For your business
-
Arizona's preliminary 20-day notice: who gets it, the deadline, and the statutory form
A.R.S. § 33-992.01 for subs and suppliers: who gets the 20-day notice, the deadline, a late notice, proof of mailing, and the form.
-
Deck framing takeoff: joists, beam, posts, footings, decking boards, guard and hardware
A worked 16 x 12 ft deck takeoff: joists, beam, posts, footing bags, decking rows, guard and hardware, plus the joist, beam, post and ledger checks.
-
How to lay out a stair: risers, stringers, stairwell headroom, landings, winders and guards
Lay out a house stair from one number, the total rise: risers, stringers, stairwell opening, landing, winders, guards and the order, with every sum shown.
-
You received an XRechnung and it opens as code: how to read it
Every German business must accept e-invoices since 2025, and an XRechnung is XML with no page. How to read one, field by field, with a free browser viewer.
-
The ISO 9001 master document list: what a small shop's spreadsheet already has, and what it is missing
What an auditor reads first on a machine shop's master document list, three gaps most spreadsheets hide, and how to import yours without retyping it.
-
Roof takeoff for a house: rafters, sheathing, shingles, flashing, soffit, fascia, gutters and attic vents
One worked roof takeoff on a 28 x 40 ft house: rafters, sheathing, shingles, ice shield, soffit, fascia, gutters and attic vents, every count shown.
-
Arizona's preliminary 20-day notice: who gets it, the deadline, and the statutory form
A.R.S. § 33-992.01 for subs and suppliers: who gets the 20-day notice, the deadline, a late notice, proof of mailing, and the form.
-
Deck framing takeoff: joists, beam, posts, footings, decking boards, guard and hardware
A worked 16 x 12 ft deck takeoff: joists, beam, posts, footing bags, decking rows, guard and hardware, plus the joist, beam, post and ledger checks.
-
How to lay out a stair: risers, stringers, stairwell headroom, landings, winders and guards
Lay out a house stair from one number, the total rise: risers, stringers, stairwell opening, landing, winders, guards and the order, with every sum shown.
-
You received an XRechnung and it opens as code: how to read it
Every German business must accept e-invoices since 2025, and an XRechnung is XML with no page. How to read one, field by field, with a free browser viewer.
-
The ISO 9001 master document list: what a small shop's spreadsheet already has, and what it is missing
What an auditor reads first on a machine shop's master document list, three gaps most spreadsheets hide, and how to import yours without retyping it.
-
Re-audit: the clothing studio's pattern now passes its own spec sheet
Measured off the drafted pieces, the clothing studio's tee, long sleeve, crewneck and hoodie patterns pass the tech pack spec in all 24 garment-size pairs.
-
Re-audit: the COI tracker's fix closed 5 of 10 defects, and a GL policy could pass as workers' comp
A re-check of the free COI tracker: 5 of 10 earlier defects fixed, four untested bugs still passing, and a GL row read as workers' comp. Now fixed.
-
Re-audit: the e-invoice checker now agrees with CEN's own validator, and meets the bar
Fifth audit of the e-invoice checker: 8 of 8 test invoices match CEN's EN 16931 Schematron, 5 of 5 seeded bugs caught, a 10^13 repair bug fixed.
-
Re-audit: the grant tracker stopped drifting, but federal reports still read Overdue weeks early
A re-check of the free grant reporting tracker. The high defect is fixed, the federal due-date gap was only written down, and this round fixes it.
-
Re-audit: Retail Pilot Intel counts the right store on the right Rome day; a till clock still fooled it
Retail Pilot Intel re-checked against its 2026-11-19 audit: the high defect is closed, 6 of 11 fixed, and claims and fitness still miss the bar.
-
Re-audit: the framing takeoff's pipe sizer no longer passes a starved shower
The free framing takeoff's pipe sizer no longer passes a 0 gpm shower branch; six outputs recompute by hand and an untested count now has a test.
-
Re-audit: the XER checker now scores BEI against a real baseline, and its tests still miss three seeded bugs
A re-check of XER Schedule Check against its 2026-11-19 audit. The baseline gap is closed and five of nine defects are fixed; verification still misses the bar.
