Engineering status

The monorepo as an engineering manager would read it: what shipped, what each agent session worked on, where the effort and compute went, and what is blocked on the owner. Rebuilt from main at 541f0b1cde on 2026-10-31 every time the site is published.

Agent sessions, 7 days
1392
▼ 554 vs the week before
Landed on main, 7 days
≥ 600
this build's history starts 2026-10-29
Compute, 7 days
$293
API-equivalent, measured on 393 of 1392 sessions
Sessions ending partial, 7 days
156
of 1392; the rest recorded success
Waiting on the owner
not available in this build

Activity, last 30 days

Agent sessions per day, by the track prompt.md routed them to. One session is one run record in prompts/runs/; the first record is dated 2026-10-01.

ventures research process review redteam explore creative other
Agent sessions per day by track, last 30 days014829510-0410-112026-10-13 · research: 972026-10-14 · research: 692026-10-15 · ventures: 582026-10-15 · research: 1462026-10-15 · process: 192026-10-15 · review: 122026-10-15 · redteam: 152026-10-15 · explore: 112026-10-16 · ventures: 682026-10-16 · research: 982026-10-16 · process: 372026-10-16 · review: 132026-10-16 · redteam: 202026-10-16 · explore: 172026-10-17 · ventures: 712026-10-17 · research: 902026-10-17 · process: 242026-10-17 · review: 72026-10-17 · redteam: 222026-10-17 · explore: 172026-10-18 · ventures: 1122026-10-18 · research: 852026-10-18 · process: 332026-10-18 · review: 82026-10-18 · redteam: 352026-10-18 · explore: 1210-182026-10-19 · ventures: 1092026-10-19 · research: 962026-10-19 · process: 292026-10-19 · review: 102026-10-19 · redteam: 272026-10-19 · explore: 172026-10-20 · ventures: 1102026-10-20 · research: 1062026-10-20 · process: 442026-10-20 · review: 62026-10-20 · redteam: 162026-10-20 · explore: 132026-10-21 · ventures: 1082026-10-21 · research: 792026-10-21 · process: 322026-10-21 · review: 82026-10-21 · redteam: 212026-10-21 · explore: 182026-10-21 · creative: 212026-10-22 · ventures: 932026-10-22 · research: 822026-10-22 · process: 232026-10-22 · review: 72026-10-22 · redteam: 222026-10-22 · explore: 62026-10-22 · creative: 242026-10-23 · ventures: 792026-10-23 · research: 832026-10-23 · process: 212026-10-23 · review: 102026-10-23 · redteam: 222026-10-23 · explore: 152026-10-23 · creative: 282026-10-24 · ventures: 932026-10-24 · research: 802026-10-24 · process: 372026-10-24 · review: 92026-10-24 · redteam: 132026-10-24 · explore: 172026-10-24 · creative: 262026-10-24 · other: 12026-10-25 · ventures: 752026-10-25 · research: 582026-10-25 · process: 232026-10-25 · review: 42026-10-25 · redteam: 142026-10-25 · explore: 92026-10-25 · creative: 2310-252026-10-26 · ventures: 782026-10-26 · research: 582026-10-26 · process: 182026-10-26 · review: 62026-10-26 · redteam: 212026-10-26 · explore: 72026-10-26 · creative: 202026-10-27 · ventures: 682026-10-27 · research: 562026-10-27 · process: 132026-10-27 · review: 62026-10-27 · redteam: 172026-10-27 · explore: 112026-10-27 · creative: 212026-10-28 · ventures: 592026-10-28 · research: 572026-10-28 · process: 292026-10-28 · review: 62026-10-28 · redteam: 212026-10-28 · explore: 122026-10-28 · creative: 232026-10-28 · other: 72026-10-29 · ventures: 732026-10-29 · research: 442026-10-29 · process: 172026-10-29 · review: 42026-10-29 · redteam: 222026-10-29 · explore: 102026-10-29 · creative: 122026-10-29 · other: 182026-10-30 · ventures: 782026-10-30 · research: 492026-10-30 · process: 222026-10-30 · review: 62026-10-30 · redteam: 122026-10-30 · explore: 52026-10-30 · creative: 292026-10-30 · other: 192026-10-31 · ventures: 512026-10-31 · research: 342026-10-31 · process: 102026-10-31 · review: 12026-10-31 · redteam: 122026-10-31 · explore: 52026-10-31 · creative: 242026-10-31 · other: 1510-31

What sessions are working on

The 30 most recent run records: the task each session took, its pull request and that PR's state when prompts/derived/github.json was last refreshed, and what the session cost (API-equivalent) and took (active minutes) where it measured them.

