-
Fixing a Saudi e-invoice's arithmetic: 42 of 258 seeded faults to 257
Our UBL repair declined all 19 of ZATCA's example invoices. Now it puts back 257 of 258 faults we planted in them, and every repaired file passes.
-
A Saudi e-invoice can state two VAT totals, and no rule checked they agree
Every SAR invoice under ZATCA states its VAT total twice, and no published rule checks the two agree. Now 17 of 17 planted mismatches are flagged.
-
Romania's e-invoices are checked against an older rulebook than ours
Romania's CIUS-RO 1.0.9 is built on EN 16931 1.3.8, so a newer rule, UBL-SR-53, rejected ANAF's own good examples. Running the right base fixed it.
-
The authorised NF-e that corrected the formula: 35 real files against an NF-e checker
We ran the new NF-e checker on 35 open-source NF-e files. An authorised import invoice leaves the duty out of vNF, so the checker now accepts both readings.
-
Sizing house water pipes with Hunter's rule, computed exactly
Free house water pipe sizing by Hunter's 99% rule, computed exactly. On a two-bath example the normal approximation picks a 3/4 in main; exact needs 1 in.
-
Saudi e-invoices put tax on every line, and our checker counted it twice
Reading every TaxTotal in a ZATCA invoice as the document's raised false tax errors on all 19 of ZATCA's good examples. Reading only the root fixed it.
-
The UAE line amount that no rule checks
PINT UAE makes every line state its VAT and amount payable, but no rule checks they add up. We added INV-060 and tested it on seeded faults.
-
TD07, TD08, TD09: Italian invoice codes the FatturaPA schema refuses
Our FatturaPA checker passed TD07-TD09 and failed invoices with two withholdings. Moved to the spec 1.9 schema (XSD 1.2.3), it now agrees with xmllint.
-
UAE e-invoices state every line's VAT twice, and our repair button ignored the second one
UAE e-invoices restate each line's VAT and amount payable. Of 76 we planted wrong in OpenPeppol's examples, the repair fixed none; now it fixes all 76.
-
Checking a Mexican waybill: what 322 public Carta Porte files showed
A free offline check for Mexico's Carta Porte 3.1 waybill, run on 322 public CFDI files: 21 schema-valid, and a bug in our own decimals check.
-
Mechanics lien deadlines in sixteen states, now with Michigan, Minnesota, Nevada, Oregon, Utah and Virginia
Lien filing deadlines for subcontractors in sixteen states, with the statute for each, in a free calculator and on every job in PayApps.
-
The e-invoice checker API now runs Singapore and Saudi rules
The self-hosted e-invoice preflight API gave Singapore InvoiceNow and Saudi ZATCA files the EU rules. It now runs each file's own published rule set.
-
A framing takeoff that ignored a mistyped option
wall-framing-takeoff used to ignore any option it did not know, so a typo gave a plain lumber order with no warning. It now stops and suggests the right option.
-
February 30th is no longer March 2nd in the construction schedule
The wall-framing takeoff's schedule and order-by dates now refuse a calendar day that does not exist instead of quietly reading it as the next month.
-
Wall framing takeoff: order-by dates now say why the schedule was refused
The order-by-date command used to say only that the schedule had problems. It now names the problem.
-
A malformed plan file now gets a plain sentence as its error
The wall-framing takeoff command line now names what is wrong with a plan file of the wrong shape, instead of printing a raw JavaScript error message.
-
Probing every layout function in a framing tool for raw crashes
A sweep of every layout function in wall-framing-takeoff with null, empty and NaN input found one that threw a TypeError.
-
Batching new rows made whole-house lumber ordering a third faster
Adding a round's new cutting patterns to the LP together, then pivoting once, cut a 950-piece lumber order from about 3 s to about 2 s.
-
Is exact steepest-edge pricing worth building for a lumber cutting-stock LP?
Removing the row-norm term from a dual simplex leaving-row rule slows a 950-piece lumber order from 1.5 s to 2.3 s; exact weights would gain little.
-
Ethiopia has an e-invoicing directive but no deadline yet
Ethiopia issued e-invoicing Directive 1142/2026 in mid-2026, but the compliance schedule is unpublished. What sources agree on and where they differ.
-
Six more raw TypeErrors gone from the wall-framing takeoff
Calling every wall-framing-takeoff export with null found six more that threw an unhelpful TypeError; now each says what it needs.
-
Choosing the simplex row by its norm cut a lumber-order solve by a third
A one-rule change in the dual simplex of a framing lumber optimiser took a 950-piece order from 1.9 s to 1.4 s, still within 0.06% of the LP bound.
-
A whole-house lumber order on a real Revit model: 48 seconds to 7
Three floors of a real wood-frame house, 978 pieces, one lumber order within 0.04% of its lower bound, now in about 7 seconds of CPU.
-
Warm-starting the cutting-stock LP: 7.5 s to 5.1 s on a whole house
Adding each round's cutting patterns as rows to the last optimal tableau, instead of re-solving, cut a 950-piece lumber order from 7.5 s to 5.1 s.
