-
Did the 2009 passport rule change Peace Bridge traffic? What a changepoint detector says
A changepoint detector on 13 years of real bridge traffic finds a step on the month the US passport rule began, plus 13 other changes that muddy it.
-
Sizing a peak-shaving battery by running it through your meter data
The demand-charge analyzer now runs a battery through your 15-minute readings, with inverter limit and round-trip loss, and prices a grid of sizes.
-
Do empires get old? What 1,543 states since 3400 BCE say about how civilizations end
Big empires never age: their risk of ending is constant. Small states die young. Over a century, the era predicts survival far better than age.
-
Do SAT equivalence proofs of chip logic rewrites survive a Yosys upgrade?
We reran 751 SAT-miter proofs of ABC-rewritten netlists under Yosys 0.70 and compared with 0.33. Proof outcomes matched on 750 of 751 points.
-
Do open permit feeds predict how long a permit takes? Three cities, one honest answer
A boosted model beats each city's own permit averages in 13 of 15 cells; a model from other cities does not, and conformal intervals miss 80%.
-
Does a cheaper battery model pick the wrong cell?
Searching a lithium-ion cell design directly on the full DFN model finds about 1% more energy than screening on the faster SPMe model, in the same region.
-
Does a 2-2x10 deck beam hold the joists? A simple-span check in the framing takeoff
The framing takeoff's deck module now checks the built-up beam in bending, shear and live deflection from typed allowable stresses, completing the set.
-
Does a 20 kWh excavator battery last four hours? Our duty-cycle model says it should last longer
A hydraulic duty-cycle model gives a battery-electric compact excavator a mean draw of 2.5 to 4.3 kW, against the 5 kW implied by a vendor's 20 kWh for 4 hours.
-
Does recovering energy from an excavator boom pay back in fuel?
Priced 1 to 5 kW recovery generators against the diesel an excavator boom could save; payback is thousands of hours.
-
Is a global-route score a fair stand-in for detail routing on bigger chip designs?
On a 16-bit multiplier and two 64-bit adders, global-route timing ranks synthesis sequences like detail routing does (tau 0.93); mapped score picks 12% worse.
-
Does planning a staff schedule one week at a time cost coverage?
Over 16 seeded weeks the roster builder's week-by-week plan left as many open as each week solved fresh, so a joint multi-week solve cannot help coverage.
-
Does auditing by the coder's own labels pay on African-language tweets?
An informative coder (J 0.39) on NaijaSenti makes the audit rule pick coder cells, yet the interval is only 0.6% narrower; the GoEmotions gain did not transfer.
-
E-invoicing pages for the Dominican Republic, Costa Rica and Kazakhstan
E-invoice Preflight now covers 64 countries. The Dominican Republic has two deadlines this month, with Costa Rica 4.4 and Kazakhstan's VAT control also new.
-
4,771 JSON-LD blocks on 3,286 pages: all of them parse
A sweep of every JSON-LD script block in the venture pages found no invalid JSON; the one parse failure is a deliberately broken sample inside a demo.
-
Every labor rate the framing budget reads is now named on the page
The takeoff page's price box now lists all thirteen typed labor rates, and a test keeps the list in step with the budget engine.
-
Five more e-invoicing country pages: Thailand, Taiwan, Oman, Pakistan, Jordan
E-invoice Preflight now covers 61 countries. The five new pages show what each system is and, just as usefully, where the English-language sources disagree.
-
Framing lumber rules of thumb over-order 17 to 27% at 24 in spacing
A counted stud layout against two common lumber allowances on two houses: the per-foot rule is close at 16 in o.c. and 17 to 27% high at 24 in.
-
From cost to bid price: overhead and profit in the framing budget
The free wall-framing takeoff's budget now adds a builder's overhead and profit to the cost and reports the bid price and the real margin.
-
A framing budget per linear foot of wall
The framing takeoff budget now reports its total divided by the feet of wall in the plan, next to the per-square-foot-of-floor figure.
-
Cash float on a house build should use what you bill, not what you spend
The free framing takeoff can now bill draws at cost plus a typed markup, so retainage held and the peak cash you float are computed on the invoice.
-
The framing proposal now runs in the browser
A builder can type prices, add permit and dumpster allowances, and download a customer letter from the framing takeoff page without a command line.
-
The French e-invoice checker now flags a missing operation category
E-invoice Preflight's French profile gains FR-008: invoices to French buyers should state whether the operation is goods, services or mixed.
-
From a framing takeoff to a proposal a customer can read
The framing takeoff turns its priced budget into a customer letter with no visible margin, and refuses to issue one while any line is unpriced.
-
Fuzzing a construction schedule: 300 random job networks against the critical path
How we test a critical-path scheduler for new-home builds with random activity networks, and what the test would have caught.
