Does a factory-built shell pay once the interest on the days it saves is counted?
research/house-shellvalue
Does a factory-built shell pay once the interest on the days it saves is counted? Alone it saves 15.5 working days (0.22% of price) and breaks even near a $629,000 house at an assumed $1,500 crane day.
What it found
Joins house-offsite's extra cost of panelising the walls ($1,373 at assumed rates) to house-schedule's interest on working days saved, comparing a factory shell with a site-built house ordered on the same day. The shell alone saves 15.5 days (0.22% of price at 8%) when ordered at day 0 and only 6.4 days when ordered at the foundation start with a 25-day lead; it breaks even at a house price of about $629,000 at a $1,500 crane day and pays throughout at $750. Most of house-schedule's 78-day saving is the ordering date, not the shell. Stylised: house prices are parameters and every rate is assumed.
A figure from its own output
Paper, code and results
More in Open-source residential construction
- How much do fewer handoffs, parallel trades, early ordering and a factory shell cut the time to build a house?How much do fewer handoffs, parallel trades, early ordering and a factory shell cut a house's build time? Discrete-event Monte Carlo: critical path 100 working days, baseline 214; early ordering -63 d, fewer handoffs -21, a factory shell only -6 unless ordered at day 0 (-78). Stylised, uncalibrated.
- Does an independent second schedule model agree with house-schedule on what shortens a house build?Does an independent second schedule model agree with
house-schedule? Same ranking (early ordering of long-lead items first, prefab only with it, handoff gap matters), different magnitudes (-11% against -29%): sizes are set by assumptions. Crew-merging does nothing. Every input assumed. - Does the month a house build starts change how long it takes and the interest paid?Does the month a house build starts change how long it takes? Same Monte Carlo as
house-schedulewith a monthly weather calendar: in an assumed cold climate a December start takes 231 working days against 211 for July (~20 d); in a mild one, 4 d. Early ordering saves ~63 d in every month. Weather numbers assumed. - Does solar gain through windows change which envelope is cheapest over 30 years, and is the direction the windows face worth money?Does solar gain through windows change the cheapest envelope, and is window orientation worth money? Adds first-principles solar geometry to
house-energy: U 0.50 stays optimal in 15 of 16 cases, and orientation is worth $420–$1,740 of 30-year cost. Stylised: degree-day model, assumed prices and clearness, not EnergyPlus. - When should a builder order long-lead materials once holding them costs money?When should a builder order long-lead materials once holding them costs money? Extends
house-schedule: ordering ~2 lead times ahead of plan cuts the build from 214 to 182 working days and total cost from 3.34% to 2.91% of price; ordering everything on day 0 saves more days but costs more (4.00%). - Does a roof overhang over south windows pay for itself, and in which climates does it cost energy instead of saving it?Does a roof overhang over south windows pay for itself, and where does it cost energy instead? Adds profile-angle shading of south beam radiation to
house-solar; at an assumed $12 per ft of width per ft of projection no overhang is optimal in 8 climates (gross value at most $280 of 30-year NPC, negative past 1 ft in cold climates). Stylised degree-day model.
All 41 Open-source residential construction projects →
Other research topics
Proper scoring & elicitation28Effort & peer prediction9Verification games & slashing19Detection & tolerances14Markets as routers13Prediction-market design9Paying contributors8Decentralised training systems23Digital twins & sim-to-real164LLM chip design loops40Robot manufacturing loops53Ambient AI assistant46Self-replicating manufacturing34Simulation-first design64Engineered clothing45Task-specific AI accelerators40Algorithmic chip-design loops42Open-source purpose-built robots44The software-engineering loop43Adversarial human imitation41Open-source residential construction41Autonomous multi-angle capture34Sensing, imaging and 3D31Energy supply and dense energy storage39Robot societies among people31Agentic co-design of low-cost robots27Laundry-hanging robots25Machine learning on qualitative data23Robots on the building site27Civilizations & group psychology1History & human sciences1
Produced with AI assistance (Claude). Results are from the code in this repository and are simulated or stylised unless the abstract says otherwise; nothing here implies affiliation with or endorsement by any lab, researcher or company cited. MIT licensed.