How much rooftop PV can the IEEE 13-node feeder take before voltage binds, and which cheap measure adds the most?
research/infra-hosting
Stochastic PV hosting capacity of the IEEE 13-node feeder in OpenDSS on 300 random placements: median 1,015 kW at midday minimum load, voltage binds first in 75% of placements; a 2 V lower regulator set-point adds +310 kW, while inverter fixed power factor and volt-var add about nothing once the regulators respond (modelled, not a measured feeder).
What it found
OpenDSS on the IEEE 13-node test feeder (3,466 kW peak): total PV is ramped from zero over 300 random placements (1–8 customer nodes, seed 1) until the first service voltage above 1.05 pu, line above its ampacity or transformer above its kVA rating, with every measure scored on the same placements. At 30 % of peak load the median placement takes 1,015 kW (10th–90th percentile 510–1,893) and voltage binds first in 224 of 300. Lowering the regulator set-point by 2 V adds the most (+310 kW median, better on 74 % of placements, worse on 10 %, at 0.007 pu less margin at peak). A fixed power factor of 0.95 changes the median by −60 kW and the IEEE 1547-2018 Category B volt-var curve by 0, because the regulators’ line-drop compensation holds the voltage up; with taps frozen they add +110 and +60 kW, and with line-drop compensation off +50 and +10. Midday EV charging adds +10 kW because the load lands on the same 500 kVA transformer. The unmodified feeder reproduces the published IEEE voltages to 0.003 pu. Limits: one small feeder, snapshots not a day, conductor ampacities and the 1547 curve points recalled and not verified, EV load a rounded estimate, utility regulator settings not known.
A figure from its own output
Paper, code and results
More in Energy supply and dense energy storage
- Does regulator set-point still beat inverter volt-var for PV hosting on the IEEE 34- and 123-node feeders?PV hosting capacity of the IEEE 34- and 123-node feeders in OpenDSS (200 random placements): on the 123-node feeder a 2 V lower regulator set-point adds +790 kW to a 1,160 kW median (every placement better), inverter volt-var +100 kW and fixed power factor +180 kW; the published 34-node case has no headroom at all because its source is set to 1.05 pu (modelled, not measured feeders); over a one-minute day the set-point trades overvoltage for undervoltage while inverter reactive power cuts tap operations about 30 %.
- How much does model-predictive heating and cooling save over a thermostat on a time-of-use tariff, when the model and forecast are wrong?Does MPC beat a thermostat for a heat pump on a time-of-use tariff? On real TMY3 weather with a deliberately wrong model and yesterday's weather as the forecast it pays 10.7% less in Greensboro (4.1% in cold Sand Point), saves more with more thermal mass (6.5% to 25%), and loses the gain at an 8 K forecast error; the envelope is from published values, not a fit to measured data.
- Does a DC screen find the N-1 outages an AC power flow flags?DC against AC N-1 screening on IEEE 14-, 30-, 39-, 57- and 118-bus cases (every line and transformer outage, modelled, ratings swept): at 25 % rating headroom the DC screen misses 13 to 40 % of the outages an AC power flow calls insecure; flagging at 0.8 of rating misses none, at the cost of 102 false alarms on case118 (186 outages).
- Do nodal loss penalty factors repair the DC OPF's merit order on the IEEE 30-, 39- and 118-bus cases?Nodal loss penalty factors (AC loss sensitivities) in a DC OPF on the IEEE 30-, 39- and 118-bus cases: on the 118-bus case they recover 23 to 38 % of plain DC's excess cost at 0.6 to 1.0 of load, but the iteration does not converge at 0.8 and above and at 1.1 of load the dispatch is worse than plain DC (modelled benchmark, not a measured system).
- Which freight modes can run on batteries or hydrogen, and what does it cost in payload?Freight energy per tonne-km from first principles for truck, unit train, bulk carrier and 747 freighter, then diesel swapped for batteries or hydrogen at the same gross mass and range: at 250 Wh/kg a truck keeps 79% of its payload, a train 93%, a ship 55% and the freighter cannot fly the route; 90% needs ~510, 180, 990 and 5,600 Wh/kg (most inputs assumed and swept).
- How much of a pump-scheduling saving survives when one hot day sets the month's demand charge?Net3 pump schedules billed on PG&E B-19 over a month of varying days: with every day the same the best schedule saves 56 to 67 %, but the lowest feasible peak jumps from 63 kW to the 310 kW booster at only 1.5 % more demand, and one day at +20 % cuts the saving to 44 % (summer) and 19 % (winter, spring) (simulated; one network, list prices).
All 39 Energy supply and dense energy storage projects →
Other research topics
Proper scoring & elicitation28Effort & peer prediction9Verification games & slashing19Detection & tolerances14Markets as routers13Prediction-market design9Paying contributors8Decentralised training systems23Digital twins & sim-to-real164LLM chip design loops40Robot manufacturing loops53Ambient AI assistant46Self-replicating manufacturing34Simulation-first design64Engineered clothing45Task-specific AI accelerators40Algorithmic chip-design loops42Open-source purpose-built robots44The software-engineering loop43Adversarial human imitation41Open-source residential construction41Autonomous multi-angle capture34Sensing, imaging and 3D31Energy supply and dense energy storage39Robot societies among people31Agentic co-design of low-cost robots27Laundry-hanging robots25Machine learning on qualitative data23Robots on the building site27Civilizations & group psychology1History & human sciences1
Produced with AI assistance (Claude). Results are from the code in this repository and are simulated or stylised unless the abstract says otherwise; nothing here implies affiliation with or endorsement by any lab, researcher or company cited. MIT licensed.