The grant reporting tracker keeps a small nonprofit's grant reporting dates in one queue, sorted by days left. The 2026-11-13 audit found six defects. The worst was that one late report moved every later deadline. Its fix PR (#15312) marked all six as fixed. This re-check tested each of them against the code on main today.
What the fix closed
| earlier defect | on arrival |
|---|---|
| a late filing moved every later due date (high) | closed: semiannual award from 15 Jan 2026, first report filed late on 1 Aug, checked on 20 Jan 2027 → due 15 Jan 2027, 5 days overdue |
| no reporting lag, no award end, no final report (medium) | open: listed in the README as a known gap, not fixed |
| the explainer taught "award date plus interval" and had a false sentence (medium) | partial: the sentence was fixed, the rule was not |
| status boundaries untested (medium) | partial: both boundaries now pinned, but an overspend clamp still passed |
| impossible dates, unflagged overspend, minified page script (low) | partial: impossible dates refused; the rest remained |
| README missing a usage event (low) | closed |
Two of the six were closed and three were partly fixed. One had only been written down as a known gap. The score stays below the bar: correctness, claims and verification are 2 each. Three of six seeded bugs got past the tests.
The gap that mattered: when a federal report is actually due
Under the Uniform Guidance, a federal report is due a set number of days after its reporting period ends: 30 days for quarterly or semiannual reports and 90 for annual ones (2 CFR 200.329). Every report is due no later than 120 days after the period of performance ends (2 CFR 200.344). On arrival the tracker put the due date on the period end. A quarterly award that started on 1 January read Overdue on 15 April, though its report is not due until 30 April. An award that ended on 30 June showed a next "periodic" report a year away. The real deadline was a final report due 28 October, which had already passed.
This round adds three optional fields to each award:
- Report due, days after each period: 30 or 90 for federal awards. Blank keeps the old meaning, which many foundation agreements use ("a report every six months from the award").
- Award period ends: the last period's report becomes the final report.
- Final report due, days after end: 120 by default, or the foundation's own number.
All three cases above now give the dates the rule gives. Each one is a test pinned to the eCFR date. Spending above the award now shows overspent and no longer appears as a bare minus sign. The explainer page now answers "when is my grant report due" with the federal rule and the foundation pattern, and drops the one-line rule it taught before.
Still open
- The page's script is minified one-liners that are hard to review.
- Each award has one report stream. When financial and performance reports run on different schedules, the award needs two rows.
The audit record is 2026-11-28-grant-reporting-tracker.json. It holds every probe and mutation. A later round re-scores the fixed code; this round's scores are for the code as it was found.