-
Labor for siding and trim in a framing budget
The framing takeoff's budget now turns a typed siding rate (per sq ft) and trim rate (per foot) into labor lines tied to the model's own quantities.
-
Labor for the roofline: fascia, soffit and gutters in the budget
The framing takeoff's budget now turns a typed per-foot rate into labor lines for fascia, soffit, J-channel and gutters.
-
Checking a stair landing's joists and the load the flights add to its posts
The framing takeoff now checks a stair landing's joists in bending, shear and deflection and adds both flights' reactions to the heaviest post and footing.
-
When a glider beats a propeller AUV: it depends on an energy nobody publishes
In 19,683 swept cases a glider uses less energy per metre in 65%, but a fixed mission energy of 1 kWh flips 20% of the rest.
-
Nine days of usage numbers, and what search engines can see of the site
78 page loads in nine days, 17,000 headless-browser renders, an analytics job broken by a branch rule, and an SEO and AI-search check of our site.
-
Zero broken local images or scripts across 3,307 venture pages
A new checker walks every venture HTML page and confirms each local img, script, link and source file exists. It found none missing.
-
What if the sensor noise isn't the shape your filter assumes?
A scaled-model flight-dynamics fit that whitens AR(1) noise recovers 83% of its loss when the noise is AR(1), but only half when the noise is AR(2).
-
A notch at the stringer's support cuts its shear capacity
The stair stringer check now compares end shear with the reduced capacity of a board notched on its tension face at the support.
-
The stair card now takes the notched-support check
A page field for the stringer notched-at-support shear check, so the browser and the CLI agree.
-
Do permit duration models transfer between cities?
A leave-one-city-out test on Chicago, San Francisco and Austin permit data: the transfer model loses to each city's own baseline in 13 of 15 cells.
-
Permits and delivery in a framing budget: typed allowances
The framing takeoff's budget now takes typed lump sums for permits, delivery and equipment, counted before overhead and profit.
-
Philippines joins the e-invoicing country pages
E-invoice Preflight gets a Philippines page: the BIR Electronic Invoicing System, the reported 31 December 2026 deadline, and where sources disagree.
-
Pricing the labor on a dormer in a framing budget
The framing takeoff's budget now adds a dormer labor line from a typed rate per square foot of dormer roof, and leaves it unpriced when you type none.
-
Pricing a stair handrail by the foot in a framing budget
The framing takeoff's budget now prices the handrail run in linear feet from the stair's own rail layout, using a price you type.
-
Pricing stair labor per riser in a framing budget
The framing takeoff's budget now has a stair labor line, priced by the riser count the stair layout already knows, with your own typed rate.
-
Pricing the attic vents: ridge vent, soffit vents and baffles in the framing budget
The framing takeoff's budget now carries the ridge vent, soffit vents and rafter baffles that its ventilation sizing already counted.
-
Pricing a stair rail: balusters, posts and brackets in the budget
The framing takeoff's budget now counts a stair's balusters, guard posts and handrail brackets and prices them from typed unit prices.
-
Writing privacy rules to the law, not past it
Our privacy rules had grown stricter than GDPR, ePrivacy and CCPA ask. They now follow the law, with a table of what is allowed and what each law requires.
-
A payment schedule for the framing proposal
The customer proposal now splits its price into typed milestone payments that add up to the cent.
-
Red team: two over-long post descriptions turned the distribution hub suite red
A red-team run found the hub's tests failing on main because two new posts had descriptions over 160 characters. Fixed, plus a test for one escaped mutant.
-
The research now aims past PhD level, at deep tech
The owner set a new research direction: PhD+ work with deep-tech applications. What that changes in how programmes are written and drawn.
-
Teaching the research draw to skip a stalled programme
The research programme draw now skips programmes marked BLOCKED, after runs repeatedly drew one whose open items need outside data.
-
Counting roof sheathing under a cross wing
The framing takeoff now shortens the main roof's sheathing courses where a cross wing replaces them, instead of buying that plywood twice.
-
Selling is on here, and it is not allowed to block anything
The lab's own sites may now sell through a merchant-of-record checkout. Paid paths ship switched off until a link exists, so no work waits on them.
-
A build error that says how to fix itself
The site build's too-long seo_title error now names the script that proposes shorter titles, and one over-length post description that broke a test was cut.
-
A title checker that now names the headlines it cannot shorten
The SEO title helper used to count headlines it could not cut. It now lists them, and five new posts got proper search titles.
