-
Arizona's preliminary 20-day notice: who gets it, the deadline, and the statutory form
A.R.S. § 33-992.01 for subs and suppliers: who gets the 20-day notice, the deadline, a late notice, proof of mailing, and the form.
-
Deck framing takeoff: joists, beam, posts, footings, decking boards, guard and hardware
A worked 16 x 12 ft deck takeoff: joists, beam, posts, footing bags, decking rows, guard and hardware, plus the joist, beam, post and ledger checks.
-
How to lay out a stair: risers, stringers, stairwell headroom, landings, winders and guards
Lay out a house stair from one number, the total rise: risers, stringers, stairwell opening, landing, winders, guards and the order, with every sum shown.
-
You received an XRechnung and it opens as code: how to read it
Every German business must accept e-invoices since 2025, and an XRechnung is XML with no page. How to read one, field by field, with a free browser viewer.
-
The ISO 9001 master document list: what a small shop's spreadsheet already has, and what it is missing
What an auditor reads first on a machine shop's master document list, three gaps most spreadsheets hide, and how to import yours without retyping it.
-
Roof takeoff for a house: rafters, sheathing, shingles, flashing, soffit, fascia, gutters and attic vents
One worked roof takeoff on a 28 x 40 ft house: rafters, sheathing, shingles, ice shield, soffit, fascia, gutters and attic vents, every count shown.
-
An e-invoice validation API for software vendors, priced per invoice: €1.40 per 1,000, €0.04 with errors
How the metered e-invoice API bills vendors: €19 minimum, €1.40 per 1,000 clean or plain-validated invoices, €0.04 per invoice with errors explained.
-
Florida's Notice to Owner for subcontractors: the form, the 45 days and the 40-day mailing rule
Fla. Stat. § 713.06 for subs and suppliers: who serves a Notice to Owner, the 45-day deadline, the form, copies, and the 40-day mailing rule.
-
How many nails, hangers and hurricane ties does a house frame need?
Count framing nails, joist hangers, hold-downs, hurricane ties and deck ledger screws from the wall layout, with the sums shown and the schedule yours to set.
-
432 small machine shops sold to DoD directly last year. Everyone else gets CMMC from a prime
FY2025 federal award data: 432 small businesses held DoD prime contracts coded machine shop. Most defense machining, and CMMC, reaches shops via primes.
-
Keeping material prices current in machine-shop quotes
Rate cards typed in once quote old metal prices. Date each price, import supplier sheets, keep cwt and metre exact, edit bar setups, see quotes touched.
-
Peppol invoice rejected in Belgium: what the error codes mean, now explained in Dutch
35 EN 16931 and Peppol rules that reject invoices, each explained in Dutch, French, German and English with a fix and corrected XML. Free, no upload.
-
Not paid on a public job: the Miller Act 90-day notice and the states that cap retainage
No lien on public property. On federal jobs the payment bond and its 90-day notice protect a sub; on state jobs, 16 states cap retainage. What the statutes say.
-
Home office and equipment deductions for resellers: the storage room and the camera
Resellers' home storage on Schedule C line 30, small equipment under the $2,500 de minimis safe harbor, and a laptop through Form 4562, with worked numbers.
-
Not paid on a state or city job? Bond claim deadlines in thirty-one states, read from the statutes
No lien on public work, so subs claim on the payment bond. The notice and suit deadlines in 31 states, read from each state's statute.
-
A subcontractor's three-week lookahead: keeping your own schedule when the GC's slips
A subcontractor's own lookahead: check its sequence, skip holidays, start from the GC's P6 file, move it after a slip, log delays by activity.
-
Texas retainage notice for subcontractors: the 30 days after your work ends, and the affidavit after it
Tex. Prop. Code § 53.057: when the Texas retainage notice is due, what a terminated GC contract does to it, the § 53.052(d) affidavit, and worked dates.
-
Is that VAT number mistyped? What a check digit catches on an e-invoice, country by country
Which countries' VAT and tax numbers carry a check digit, how many typos each one misses (measured), and the valid numbers a careless check rejects.
-
What CMMC costs a small business, from DoD's own line-by-line estimate
DoD priced every CMMC assessment in the final rule: $5,977 a year at Level 1, $104,670 over 3 years for certification. What it leaves out, and your own rates.
-
Before an accountant uploads client e-invoices: the processing agreement, now in German and French
An accountant checking clients' e-invoices passes on their personal data, so GDPR Art. 28 needs a processing agreement. Ours now reads in German and French.
-
Daily reports for subcontractors: what to write each day so a dispute has a record
What a subcontractor's daily report should record each day, which photos to keep with it, how to catch missed days, and why it is not a delay notice.
-
Federal grants a small nonprofit can apply for: 471 on Grants.gov, about 71 that are not research
Of 471 Grants.gov opportunities open to a 501(c)(3) on 26 Nov 2026, 400 were research. Of the other 71, just 7 capped awards at $100,000 or less.
-
How long are the hips and valleys on an L-shaped hip roof?
Hip, valley and ridge lengths for an L-shaped hip roof, and its sheathing by hand, with hip cut-offs reused at valleys and at the next course's hip.
-
Following up on machine-shop quotes without a sticky-note system
Sent quotes go quiet and nobody calls. How a job shop can track quote follow-ups, and how Job Shop Quote schedules each call and emails the estimator.