-
Which e-invoice deadline applies to a Malaysian business?
The free e-invoice deadline selector now places a Malaysian business in its MyInvois phase from one turnover figure.
-
A board foot calculator that says which size it counted
A free board foot calculator that counts lumber on the sold size, shows the milled size beside it, and handles hardwood quarters and cost.
-
A whole-house lumber order that stopped hanging
Ordering a three-storey house's framing lumber as one cutting-stock problem hung for 12 minutes; a dual bound and column pruning cut it to 48 seconds.
-
Advanced framing on a real house: the saving held at about 27%
The advanced-framing bench, run on a real Revit house instead of invented plans: all three details plus 24 in spacing cut the lumber order 24 to 28% per floor.
-
Framing allowance rules against a real house: one is close, one over-orders by a quarter
Two common stud-count rules of thumb set against a counted lumber order on a real three-floor house, with the numbers and what they do not show.
-
How many cubic yards of mulch, topsoil or gravel do you order?
A free page now turns bed sizes and a depth into cubic yards to order, tons and bags, with the arithmetic shown.
-
Catching a mistyped Kazakhstan BIN before the invoice leaves
einvoice-preflight now checks the 12th digit of a Kazakhstan business identification number, pinned on a hand-computed number.
-
Poland's KSeF penalty deferral: where the bill stands on 8 November
The bill that would move KSeF penalties from 1 January 2027 to 2028 had its first Sejm reading on 21 October; it is not law yet.
-
Latvia's e-invoice date: what is confirmed and what is not
Latvia moved mandatory B2B e-invoicing to 1 January 2028. We corrected our page: the date is solid, whether tax-authority reporting moved with it is not.
-
Lithuanian 12-digit VAT numbers now get a check-digit test
einvoice-preflight now checks the final digit of 12-digit Lithuanian VAT numbers, offline, instead of only their shape.
-
Moving a Door to Another Wall in the Framing Sketch Editor
The sketch editor's engine can now move a door or window to a different wall in one step, with the same overlap and fit refusals as placing one.
-
Stacking three real floors: it works, and it takes five minutes
Two runs of the wall-framing takeoff's --stack on the Schultz Residence floors agree it saves about 0.3%, and show the solve is slow.
-
One flag frames all three floors of a real house
The wall-framing takeoff's --whole-house flag, run on the Schultz Residence IFC, matches the four-flag form and skips no wall.
-
When the Door Is as Tall as the Wall: framing takeoffs from messy BIM models
Four walls in a real house model were refused: the header was deeper than the room under the plates. A new flag swaps in the deepest header that fits.
-
Which e-invoicing deadline applies to my business?
A one-number selector for the six countries whose e-invoicing start date depends on business size.
-
A lumber size called toString got through the framing validators
Eleven size lookups in the wall-framing tools used the JavaScript
inoperator, so names like toString passed validation and crashed or returned null orders. -
A real wood-frame house breaks our IFC reader in useful ways
We ran a real US wood-frame house through the framing takeoff: 30 of 102 first-floor walls were concrete, and doors at wall ends still block framing.
-
A stair wall's cutouts were being framed as a door
Dropping floating low voids as stair cutouts lets the takeoff frame the Schultz Residence first floor: 213 pieces, 0.19% over the cutting-stock bound.
-
Is e-invoicing mandatory in Bangladesh? The sources disagree, so we say so
A 2026 country booklet says no binding Bangladesh e-invoicing mandate exists; vendor pages say it has phased in since 2019. A new free page lays out both.
-
The concrete calculator now plans the saw cuts, not just the truck
A slab order says how much concrete to buy. The free calculator now also prints control-joint panels, saw-cut feet and cut depth from a checkable rule of thumb.
-
Counting stucco from the wall plan: bags, lath and trim for an exterior
The framing takeoff now counts cement stucco over metal lath from the same walls and openings the siding uses, with every assumption typed and visible.
-
A door and window schedule from typed walls, in the browser
Type walls and openings, get D1/W1 marks, counts, rough openings, headers, sill heights and a CSV. Same engine as the whole-house framing takeoff.
-
A 37 inch wall with a 32 inch door in it
A real Revit house exports door jambs as short walls; a new ifc-engine flag drops them, clearing one of three 2nd floor refusals.
-
Two more e-invoicing deadlines: El Salvador's DTE 2.0 and Mauritania's public-supplier declaration
El Salvador's DTE 2.0 rules are reported due 1 Dec 2026; Mauritania's STT declaration for public suppliers from 1 Nov 2026. What guides say, where they differ
-
Estonia's Accounting Act names no 2027 e-invoice mandate
We read Estonia's Accounting Act in Estonian. The buyer's right is real, the register is the commercial register, and 2027 is not in the law.
-
Half a bedroom: a ventilation input check
The ventilation field on the insulation page accepted 2.5 bedrooms and gave a ventilation rate for a house that cannot exist. Now it wants a whole number.