-
'Over 40 in.' when we had tried 60: three quiet faults in our duct sizer
A red-team run on our free duct sizer found a hard-coded size in a warning, a return trunk that vanished silently, and a JavaScript object-key trap.
-
"You can lose 126% of your dogs": a price-raise table in six calculators that went past 100%
Customers you can lose before a raise stops paying: extra / (contribution + extra). With negative margin it tops 100%, and six of our calculators showed that.
-
A consultant shown $400 instead of $5,000: the SSTB phase-in our QBI calculator skipped
In the phase-in range an SSTB's QBI is scaled, then the wage limit phases in. Our calculator skipped step two and put the $400 minimum in the wrong place.
-
'Back on the 31st', said in November: the dates our reply sorter invented
JavaScript's Date.UTC turns February 30 into March 2. Our reply sorter booked follow-ups on days nobody named, and one huge number could crash an inbox run.
-
Saints by Candlelight 97: Romanos the Melodist, the deacon who could not sing
A bedtime episode on Saint Romanos the Melodist, the Constantinople deacon whose Christmas hymn is still sung, from his hymns and the old calendar's legend.
-
Every "I'm out of the office" our sales agent paused on real mail was typed by a person
Splitting auto-responder notices from people's own away replies cut the sales agent's wrong silent stops from 3.9 to 1.8 per 1,000 real replies.
-
"No. I need to know how many beds" is not a decline: a fifth round on real mail
Fifth round of sales-agent reply fixes, scored once on an unread Enron half: wrong stops 7.2 to 5.5 per 1,000 replies, one right stop lost.
-
The third round of fixes cut 52% of wrong stops on mail we'd read, and 23% on mail we hadn't
Third-round fixes to the sales agent's reply rules, scored once on 9,656 unread Enron replies: wrong stops 10.9 to 8.4 per 1,000, right stops 47 to 46.
-
"I'm out Friday" is not an away notice: a fourth round on real mail
Fourth round of sales-agent reply fixes, scored once on an unread Enron half: wrong stops 7.2 to 5.0 per 1,000 replies, one right stop lost.
-
Drop your mailbox export on the page: 32,211 real emails, and the bug they found
Sales Agent now opens .eml and .mbox exports in the browser, nothing uploaded. A 90 MB mbox of real Enron mail also turned up a crash and a bounce bug.
-
Our sales agent now checks your Sent folder before it tells you who to email
The self-hosted Sales Agent reads five header fields from your Sent folder, so today's queue drops emails you already sent. And IMAP refuses Node's "Sept".
-
Your sent folder already knows which follow-ups you made
Sales Agent now reads your sent mail from a Takeout or Thunderbird export, so follow-ups you already sent are not queued again. Checked on 7,836 real emails.
-
When the held-out half says stop: a rule round that halved errors and changed nothing
Round seven halved wrong stops on its tuning half, then moved one stop in 90 on unread Enron mail: 4.0 to 3.9 per 1,000. Why, and what comes next.
-
We fixed 140 wrong stops on mail we'd read. On mail we hadn't, it was 83.
Second-round fixes to the sales agent's reply rules, scored once on 9,584 unread Enron replies: wrong stops 17.8 to 9.2 per 1,000.
-
Two blind readers, one inbox: how much of a classifier's score is the grader
Two blind readers agreed on 81% of 107 real replies, and the reader moved the score as much as a round of fixes. Round six: 5.6 to 4.3 wrong stops per 1,000.
-
Our sales agent's second opinion was trained on 120 replies. We had 792.
The sales agent's word model now trains on 792 labelled replies. Scored set by set on data it never saw, it reads 28 of 57 hard replies right, up from 19.
-
Same breaks as the Bundesliga, far less carry-over
Capping home/away breaks, then evening out carry-over, gives an 18-team season with the Bundesliga's 48 breaks and 38 to 50% less carry-over.
-
Saint Scholastica and the storm at supper: a Little Lamps bedtime story
New Little Lamps story: Saint Benedict would not stay late, so his sister prayed, and a storm came out of a clear sky. Told from Gregory's Dialogues.
-
Seven columns of road casualties on paper: a change report that prints whole, and the seat-belt law
The several-column change report now prints wide sets whole. On seven UK road-casualty series, 1969-84, the joint fit dates the 1983 seat-belt law.
-
Seven steps or three jumps? Canada's fertility rate in a change report
A flat-segment model cuts Canada's 1931-1968 fertility rate into 8 pieces. A model whose level may wander finds 3 jumps. The branded report now prints either.
-
Shift roster builder: a dive that backtracks, and where 80-person weeks stop
Letting the root dive retry after a dead end rescues a few small weeks and narrows a 60-person pay gap; at 80 people the limit is pricing, not search.
-
Shift roster builder: the rest rule as a bound, and what 80-person weeks need next
Bounding the pricing oracle by the 10-hour rest rule cut its largest call from 578k nodes to 27k; with the day's speed-ups, 80-person weeks prove in 42-86 s.
-
Shift roster builder: a faster pay oracle, and why it cannot close the last pay gap
The rest-rule chain bound barely helps the pay oracle; three exact cuts take 28-60% off pricing on 40-person weeks. The 60-person pay week stays $1.22 open.
-
Shifts from sales, tried on a real bakery's till: three faults and a backtest
A real bakery POS export showed three faults in the free shift planner. A 38-week backtest found a 4-week half-life beats a plain average.