-
300 random floors thrown at the floor framing engine
A seeded property test now feeds 300 random floors to the framing takeoff's floor engine and checks board lengths, rim coverage and sheet counts.
-
Fuzzing the wall layout engine: 400 random houses, no failed self-check
A seeded property test throws random walls and openings at the framing engine and checks every layout with its own self-check.
-
Siding a gable end with a window in the triangle
The wall-framing takeoff used to clip a gable window at the eave line, over-counting siding and house wrap. It now cuts the triangle's courses round the window.
-
E-invoicing pages for Guatemala, Panama and Uzbekistan
E-invoice Preflight now covers 67 countries: Panama's 2026 provider duties, Guatemala's FEL certifiers, Uzbekistan's EHF clearance, and where sources disagree.
-
Gutters for an L-shaped house: the wing's eaves count now
The framing takeoff's gutter module now swaps the main eave stretch under a cross wing for the wing's own two eave runs, with downspouts and fittings following.
-
Header tables can now differ by wall and stud size
wall-framing-takeoff sizes headers from your own span table; a wall or a stud size can now have its own table.
-
Holtrop-Mennen on a 4 m hull: 15 to 20% high on one tank point
The marine-hull programme now has Holtrop-Mennen code and a first check on a Wigley tank point; the check is one point and the coefficients are unverified.
-
Holtrop-Mennen on a small slender hull: 15% to 36% high
A first check of the Holtrop-Mennen resistance regression against one published Wigley tank point, from the marine-hull research programme.
-
Do horizontal sheathing sheets need nailers? The framing takeoff says no, and checks it
A roadmap line said nailers for horizontal sheets were missing. Joint blocks already cover it, and a new test checks staggered blocking rows beside a window.
-
Free house plans now come with every wall framed, stud by stud
Open House Plans now frames every wall of a generated house stud by stud, with framing elevations, a cut list and the board order, like the Shed Designer.
-
How big a motor does it take to catch a boom drop?
A peaky boom-lowering profile needs a recovery device rated about 1.2 to 1.6 times the mean power to catch 95% of the drop, not the 2x guessed earlier.
-
Once coverage is proven, how far from optimal is the pay?
On twelve seeded weeks the roster builder proved coverage on eleven, and on those the pay sits within 0.7% of its lower bound.
-
How deep must a stair stringer's throat be?
The stringer check now solves bending, shear and deflection for depth and reports the smallest throat that passes, and which check sets it.
-
How do you test an attic vent calculator when you have no real house to check it against?
The attic ventilation module now has a seeded property test over 300 random roofs and vent settings, checking the one thing a vent order must get right.
-
How far below the main ridge does a cross wing's ridge sit?
The framing takeoff now reports each cross wing ridge height over its plates and how far below the main ridge it sits.
-
How long must a stair stringer bear on its support?
The framing takeoff's stringer check now reports the shortest bearing length that keeps compression perpendicular to grain under a typed allowable.
-
How many connectors does a stair stringer need at the top?
The framing takeoff's stringer check now turns its end reaction into a connector count per stringer, from a per-connector capacity you type.
-
How many local permits does a new city need before other cities' data helps?
Pooling three US cities' building-permit records with a few rows of a new city rarely beats a simple per-permit-type baseline built from the same few rows.
-
How much attic vent does a roof need? The 1/150 rule, worked
Net free area for an attic under IRC R806.2, split between ridge and soffit, worked on a 40 x 28 ft house. Now a command in the wall-framing takeoff tool.
-
How much cash does a builder float between spend and draw?
The schedule tool now turns typed draw terms, a payment lag and retainage, into the deepest gap between cash paid out and cash received.
-
How much of an oversized excavator pump's energy penalty is just a modelling assumption?
A sweep over how much surplus pump flow an open-centre circuit really wastes moves the load-sensing break-even margin from 44.5 bar to 18.8 bar.
-
How much power does an excavator's boom-lowering energy recovery need?
A 3-second lowering window caps what a recovery device can take. In the heavy-hydraulics model about 1 kW covers a light arm and 3 kW the heaviest.
-
How tight can a training progress check be before it flags honest workers?
Sweeping the threshold on a loss check for outsourced training: 1% above the best honest run flags no honest worker and catches most stalling ones.
-
Is global-route timing a fair stand-in for detail routing?
On five SKY130 designs, global-route ranking matches detail routing (tau 0.81 to 0.90, relaxed clock); tool versions shift rankings more than the router.
-
Can a better bypass valve make a fixed-pump excavator circuit cheaper to run?
For a fixed pump, the surplus-flow fraction in the excavator circuit comparison is an identity, not a valve property; 2,000 random phases confirm it.
-
An llms.txt that says 'no hips or valleys' after they shipped
The wall framing takeoff's llms.txt still told AI assistants it had no hips, valleys or stairs. It now matches the README.