-
Roof takeoff for a house: rafters, sheathing, shingles, flashing, soffit, fascia, gutters and attic vents
One worked roof takeoff on a 28 x 40 ft house: rafters, sheathing, shingles, ice shield, soffit, fascia, gutters and attic vents, every count shown.
-
A new story: a parish has spent 2.34 million złoty on a hall wing. Should it finish?
A village parish's half-built hall wing costs more to finish every year. A story about the sunk cost fallacy, with every figure in its closing model.
-
An e-invoice validation API for software vendors, priced per invoice: €1.40 per 1,000, €0.04 with errors
How the metered e-invoice API bills vendors: €19 minimum, €1.40 per 1,000 clean or plain-validated invoices, €0.04 per invoice with errors explained.
-
Florida's Notice to Owner for subcontractors: the form, the 45 days and the 40-day mailing rule
Fla. Stat. § 713.06 for subs and suppliers: who serves a Notice to Owner, the 45-day deadline, the form, copies, and the 40-day mailing rule.
-
How many nails, hangers and hurricane ties does a house frame need?
Count framing nails, joist hangers, hold-downs, hurricane ties and deck ledger screws from the wall layout, with the sums shown and the schedule yours to set.
-
432 small machine shops sold to DoD directly last year. Everyone else gets CMMC from a prime
FY2025 federal award data: 432 small businesses held DoD prime contracts coded machine shop. Most defense machining, and CMMC, reaches shops via primes.
-
Keeping material prices current in machine-shop quotes
Rate cards typed in once quote old metal prices. Date each price, import supplier sheets, keep cwt and metre exact, edit bar setups, see quotes touched.
-
Peppol invoice rejected in Belgium: what the error codes mean, now explained in Dutch
35 EN 16931 and Peppol rules that reject invoices, each explained in Dutch, French, German and English with a fix and corrected XML. Free, no upload.
-
Not paid on a public job: the Miller Act 90-day notice and the states that cap retainage
No lien on public property. On federal jobs the payment bond and its 90-day notice protect a sub; on state jobs, 16 states cap retainage. What the statutes say.
-
Quality fix: a canceled Grant Autopilot plan now stops redrafts too
Grant Autopilot checked billing only on a first draft. Redrafts now need a live plan too, and the seller-books audit fixes are on the record.
-
Quality fix: our contract checker read an expense limit as a cap on indemnity
Our contract checker cleared an uncapped indemnity whenever 'limited to' appeared anywhere. Liability and indemnity caps are now read per sentence.
-
Quality fix: our detention sizer treated a riser slot as a full-width weir
Our detention pond sizer treated a riser slot as a full-width weir. Now contracted by default (L' = L - 0.2H), with a warning when the head is too deep.
-
Quality fix: our gate bid priced a 10 ft leaf the same as a 5 ft one
Our driveway gate bid asked for leaf height, printed it on the proposal, then priced nothing from it. Leaf cost and hang hours now scale with height.
-
Quality fix: our Depop calculator said rest-of-world sellers pay no processing fee
Since 22 July 2026 Australian Depop sellers pay 0% plus 2.6% + A$0.30 processing. Elsewhere it's 10% plus processing. Our calculator had both wrong. Fixed.
-
Quality fix: a Bulgarian VAT check digit no test was guarding
When the EGN weighted sum leaves 10, the check digit is 0. Our e-invoice pre-check had it right, but changing the rule left every test green. Now a test fails.
-
Quality fix: every Etsy sale renews the listing for $0.20
Our Etsy listing-renewal page split one $0.20 fee across a four-month window of sales. Etsy auto-renews a listing on each sale, so each sale pays $0.20. Fixed.
-
Quality fix: our porta potty estimate sent 2 to 4 times the units the PSAI chart does
Our event restroom estimate used an uncited table that gave 2 to 4 times the PSAI Special Event Chart's counts. It now uses the PSAI chart, cited and tested.
-
Quality fix: irregular-hours holiday is rounded each pay period, not once a year
Our UK holiday calculator took 12.07% of a yearly hours total. Reg 15B accrues it every pay period and rounds each to the nearest hour. Fixed.
-
Quality fix: our CMMC score counted a requirement as met when one of its objectives was not
Under 32 CFR 170.24, a CMMC requirement is NOT MET if any assessment objective is not satisfied. CMMC Workspace now scores it that way and flags it.