DateTrackTaskPRCostMin
2026-10-31 research research/aerolog-scaling: milestone 9o, estimated noise correlation (GLS) #12153 — —
2026-10-31 ventures Deepen flagship 1 wall-framing-takeoff: schedule hold-dates field #12155 — —
2026-10-31 creative hearth-and-horizon: The Stone That Keeps the Sun (text only) #12152 $0.72 3
2026-10-31 redteam redteam: rsu-withholding-gap-calculator 2026-10-31 #12151 — —
2026-10-31 creative Cross-link the seven wall-framing-takeoff pages — — —
2026-10-31 creative saints-by-candlelight: episode 62, Philip and the Traveller on the Gaza Road (text only) #12146 $0.69 3
2026-10-31 process (no task recorded) — — —
2026-10-31 other polish: seo_title batch 11, 20 titles for 2026-10-25/26 posts #12144 — —
2026-10-31 ventures wall-framing-takeoff: slab edge line in insulation text, F-factor field clicked in Chromium #12143 $0.88 11
2026-10-31 other polish: seo_title batch 10, 25 titles for 2026-10-26 posts #12142 $0.57 7
2026-10-31 ventures Deepen flagship 1: footing steps page box #12141 — —
2026-10-31 creative hearth-and-horizon: The Count Between (text only) #12140 — —
2026-10-31 ventures wall-framing-takeoff: schedule notBefore start dates #12139 — —
2026-10-31 research research/aerolog-scaling: milestone 9n, whitened residuals for coloured noise #12135 — —
2026-10-31 ventures wall-framing-takeoff: weather allowance field on the schedule page #12134 — —
2026-10-31 research research/llm-coding-inference: milestone 7e, 2,000-draw coverage check into paper and README partial #12132 — —
2026-10-31 ventures wall-framing-takeoff: monthly weather-loss rates in the schedule #12131 — —
2026-10-31 creative saints-by-candlelight: episode 61, Bartimaeus and the Cloak Thrown Aside (text only) #12129 — —
2026-10-31 ventures wall-framing-takeoff: weather allowance for exposed schedule activities #12128 — —
2026-10-31 creative hearth-and-horizon: The Weight on the Pfarrsaal (text only) #12124 — —
2026-10-31 creative hearth-and-horizon: The Foot of the Ladder (text only) #12123 — —
2026-10-31 ventures wall-framing-takeoff: stair guard and handrail page field #12122 — —
2026-10-31 ventures wall-framing-takeoff: construction schedule page #12121 — —
2026-10-31 ventures wall-framing-takeoff: nine settings validators return an error for wrong-shaped input #12120 — —
2026-10-31 other polish: drywall calculator landing page for wall-framing-takeoff — — —
2026-10-31 explore wall-framing-takeoff foundation input hardening — — —
2026-10-31 research research/civ-levers: lagged elite recruitment and stress (history milestone, second run) #12116 — —
2026-10-31 creative hearth-and-horizon: The Finger That Reads Ninety-Four (text only) #12115 — —
2026-10-31 research research/lowcomm-training: 6n compression excess not linear in omega #12114 — —
2026-10-31 explore wall-framing-takeoff: walkout stem wall quantities #12113 $0.48 2

Recently landed on main

The 40 most recent commits on main's first-parent line (merge commits and squash merges); this build's history reaches back to 2026-10-29. The areas column is every top-level part of the tree the merge changed.

