Does a DC screen find the N-1 outages an AC power flow flags?
research/infra-n1screen
DC against AC N-1 screening on IEEE 14-, 30-, 39-, 57- and 118-bus cases (every line and transformer outage, modelled, ratings swept): at 25 % rating headroom the DC screen misses 13 to 40 % of the outages an AC power flow calls insecure; flagging at 0.8 of rating misses none, at the cost of 102 false alarms on case118 (186 outages).
What it found
Operators screen N-1 security with a linear DC power flow. On pandapower's MATPOWER cases 14, 30, 39, 57 and 118, every line and transformer outage is solved as an AC power flow (truth: any other branch over its rating, a bus newly out of the 0.94–1.06 band, or non-convergence) and as a DC flow (screen). Ratings are a swept headroom over base-case flow, not taken from the cases. At 25 % headroom the DC screen misses 25, 17, 13, 40 and 14 % of insecure outages with almost no false alarms; flagging at 0.8 of rating misses none on any case but flags all 186 outages on case118 (84 truly insecure). Judging AC on MW alone cuts the miss rate (e.g. 14 to 12 % on case118, 40 to 20 % on case57), so reactive flow and voltage explain part. Checks: a closed-form 3-bus LODF case. Limits: base dispatch only (no redispatch), single outages, swept ratings (assumed), non-converged AC solves count as insecure, 20–186 outages per case. Modelled benchmark cases, not measured systems.
Paper, code and results
More in Energy supply and dense energy storage
- Do nodal loss penalty factors repair the DC OPF's merit order on the IEEE 30-, 39- and 118-bus cases?Nodal loss penalty factors (AC loss sensitivities) in a DC OPF on the IEEE 30-, 39- and 118-bus cases: on the 118-bus case they recover 23 to 38 % of plain DC's excess cost at 0.6 to 1.0 of load, but the iteration does not converge at 0.8 and above and at 1.1 of load the dispatch is worse than plain DC (modelled benchmark, not a measured system).
- Which freight modes can run on batteries or hydrogen, and what does it cost in payload?Freight energy per tonne-km from first principles for truck, unit train, bulk carrier and 747 freighter, then diesel swapped for batteries or hydrogen at the same gross mass and range: at 250 Wh/kg a truck keeps 79% of its payload, a train 93%, a ship 55% and the freighter cannot fly the route; 90% needs ~510, 180, 990 and 5,600 Wh/kg (most inputs assumed and swept).
- How much of a pump-scheduling saving survives when one hot day sets the month's demand charge?Net3 pump schedules billed on PG&E B-19 over a month of varying days: with every day the same the best schedule saves 56 to 67 %, but the lowest feasible peak jumps from 63 kW to the 310 kW booster at only 1.5 % more demand, and one day at +20 % cuts the saving to 44 % (summer) and 19 % (winter, spring) (simulated; one network, list prices).
- Does a real demand charge change when a water utility should run its pumps?Net3 pump scheduling billed on PG&E's published B-19 tariff with demand charges at a 15-minute step: the lake-pump schedules that idle the 310 kW booster cut the monthly bill 56 to 67 % (peak 373 to 63 kW), and the demand charge, 60 to 64 % of the shipped bill, does not move the optimal schedule at any size from 0 to 20 times (simulated; one network, list prices).
- When should a water utility run its lake pump, and how much of the saving is the tariff?Pump scheduling on EPANET's Net3 (WNTR): running the lake pump 21 h from 01:00 cuts pumping energy 52 % at a flat tariff because it idles the booster pump; the time-of-use tariff adds 3 to 16 % of cost at a ratio of 3 or less, and hourly on/off schedules (21,806 simulated, plus a GA) add almost nothing beyond one window once tank drawdown is priced (simulated, assumed tariff shapes).
- How much heat-pump and EV load growth wears out a distribution transformer, and how much does smart charging buy back?Distribution transformer ageing under heat-pump and EV growth: an IEEE C57.91-form thermal model on TMY weather and a standard load profile; loss of life stays under 0.01%/yr until ~50% of homes electrify, then 5.6%/yr at 100% with uncoordinated charging against 1.07%/yr with valley-filled charging (constants swept, not verified).
All 39 Energy supply and dense energy storage projects →
Other research topics
Proper scoring & elicitation28Effort & peer prediction9Verification games & slashing19Detection & tolerances14Markets as routers13Prediction-market design9Paying contributors8Decentralised training systems23Digital twins & sim-to-real164LLM chip design loops40Robot manufacturing loops53Ambient AI assistant46Self-replicating manufacturing34Simulation-first design64Engineered clothing45Task-specific AI accelerators40Algorithmic chip-design loops42Open-source purpose-built robots44The software-engineering loop43Adversarial human imitation41Open-source residential construction41Autonomous multi-angle capture34Sensing, imaging and 3D31Energy supply and dense energy storage39Robot societies among people31Agentic co-design of low-cost robots27Laundry-hanging robots25Machine learning on qualitative data23Robots on the building site27Civilizations & group psychology1History & human sciences1