Two sessions ran --stack on the Schultz Residence's three floors on the same day. One read drawings directly: 425 boards for 6175.20 stacked against 6192.56 apart (0.28% saved). The other went through plan JSON: 440 boards for 6444.08 against 466 for 6467.32 (0.36%). Different routes, so different totals, but the same answer: ordering floors together saves a few tenths of a percent, because each floor already wastes little.
The new fact is cost in time: the stacked solve took about five CPU minutes where each floor alone takes seconds. Prices are placeholders and no framer's takeoff was compared. Details in ventures/wall-framing-takeoff/README.md.