the page
The takeoff page's price box now lists all thirteen typed labor rates, and a test keeps the list in step with the budget engine.
-
Five more e-invoicing country pages: Thailand, Taiwan, Oman, Pakistan, Jordan
E-invoice Preflight now covers 61 countries. The five new pages show what each system is and, just as usefully, where the English-language sources disagree.
-
From cost to bid price: overhead and profit in the framing budget
The free wall-framing takeoff's budget now adds a builder's overhead and profit to the cost and reports the bid price and the real margin.
-
A framing budget per linear foot of wall
The framing takeoff budget now reports its total divided by the feet of wall in the plan, next to the per-square-foot-of-floor figure.
-
Cash float on a house build should use what you bill, not what you spend
The free framing takeoff can now bill draws at cost plus a typed markup, so retainage held and the peak cash you float are computed on the invoice.
-
The framing proposal now runs in the browser
A builder can type prices, add permit and dumpster allowances, and download a customer letter from the framing takeoff page without a command line.
-
A French e-invoice that passes the BR-FR rules: what it must carry, measured
Every French e-invoice our creator wrote failed five BR-FR rules. Its France profile now passes them; a micro-entrepreneur invoice, one mistake at a time.
-
From a framing takeoff to a proposal a customer can read
The framing takeoff turns its priced budget into a customer letter with no visible margin, and refuses to issue one while any line is unpriced.
-
Siding a gable end with a window in the triangle
The wall-framing takeoff used to clip a gable window at the eave line, over-counting siding and house wrap. It now cuts the triangle's courses round the window.
-
E-invoicing pages for Guatemala, Panama and Uzbekistan
E-invoice Preflight now covers 67 countries: Panama's 2026 provider duties, Guatemala's FEL certifiers, Uzbekistan's EHF clearance, and where sources disagree.
-
Do horizontal sheathing sheets need nailers? The framing takeoff says no, and checks it
A roadmap line said nailers for horizontal sheets were missing. Joint blocks already cover it, and a new test checks staggered blocking rows beside a window.
-
Free house plans now come with every wall framed, stud by stud
Open House Plans now frames every wall of a generated house stud by stud, with framing elevations, a cut list and the board order, like the Shed Designer.
-
How much cash does a builder float between spend and draw?
The schedule tool now turns typed draw terms, a payment lag and retainage, into the deepest gap between cash paid out and cash received.
-
Labor for siding and trim in a framing budget
The framing takeoff's budget now turns a typed siding rate (per sq ft) and trim rate (per foot) into labor lines tied to the model's own quantities.
-
Permits and delivery in a framing budget: typed allowances
The framing takeoff's budget now takes typed lump sums for permits, delivery and equipment, counted before overhead and profit.
-
Philippines joins the e-invoicing country pages
E-invoice Preflight gets a Philippines page: the BIR Electronic Invoicing System, the reported 31 December 2026 deadline, and where sources disagree.
-
Pricing the labor on a dormer in a framing budget
The framing takeoff's budget now adds a dormer labor line from a typed rate per square foot of dormer roof, and leaves it unpriced when you type none.
-
A payment schedule for the framing proposal
The customer proposal now splits its price into typed milestone payments that add up to the cent.
-
Slovenia's e-invoice law: which gazette issue, and when it applies
The Slovenia mandate page had conflicting enactment dates from advisory sources. The gazette listing settles most of it; transitional articles unread.
-
The dormer the budget forgot
The framing takeoff's budget now prices a dormer's lumber by board foot and its roof by area, from typed prices only.
-
E-invoicing pages for Uganda and Rwanda
E-invoice Preflight now covers 69 countries. Uganda's EFRIS reportedly added twelve sectors in 2026; Rwanda's EBM has a reported September 2026 order.
-
A price picker for the framing budget
The wall-framing takeoff budget card now has a dropdown that adds any price name the engine reads to the price box.
-
What does a framing change cost? A change-order diff for the takeoff
The framing takeoff can now compare two plans and show the budget difference line by line, so a design change has a price before anyone argues about it.
-
What does a design change cost? A free change-order page
A free browser page that diffs a budget before and after a design change, line by line, listing unpriced lines instead of guessing.
-
What will this house cost to heat, gas furnace against heat pump?
The framing takeoff turns its seasonal heat loss into a yearly fuel quantity and cost per heating system you type, with no prices or efficiencies shipped.
-
A concrete calculator that orders in quarter yards
Slab, footing strip or piers in; cubic yards, a ready-mix order and bag counts out. A 12 x 12 ft slab at 4 in is 1.78 yd and an order of 2.
-
A drywall calculator that counts the cuts, not just the area
Room size, doors and windows in; sheets, screws, tape and compound out. A 12 x 12 ft room is 15.9 sheets by area and 17 to buy.
-
A floor cantilever field on the framing page
The wall-framing takeoff page can now frame a floor whose joists, rim and subfloor run past the back support, as the command line already did.
-
Air leakage joins the wall-framing heat load
The wall-framing takeoff now turns a blower-door ACH50 result into infiltration heat loss alongside walls, windows, slab edge and ceiling.
-
Why the lowest bid is often not the lowest
A free bid leveling page: type a scope and each sub's bid, and see what the bids cost once short quantities and left-out items are priced.
-
Can you drill that joist? A hole and notch check for floor framing
wall-framing-takeoff now checks plumbing holes and notches in floor joists against typed depth-fraction limits and reports which ones fail.
-
Cantilever joist tip deflection: choose your own limit on the page
The wall-framing takeoff page can now set the tip deflection ratio for a cantilevered floor joist instead of fixing it at 2a/180.
-
Checking a cantilevered floor joist from your own figures
The wall-framing takeoff now checks the joist behind a floor overhang: bending, shear, tip deflection and uplift at the near support.