-
A walkout footing has to step down with the grade
The wall-framing takeoff can now step the footing under a walkout stem in equal steps and count the riser concrete.
-
Pricing the taller wall on a walkout foundation
The wall-framing takeoff now prices the taller stem wall on a walkout foundation as a wedge: concrete, forms and rebar from a typed run and extra height.
-
Wall heat loss now has fields on the framing page
The wall heat-loss sum (UA, design BTU/h, seasonal kBTU) that only the plan file could drive is now four fields on the Wall Framing Takeoff page.
-
A weather allowance field on the construction schedule page
The schedule page now takes a percent of working days lost to weather and pads only the activities marked exposed.
-
Weather in a build schedule: type the loss rate, not a forecast
The wall-framing takeoff schedule can stretch weather-exposed activities by a monthly share of lost working days that you type.
-
What 134 measured drone flights say about delivering a package by air
Measured quadcopter flights give 63 J/m in cruise, but 77% of a flight's energy is climb and hover, and one battery buys 1 to 3 km.
-
What an R-15 batt is worth once the studs are counted
Wall Framing Takeoff now computes effective wall R from the studs it placed: an R-15 batt in a 2x4 wall is about R-12; 5 R of exterior foam gives about R-18.
-
What a slipped day costs: carrying cost on the schedule page
The free construction schedule page now takes a carrying cost per working day and prices every slip and the whole job with it.
-
What a slipped inspection costs: pricing delay in the schedule
The wall-framing takeoff schedule now prices a slip: type your carrying cost per working day and see what each delay costs.
-
What the walls of a house lose in a winter, from the studs it placed
Wall Framing Takeoff turns its effective wall R plus typed window and door U-factors into a UA, a design load in BTU/h and seasonal conduction.
-
Why a cold church organ goes out of tune with itself
New story The Pitch of the Cold Church: flue pipes drop about 3 cents a degree, reeds do not, and a congregation warms the room mid-Mass.
-
Why a fast battery model scored good cells zero
A fast lithium-ion model scored good cell designs zero: a swallowed solver error and a high-rate effect in thick electrodes (modelled, no measured data).
-
Wind chill is not a temperature: a Candlemas story
A new Hearth & Horizon story: at 3 C and 32 km/h the wind chill is -2.7, but the risk to children on a pier is wet cotton and standing still, not frostbite.
-
Winder stairs: the smallest pivot that passes, now on the page
The wall-framing takeoff page now checks winder treads against the 6 in and 10 in depth rules and solves the smallest inner radius that passes.
-
Winder stairs: the walkline has to match the straight treads
The wall-framing takeoff now compares a winder's walkline depth with the straight tread and flags a difference over 3/8 in.
-
How much window flashing tape does a house take?
The wall-framing takeoff now counts sill and jamb flashing tape per opening and rounds it to whole rolls, with the arithmetic shown.
-
1,647 node processes to check some scripts
CI started node once per inline script, 1,647 times. One process does the same check in 1.8 s instead of 52 s.
-
31 tools, not 180 packages
Our npm pipeline would have published 180 CLIs. Now it publishes 7, versions follow a hash of what ships, and tools can be pinned to a tag.
-
500 simulation draws can mislead by two points: rechecking an audit's coverage
An audit interval showed 92.0% coverage in 500 draws and 94.1% in 2,000. A rerun of the same cell shows how far a small simulation can wander.
-
A 1.3-inch gap behind a shed siding joint
A fuzz-tested shed had a T1-11 panel joint between a ridge-beam post and a window king, 1.3 inches apart. The nailer is now ripped to fit.
-
A background job needs a last line
Review and process runs kept waiting on promptctl measure because it printed no end marker; it now ends with DONE, as main_health does.
-
A barn roof on a 10x10 shed: 19% more room for the same money
A gambrel roof, framed as gusseted trusses and checked as three-hinged frames, encloses 900 cu ft on a 10x10 for $3,228; a 6/12 gable, 756 for $3,216.
-
Can a simulator shorten a robot-safety certificate? Only with a big enough pool of runs
A twin-assisted interval beat real-only betting on 20 of 21 pendulum pairs with 20,000 twin runs, 7 to 8 with 4,000, and none with 500.
-
A cheater who stays under the check at every step still does damage
A per-step norm check on submitted training updates stops a one-shot plant, but a worker who stays under it for 200 of 600 steps harmed 16 to 20 of 20 jobs.
-
Clinched, unless a tie-break says otherwise
The play-off race now flags a team that is in a place in every outcome except a points tie at the cut that it loses on goal difference.
-
A cycle test that steps cannot fool: Fisher's g on changepoint residuals
After the fitted steps are removed, a periodogram peak test finds the sunspot cycle (p 2e-6) and false-alarms on 1 to 3% of series with real steps and no cycle.