-
Rabatt, Skonto and Frachtkosten: where a discount goes when your PDF invoice becomes an e-invoice
Where a row discount, an invoice discount, Skonto and freight go in a ZUGFeRD or XRechnung e-invoice, and how our PDF converter reads them.
-
Close-out documents: what a subcontractor sends to get retainage released
The close-out documents a subcontract usually asks for, where to find the list, how to deliver them as one binder, and what to send with the release request.
-
Subcontractor estimating: price the bid from your costs, then bill from the same numbers
Price a bid from costs and a price list, add alternates, send prices only, follow up, then start the job's schedule of values and labor and material budgets.
-
The submittal that holds up your material: three dates a subcontractor should watch on every job
Start the submittal log from the spec, find the last day to send each one and the overdue ones across jobs, and read what the stamp said.
-
Your UBL invoice passed the rules and was still rejected: the schema comes first
Peppol and XRechnung validators run the UBL 2.1 XSD before any rule. The seven ways a file fails it, checked to match xmllint on 21,719 of 21,726 files.
-
Unit-price pay applications: billing by quantity installed, to the cent
Billing a unit-price subcontract each month: quantity × unit price per line, rounding, quantities to date, change orders and GCPay's unit-price SOV.
-
Filling out the WH-347 certified payroll every week: a subcontractor's guide
The WH-347 column by column for Davis-Bacon subs, the checks before sending it, the CA, NY, WA, IL and NJ files, and Oregon's monthly due date and 25% hold.
-
Which clients' e-invoices still fail? One table for the whole practice
Before the 2027 deadlines, a practice needs to know which clients still send failing e-invoices. Our workspace now shows every client in one table, with a CSV.
-
From a won machine-shop quote to a QuickBooks invoice without retyping it
Job shops retype won quotes into QuickBooks. What goes wrong (quantity breaks, the PO, currency) and how Job Shop Quote sends the invoice at the quoted prices.
-
"This element is not expected": the XRechnung CII schema errors, and the three we found in our own examples
Why a CII e-invoice with correct amounts fails the schema check: element order, missing elements and the udt/qdt namespace slip, and what our checker reports.
-
ZUGFeRD MINIMUM and BASIC WL are not e-invoices in Germany, and our checker now says so
The BMF counts XRechnung and ZUGFeRD from 2.0.1 as e-invoices except MINIMUM and BASIC WL. How to spot the profile, and what our checker reports.
-
A free pay application template in Excel whose totals cannot drift
The pay application generator now downloads a blank .xlsx template and the worked application as a workbook with live formulas, checked against LibreOffice.
-
A CMMC Level 1 self-assessment with the FAR text checked word for word and all 59 objectives
A free CMMC Level 1 checklist for small shops: the 15 FAR 52.204-21 requirements, checked word for word, judged by their 59 NIST SP 800-171A objectives.
-
A first article inspection checker that reads the drawing's callouts and flags what gets an FAI sent back
Paste a first article's ballooned characteristics and results: each callout read into limits, each result judged, and a Form 3 style CSV. Free, in the browser.
-
How to quote a laser or plasma cutting job from a DXF: cut length, pierces and sheets
Price a laser, plasma or waterjet job from its DXF files: nest the parts, time cut length and pierces at your speeds, charge the sheets, price each part.
-
A NIST 800-171 SSP template that tells you what an assessor would send back
A free NIST SP 800-171 system security plan template for small shops: fill it in the browser, see what is missing, download the SSP and POA&M.
-
Procore, Textura, GCPay and Trimble Pay for subs: filling the GC's templates and invoices without retyping
Procore SSOV import and invoice, Textura billing upload, GCPay SOV upload and Trimble Pay's Flashtract template, filled from your pay app.
-
How many days a GC has to pay you, read from seven states' prompt payment laws
Texas gives a GC 7 days, Illinois 15. Prompt payment deadlines in seven states, and which states void pay-if-paid clauses, with a clause reader.
-
Quoted vs actual hours: your finished jobs already know how far off your quotes are
Paste your job history and see, per machine, how far quoted setup hours and cycle times ran from actuals, what that cost, and the factor for the next quote.
-
Drawing review: read a customer's part drawing PDF before you quote
Drop a part drawing PDF: title block, revision table, general tolerances, notes and callouts read in your browser, and questions for the buyer. Free.
-
QuickBooks has no retainage field: how subcontractors track it anyway
QuickBooks Online cannot hold back retainage on an invoice. The Retainage Receivable account and item, the release invoice, and the report that hides it.
-
Stock size from a STEP file, without opening CAD or uploading the model
Drop a STEP or STL file: bounding box, round bar, stock to cut and a first cycle time from your own feeds, in the browser. Checked on 68 parts.
-
T&M tickets and RFI answers: the extra work subcontractors do for free, and how to find it
A signed T&M ticket or an RFI answer that adds scope is not money until it is on an executed change order. How to log both and find the ones at risk.
-
Which states make you use their lien waiver form, read from the statutes
Nine states set lien waiver wording in statute. We read each one from the legislature's own published text: how many forms, how strict, and the trap in each.
-
74 e-invoice validation errors explained in English, German and French, checked against the rules themselves
One page per XRechnung, EN 16931 and Peppol rule in three languages. Each is built from the official rule text and the code that runs it, not the message.
-
One page for online sellers: the problems first, then the tools
A new page for resellers on eBay, Poshmark, Etsy, Mercari, Whatnot and Depop: six problems, the books product in development, and 15 hand-picked free tools.