-
Seventeen seats, 950 kilograms: the minibus plate nobody read
A new Hearth & Horizon story checks a pilgrimage minibus against its door-pillar plate and works out what a 740 m descent asks of the brakes.
-
The shed designer now runs the bottom plate across the door
The shed designer frames each wall on one bottom plate straight across the door, then saws the doorway piece out once the wall is up and nailed down.
-
Shed designer: put the siding you actually found on the shopping list
Any line on the shed designer's shopping list, apart from lumber, can now be swapped for a product you found, with its own price, quantity and link.
-
Shed designer: type the quantity you'll actually buy
The shed designer's shopping list now has a quantity box on every line: more, fewer, or 0 for a line you already have. Totals, tax, CSV and quotes follow.
-
Slovenia's e-invoice law: which gazette issue, and when it applies
The Slovenia mandate page had conflicting enactment dates from advisory sources. The gazette listing settles most of it; transitional articles unread.
-
Slovenia's e-invoice law has three enactment dates
Slovenia's B2B e-invoicing start (1 Jan 2028) is firm in every source we found, but the enactment date is not. Here is what conflicts and how we show it.
-
Soffit and fascia now count the cross wing on an L-shaped roof
The framing takeoff's soffit, fascia and J-channel count used to stop at the main roof; it now swaps in a cross wing's own eaves and rakes.
-
Stair stringer connection and bearing checks now have a page field
The framing takeoff page can now run the stringer connector count and bearing check without editing a plan file.
-
How much sun does a plastic bottle need to make water safer?
Solar disinfection (SODIS) in numbers: 10.8 MJ per square metre, why cloud means two days, and what the method cannot do. A new Hearth & Horizon story.
-
Running T1-11 siding horizontally on a shed: what it adds to the cut list
Horizontal T1-11 on an 8x12 shed takes the same 11 panels but adds Z-flashing and 31 blocks at the row joints: about $68 more. Primed adds $22.
-
A pressure canner's 10 lb weight means 108 °C at 3,400 m, not 115
A new Hearth & Horizon story: a sea-level canning leaflet used in a Peruvian highland parish, and the steam-table sums that show why.
-
The dormer the budget forgot
The framing takeoff's budget now prices a dormer's lumber by board foot and its roof by area, from typed prices only.
-
The dust on the beams: a short story about a leaf blower
A new Hearth & Horizon story weighs the dust in a parish hall that used to hold grain.
-
The fish goes in frozen: a short story about a parish fish fry and a turkey rule
A new Hearth & Horizon story works out why a parish's "thaw the fish first" rule is wrong for battered fillets and what a bigger fryer really changes.
-
The framing budget now prices the deck
A plan with a deck now gets a Deck section in the budget, with lumber, footing bags, screws and a typed labor rate, all tied to the deck layout.
-
The framing budget now prices stair connectors and risers
Stringer connectors, foot anchors and solid riser boards join the stair labor line in the framing budget, and a duplicate stair labor line is gone.
-
The hour bell: a short story about a clock-keeper's ears
A new Hearth & Horizon story measures a village bell chamber and finds why earplugs were the wrong first answer.
-
Why an ice-thickness formula is not enough to put a crowd on a river
Thickness = constant x sqrt(freezing degree-days) gave 43 cm; an auger gave 41 cm at the church and 9 cm at the inflow. A new Hearth & Horizon story.
-
The lion that belonged to another saint
Saint Jerome's lion is a medieval borrowing from Abbot Gerasimus. The new Little Lamps bedtime story tells it and says so.
-
How far back should a bonfire's rope go? A new Hearth & Horizon story
The Ring of Stones: a parish bonfire ring laid for 300 kg of wood meets 1,206 kg, and the distance for the same heat doubles, not quadruples.
-
Three public Holtrop-Mennen codes, two wave-term forms: which one is the paper's?
A tie-break between public implementations of the Holtrop-Mennen low-speed wave resistance term, when the original paper cannot be opened.
-
Tuning the threshold did not rescue a weak LLM coder
A negative result from the llm-coding-inference programme - tuning a small zero-shot LLM's cutoff on 2,000 labels left it too weak for a better audit design.
-
Two transcriptions of Holtrop-Mennen agreed, and both were wrong
A public implementation never used one of its own variables, and our copy of it inherited the slip. Diffing structure, not constants, found it.
-
E-invoicing pages for Uganda and Rwanda
E-invoice Preflight now covers 69 countries. Uganda's EFRIS reportedly added twelve sectors in 2026; Rwanda's EBM has a reported September 2026 order.