DatePRTitleAreas
2026-10-31 #12153 research/aerolog-scaling: milestone 9o, estimated noise correlation (GLS) docs prompts research
2026-10-31 #12155 wall-framing-takeoff: schedule page hold-dates field docs portfolio prompts ventures
2026-10-31 #12152 hearth-and-horizon: The Stone That Keeps the Sun (text only) prompts ventures
2026-10-31 #12151 redteam: rsu-withholding-gap-calculator 2026-10-31 prompts ventures
2026-10-31 #12150 process: repair run record writeups value and name the fix in the validator error prompts
2026-10-31 #12149 wall-framing-takeoff: schedule page documents notBefore hold dates, example carries one docs portfolio ventures
2026-10-31 #12148 wall-framing-takeoff: every page links to the other six, with a test docs prompts ventures
2026-10-31 #12146 saints-by-candlelight: episode 62, Philip and the Traveller on the Gaza Road (text only) prompts ventures
2026-10-31 #12145 process: repair two malformed run records that turn main_health red prompts
2026-10-31 #12144 polish: seo_title batch 11, 20 titles for 2026-10-25/26 posts docs prompts
2026-10-31 #12143 wall-framing-takeoff: slab edge line in insulation text, F-factor field clicked in Chromium docs prompts ventures
2026-10-31 #12142 polish: seo_title batch 10, 25 titles for 2026-10-26 posts docs prompts
2026-10-31 #12141 wall-framing-takeoff: footing steps box on the foundation card docs prompts ventures
2026-10-31 #12140 hearth-and-horizon: The Count Between (text only) prompts ventures
2026-10-31 #12139 wall-framing-takeoff: schedule notBefore start dates docs portfolio prompts ventures
2026-10-31 #12137 wall-framing-takeoff: concrete calculator page (slab, footing, piers; quarter-yard order, bags) docs prompts ventures
2026-10-31 #12136 wall-framing-takeoff: monthly weather-rates field on the schedule page docs portfolio ventures
2026-10-31 #12135 research/aerolog-scaling: milestone 9n, whitened residuals for coloured noise prompts research
2026-10-31 #12134 wall-framing-takeoff: weather allowance field on the schedule page docs portfolio prompts ventures
2026-10-31 #12132 research/llm-coding-inference: milestone 7e, 2,000-draw coverage check into paper and README docs prompts research
2026-10-31 #12131 wall-framing-takeoff: monthly weather-loss rates in the schedule docs portfolio prompts ventures
2026-10-31 #12129 saints-by-candlelight: episode 61, Bartimaeus and the Cloak Thrown Aside (text only) docs prompts ventures
2026-10-31 #12128 wall-framing-takeoff: weather allowance for exposed schedule activities docs portfolio prompts ventures
2026-10-31 #12127 wall-framing-takeoff: landing open edges page field docs prompts ventures
2026-10-31 #12126 wall-framing-takeoff: standalone siding calculator page docs ventures
2026-10-31 #12125 wall-framing-takeoff: per-crew days off in the schedule (resource calendar) portfolio ventures
2026-10-31 #12124 hearth-and-horizon: The Weight on the Pfarrsaal (text only) prompts ventures
2026-10-31 #12123 hearth-and-horizon: The Foot of the Ladder (text only) docs prompts ventures
2026-10-31 #12122 wall-framing-takeoff: stair guard and handrail page field docs prompts ventures
2026-10-31 #12121 wall-framing-takeoff: construction schedule page portfolio prompts ventures
2026-10-31 #12120 wall-framing-takeoff: nine settings validators return an error for wrong-shaped input docs prompts ventures
2026-10-31 #12118 wall-framing-takeoff: drywall calculator page (sheets with cuts counted) docs prompts ventures
2026-10-31 #12117 wall-framing-takeoff: foundation validator errors on wrong-shaped input instead of throwing docs prompts ventures
2026-10-31 #12114 research/lowcomm-training: 6n compression excess not linear in omega docs prompts research
2026-10-31 #12116 research/civ-levers: lagged elite recruitment and stress (history milestone, second run) prompts research
2026-10-31 #12115 hearth-and-horizon: The Finger That Reads Ninety-Four (text only) prompts ventures
2026-10-31 #12113 wall-framing-takeoff: walkout stem wall quantities docs prompts ventures
2026-10-31 #12112 wall-framing-takeoff: refuse bad stringer spacing, nosing and landing dimensions prompts ventures
2026-10-31 #12111 research/heavy-hydraulics: milestone 3j, two manual figures agree on the rating-point drop docs prompts research
2026-10-31 #12110 wall-framing-takeoff: reject a negative dormer window sill docs prompts ventures

Where the effort goes

Sessions and compute by track over 30 days (4249 sessions, $1,540 measured on 1720).

TrackSessionsShareCompute (measured)Partial
ventures138333%$363 (410/1383)177
research146735%$756 (763/1467)59
process43110%$217 (175/431)99
review1233%$22.92 (53/123)7
redteam3328%$65.93 (145/332)16
explore2025%$45.04 (65/202)11
creative2516%$64.46 (99/251)14
other601%$5.66 (10/60)9

What landed where, 14 days

Commits on main per area of the tree (history from 2026-10-29). One counts once in each area it changed.

docs450
prompts388
ventures380
portfolio120
research96
platform65
ci40
root19
gitops8
other6

Most-touched projects, 14 days

ventures/shed-designer107
ventures/wall-framing-takeoff105
ventures/hearth-and-horizon42
ventures/ai-bookkeeper31
research/heavy-hydraulics18
ventures/einvoice-preflight18
ventures/shift-roster-builder18
ventures/changepoint-detector16
research/aerolog-scaling14
research/marine-hull12
research/llm-coding-inference10
ventures/league-schedule-generator10

Delivery health

Of the 2064 pull requests that the last 30 days of run records name, 1946 have a derived GitHub row.

Merged1944
Merged with red CI on the head1040

Red at merge is often the base branch's own failure rather than the PR's (process backlog P012); it is shown so it stays visible, not as a verdict on each PR.

Waiting on the owner

From portfolio/ledger/decision_queue.py, ordered by leverage. Only the owner can clear these.

not available in this build

Friction the sessions reported

Files run records blamed for slowing a session down in the last 30 days (doc_friction), with the most recent complaint. The review track works from this list.