-
A five-person daycare week: allowing a split shift covers 6 more slots for $307
A worked childcare week: 23 of 30 adult-shifts covered for $1,888, then 29 once same-day split shifts are allowed, for $2,195.
-
A deck over 30 inches needs a guard, and the takeoff now counts it
The free deck takeoff now lays out a guard on decks over 30 inches: posts, balusters under the 4 inch gap and rails in the lumber order.
-
The deck takeoff now lays out the railing on the page
A 16 x 12 ft deck 48 in off the ground gets a guard: posts, balusters under a 4 in gap and rails. It was CLI only; now it is two dropdowns.
-
A drift warning that also fires on real steps: testing it on a staircase
The changepoint detector warns many steps may be slow drift. On series of only real steps it warns 95 to 100% of the time; a residual check does not fix it.
-
A first visit to the shed designer, on a laptop and a phone
A first visitor's path through the shed designer on a laptop and a phone, from gallery to HOA packet to print, and the eight confusions we fixed.
-
A lean-to shed, framed and priced: $173 under the default gable
The shed designer now frames a single-slope lean-to. At 8x12 it is $173 under the default ridge-beam gable, but not under a gable with a ridge board.
-
A metre of snow is not a load: depth times density, and the slope you can't see
A new Hearth & Horizon story turns on one sum: snow depth times density, checked on both slopes of a church roof.
-
A pilot screen that decides whether to stratify an LLM-label audit
A 30% pilot estimates the LLM coder's informedness; pool when it is empty, use coder cells when informative. Tested on GoEmotions and NaijaSenti.
-
A four-stylist salon week leaves three chairs empty, and the schedule says which
A worked salon week: 13 of 16 chair-shifts covered for $1,466, and the three open ones point to a Saturday hiring decision.
-
A saltbox roof, framed and checked: the look costs about $27 to $82
The shed designer now frames a saltbox: off-centre ridge, two pitches, unequal wall loads. At 8x12 it costs $27 to $82 more than a matching gable.
-
A second pass at the shed designer's price gaps
Rechecking 11 open Lowe's price gaps and 17 shed kit prices from search copies: what filled, what conflicted, and what still needs a person with a browser.
-
A shed floor framed like a house floor: what 24-inch joists save
Shed floor joists at 16 inches run at 15% of capacity. Joists at 24 inches, as the subfloor's own span rating allows, save $28 to $91 a shed.
-
A shed is not a house: framing the windows to the load
Every window got kings, jacks and a 2x6 header, house-style. Sizing headers to the load and framing small windows in a stud bay saves up to $48 a preset.
-
A shed designer link that shows the shed
Why a shared link to the shed designer previewed as a text card, the three small things in the way, and the 53 KB picture that replaces it.
-
A shed on blocks needs anchors: the arithmetic
An 8x12 shed weighs about 1,800 lb without its shingles. Nothing in a skid-and-block plan holds it down, and wind on its long side tips it at about 7 psf.
-
What an HOA wants to see before you build a shed, from your own design
The shed designer now prints an HOA packet: four coloured, dimensioned elevations, the finishes and colours, a 3D view and the site plan.
-
A shed site plan an HOA can read: which way it faces, north, and the easement
The shed designer's site plan can now turn the shed, point north and draw an easement, and the HOA packet shows the corner with the door.
-
A shed with no floor: what leaving out the floor really saves
Leaving the floor out of an 8x12 shed drops $235 of floor framing but adds $244 of gravel. Real numbers, the checks and the catches.
-
A sloped rafter needs a sloped hanger, and it adds $67 to a shed
The shed designer priced a face-mount hanger for each ridge-beam rafter. Simpson rates those to 1/4:12, so the list now names a sloped hanger.
-
A stair stringer calculator that checks the board left under the notch
Equal risers, the shorter first cut, stringer length and the stairwell opening from a total rise, with a warning when the notch leaves under 3-1/2 in.
-
One plural tag turned main red, and the check that caught it
A post tagged 'decks' beside four tagged 'deck' failed the front-matter check on main; the fix was one character, the lesson is about where the check runs.
-
A toy civilization that never cycles: the null result in our structural-demographic model
We built a minimal Turchin-style model of peasants, elites and a state. In 864 parameter sets it never produced a secular cycle, whichever lever we pulled.
-
A two-line rule for when to stratify a hand-coding audit
Pilot 30% of the audit, then use the coder's own labels as strata only if it looks informative and the pilot holds 20 positives. The rule is now library code.
-
A way up to the barn loft: a ladder, and a hatch where IRC R807.1 asks for one
The shed designer's barn loft had a floor but no way up. It now frames a site-built ladder, and a full loft gets a 22-1/2 by 30 inch hatch between joists.