-
Shift roster builder: the same search, two to three times faster, and 80-person weeks proven
Four exact speed-ups to a JavaScript branch-and-price solver: same nodes and rosters, 60-person weeks in 9-12 s, 80-person weeks proven where HiGHS stalls.
-
Staff for the average hour and you are short half the time
A free shift planner now staffs each hour for a chosen share of past days, not the average. On two real bakeries it cut the cost of short and spare hours.
-
Shift roster builder: sixty-person weeks, proven by pinning what the LP already knows
The LP bound was already the optimum on 60-person weeks; a root dive that pins whole columns now finds the roster in 18-27 s.
-
Staff to the customers, not the money: ticket counts on three real bakeries
Staffing to tickets per hour instead of sales on three real bakeries: hours move from morning to late afternoon in one, nothing changes in another.
-
The shift cut was hiding spare hours: pricing a one-hour peak
Scored after the cut into shifts, a four-hour minimum shift doubled the spare hours. A cost-aware cut fixes most of it on two real bakeries.
-
The plan most people get was still padding its shifts
A cost-aware shift cut shipped today for users who set a short-hour weight. On the default plan too, it saved 8 to 37 person-hours a week at two bakeries.
-
The backtest could not see a locked door
A staffing backtest that counted minimum staff wherever the plan put someone could not see a staffed closure. Fixing it reversed a verdict and found a bug.
-
Our security.txt checker pointed signed files at the wrong line
Red-teaming our RFC 9116 security.txt checker found 3 bugs: wrong line numbers in signed files, a leap second rejected, a quoted charset flagged.
-
Saints by Candlelight 95: Simeon the Stylite and the man who counted the bows
A bedtime episode on Saint Simeon the Stylite, told mostly from Theodoret, a bishop who visited him and wrote about him while he was still on the pillar.
-
Our site build spent most of its first 15 seconds waiting on one file at a time
Copying 1,331 tool folders one file at a time kept our Node.js site build idle. Sixteen at a time cut 4 s per build, with the same output.
-
Sixteen teams, perfectly fair: a schedule built from a finite field
For 16 teams our carry-over search stopped 41% above the best possible value. A 1980 finite-field construction reaches it exactly.
-
Two sessions, one idea, opposite verdicts: what a benchmark guard misses
Two runs tested the same fix for sticky price series. One rule passed, one failed. On real orange-juice prices, the failing rule was right.
-
A sticky card taller than the window hides its own bottom
On an 800 px window, 110 sticky result cards ran past the bottom edge while stuck, hiding their copy buttons. A capped height that scrolls inside fixed 101.
-
Stop the full battery model early instead of swapping in a cheaper one
A 10-cycle DFN run ranks 49 Li-ion electrode designs like a 100-cycle DFN run (Spearman 0.977); a full SPMe run reaches 0.834 in the same time.
-
When a covariate's curves cross: stratified Cox and log-rank, now in the survival tool
Stratified Cox models and stratified log-rank tests, checked against statsmodels: on the 6-MP trial, stratifying by sex moves treatment HR from 4.50 to 2.71.
-
Why the supersede check hung, and how it now finishes in 46 seconds
The check run before closing a pull request ran a whole-tree grep per line. Batching, GNU grep and a length window took it from over 400 s to 46 s.
-
Ten cycles of the full battery model rank cell designs better than a hundred cycles of the fast one
On 128 Li-ion electrode designs, 10 cycles of DFN rank them by 100-cycle energy at Spearman 0.96; 100 cycles of SPMe, same cost, reach 0.64.
-
The tennis-ball feeder's head wants to look up, and that makes the elevation drive easier
Measured from the CAD, the tennis feeder head's weight pulls its nose up at every angle, so one actuator pushes one way, 18 to 100 N.
-
A straight line in degrees is a curve in millimetres: firmware for the tennis feeder's elevation actuator
Spreading the tennis feeder's elevation angle evenly over its actuator's stroke aims up to 1.46 deg high: a 20 m/s drive lands a metre deep.
-
Ten seconds a ball: sizing the drive that meters the tennis feeder's balls
The feeder's listed linear actuator would need 9.7 s a ball. A servo crank needs 1.7 s, and the firmware was counting balls before they reached the wheels.
-
The 23-pixel window that bent our checkerboard
An 11×11 cornerSubPix window misplaced outer checkerboard corners by up to 6.4 px, faking most of a 9 px principal-point shift; cleaner corners made σ worse.
-
The 25% tipping point is a statement about memory, and clustering the committed backfires
In a memory-based naming game the committed minority that flips a convention runs from 11% to 42% with memory; 25% means weighing the last 11 to 13 encounters.
-
The $400 floor: ten of our tax calculators charged self-employment tax on tiny profits
Ten of our tax calculators charged self-employment tax on profits under $433, or checked the $400 Schedule SE floor against the wrong number.
-
Why the little bells are worth almost nothing: tin in a Flemish carillon, and a 2231 story
A new story set in a Flemish belfry in 2231: a 49-bell carillon holds about 6.4 tonnes of tin, and the 24 smallest bells hold under 2% of it.
-
The cold edge sets the stripping date: a free concrete maturity calculator
A new open-source tool reads a temperature logger's CSV and a mix's lab breaks and estimates in-place concrete strength per sensor, by the maturity method.
-
Box D: when the IRS counts your withholding, and why it can move the penalty
The same $12,000 of withholding gives a $52, $285 or $687 underpayment penalty, depending on when it was withheld and whether you check box D.