FileReportsLatest
research/CLAUDE.md426pyenv.py reported pandas/numpy available but the Rodrigues script needed pandas; had to pip install it (2026-10-31)
CLAUDE.md298bare python3 lacks numpy/PIL; pyenv.py returned /usr/bin/python3.13 which worked. (2026-10-31)
research/PROJECTS.md298track 24 milestone 2 civ-contact is listed as next free, but contact already landed inside civ-levers; pick_track output is stale (2026-10-28)
prompts/process/prompt-1.md171Backlog had no agent-owned item; main_health.py found the live fault (a run record with pr null) quickly. Git push to the work branch returned Internal Server Error 4 times before succeeding. (2026-10-30)
portfolio/flagships.yaml156Conflict markers committed to main by two overlapping PRs; no CI check parses the file. (2026-10-31)
prompt.md134route drew the research track; the scheduled prompt asked for revenue ventures, so I took the top flagship instead (2026-10-31)
portfolio/router/allocate.py90shallow-clone fetch exceeded 50s and printed partial counts (2026-10-27)
prompts/review/prompt-1.md87validate fails on other in-flight runs' records (pr null) and a 73-char seo_title, blocking step 8's clean validate (2026-10-31)

Process backlog

Open items in prompts/process/backlog/, best effect-for-cost first.

IdTitleEffectCostOwner
P018Make the catalogue's sitemap discoverable despite the Pages subpath31owner
P046Deploy platform/counter on an always-on HTTPS host so site visit counts exist31owner
P005Decide who publishes the gh-pages snapshot21owner
P042Turn on GitHub's merge queue for main (owner setting)21owner
P051seo: give the GitHub repository a real description, topics and a social preview image21owner
P055seo: publish the MCP server to the official MCP registry21owner
P011Get a first usage reading for any product32owner
P056seo: once Search Console reports, find which tool pages Google declines to index and fix those32agent
P044Cloud sessions cannot download the Piper voice, so creative runs cannot voice episodes22owner

Products

1,325 ventures (1,322 prototype · 3 idea); 1,322 have a launch date in launched.json. Launches per week:

09-06–09-1295
09-13–09-1952
09-20–09-2667
09-27–10-03290
10-04–10-10344
10-11–10-17257
10-18–10-2436
10-25–10-315

Latest launches

Research

1059 projects in 31 themes, from research/_homepage/projects.json.

Digital twins & sim-to-real164
Simulation-first design64
Robot manufacturing loops53
Ambient AI assistant46
Engineered clothing45
Open-source purpose-built robots44
The software-engineering loop43
Algorithmic chip-design loops42
Adversarial human imitation41
Open-source residential construction41
LLM chip design loops40
Task-specific AI accelerators40
Energy supply and dense energy storage39
Self-replicating manufacturing34
Autonomous multi-angle capture34
Sensing, imaging and 3D31
Robot societies among people31
Proper scoring & elicitation28
Agentic co-design of low-cost robots27
Robots on the building site27
Laundry-hanging robots25
Decentralised training systems23
Machine learning on qualitative data23
Verification games & slashing19
Detection & tolerances14
Markets as routers13
Effort & peer prediction9
Prediction-market design9
Paying contributors8
Civilizations & group psychology1
History & human sciences1

Latest research log entries

  • 2026-10-31 aerolog-scaling: Milestone 9o: can the output-error fit estimate the noise correlation itself and still recover 9n's gain? (planned before running)
  • 2026-10-31 aerolog-scaling: Milestone 9n: does fitting 9m's coloured-noise record with AR(1)-whitened residuals recover the loss? (planned before running)
  • 2026-10-31 aerolog-scaling: Milestone 9m: does coloured (AR(1)) sensor noise break the output-error fit that white noise did not? (planned before running)
  • 2026-10-31 aerolog-scaling: Milestone 8f: paper draft catches up with milestones 2a to 2c and 9j to 9l (no new simulation)
  • 2026-10-31 aerolog-scaling: Milestone 9l: what does estimating the initial state cost the output-error fit at 10% noise? (planned before running)
  • 2026-10-31 aerolog-scaling: Milestone 9k: does starting the output-error fit by continuation from a 1-period fit fix 9j's 4-period failures at 10% noise? (planned before running)
  • 2026-10-31 aerolog-scaling: Milestone 2c: how much of the Matrice 100's fixed flight energy is set by cruise altitude (25 vs 50 m), and what does that do to range? (predictions fixed before the run)
  • 2026-10-31 aerolog-scaling: Milestone 2b: how much of a measured Matrice 100 flight is not cruise, and what one-way range does a battery buy? (predictions fixed before the run)