-
Quality fix: our WordPress plugin checker passed a proprietary licence
Our plugin review checker accepted any License value, Proprietary included. It now applies Plugin Check's three licence errors.
-
Quality fix: our freelancer tax set-aside dropped the QBI deduction off a cliff
Above $201,750 of taxable income our set-aside calculator took no QBI deduction at all. The 2026 law phases it out over $75,000. Fixed, with the hand check.
-
Quality fix: our sealcoat bid treated the second coat as a light one
Our sealcoat bid priced the second coat at 110-125 sq ft per gallon with no field to change it. Manufacturer sheets use one rate per coat. Fixed.
-
Quality fix: an unpaid subscription paid before it stopped
MRR Pulse left unpaid and paused subscriptions out of every past month, so their churn never showed. Now they count until they stop, then churn.
-
Home office and equipment deductions for resellers: the storage room and the camera
Resellers' home storage on Schedule C line 30, small equipment under the $2,500 de minimis safe harbor, and a laptop through Form 4562, with worked numbers.
-
Not paid on a state or city job? Bond claim deadlines in thirty-one states, read from the statutes
No lien on public work, so subs claim on the payment bond. The notice and suit deadlines in 31 states, read from each state's statute.
-
A subcontractor's three-week lookahead: keeping your own schedule when the GC's slips
A subcontractor's own lookahead: check its sequence, skip holidays, start from the GC's P6 file, move it after a slip, log delays by activity.
-
Texas retainage notice for subcontractors: the 30 days after your work ends, and the affidavit after it
Tex. Prop. Code § 53.057: when the Texas retainage notice is due, what a terminated GC contract does to it, the § 53.052(d) affidavit, and worked dates.
-
Is that VAT number mistyped? What a check digit catches on an e-invoice, country by country
Which countries' VAT and tax numbers carry a check digit, how many typos each one misses (measured), and the valid numbers a careless check rejects.
-
What CMMC costs a small business, from DoD's own line-by-line estimate
DoD priced every CMMC assessment in the final rule: $5,977 a year at Level 1, $104,670 over 3 years for certification. What it leaves out, and your own rates.
-
Before an accountant uploads client e-invoices: the processing agreement, now in German and French
An accountant checking clients' e-invoices passes on their personal data, so GDPR Art. 28 needs a processing agreement. Ours now reads in German and French.
-
Daily reports for subcontractors: what to write each day so a dispute has a record
What a subcontractor's daily report should record each day, which photos to keep with it, how to catch missed days, and why it is not a delay notice.
-
Federal grants a small nonprofit can apply for: 471 on Grants.gov, about 71 that are not research
Of 471 Grants.gov opportunities open to a 501(c)(3) on 26 Nov 2026, 400 were research. Of the other 71, just 7 capped awards at $100,000 or less.
-
How long are the hips and valleys on an L-shaped hip roof?
Hip, valley and ridge lengths for an L-shaped hip roof, and its sheathing by hand, with hip cut-offs reused at valleys and at the next course's hip.
-
Following up on machine-shop quotes without a sticky-note system
Sent quotes go quiet and nobody calls. How a job shop can track quote follow-ups, and how Job Shop Quote schedules each call and emails the estimator.
-
Quality audit round 108: 0 of 3 sampled at the bar; the job-shop quoting app clears it
0 of 3 sampled subjects meet the bar. The flagship job-shop quote engine matched 7 hand-priced breaks to the cent. Plan roles in AWS read too much.
-
Quality audit round 109: 1 of 3 sampled at the bar; CMMC scoring is exact but under-tested
1 of 3 sampled subjects meet the bar. The CMMC flagship matched hand SPRS scores and all 110 NIST texts but left its POA&M rules untested.
-
Quality audit round 110: 0 of 3 sampled at the bar; the reseller books app's tax lines match by hand
0 of 3 sampled subjects meet the bar. The reseller bookkeeping flagship's Schedule C lines match a hand worksheet, but multi-unit orders lose cost of goods.
-
Quality audit round 111: 0 of 3 sampled at the bar; the grants app's budget math is right, its paywall leaks
0 of 3 sampled subjects meet the bar. The grants flagship's budget math matches by hand, but a lapsed subscription can still redraft with AI.
No post matches.