Keep this bid so it is still here when the customer calls back. Every number on this form is saved together, under a name you choose, along with the figure it gave you, and restoring one puts the whole job back exactly as you priced it. Mark each one won or lost when you hear — the ones you have not heard back on stay listed as waiting, with how long they have been out. Once a few have come back, this panel says how long yours actually take, and how many are still out past that. Once enough of them have been decided, it also says whether the bids you save here have been landing differently lately than they used to.
Kept in this browser only, on this site’s own storage. Nothing is uploaded, and clearing your browser data clears it — download a backup to keep a copy or open your bids on another device. Bids are kept per tool, so these are the ones you saved here.
Type the house and the overhangs. The framing engine lays out the roof, finds the eave and rake runs under the overhangs, packs soffit panels, fascia boards and J-channel into stock lengths and adds your waste. Nothing leaves your browser.
Add soffit and fascia to a whole-house framing takeoff
For a 24 ft wide, 40 ft long house with 12 in overhangs and the rakes left open, a gable roof has two eave runs of 42 ft (40 ft plus the 12 in rake overhang at each end). That is 84 ft of eave, so 84 sq ft of soffit in one course of 12 in panels, which is 8 panels of 12 ft once 10% waste is added. Fascia runs along the eaves and up the four rakes, 142 ft in all, which is 11 boards of 16 ft, and the J-channel where the soffit meets the wall is 8 pieces of 12 ft.
Turn on rake soffit and frieze and the same 24 x 40 ft gable roof counts soffit under the rakes as well: 142 sq ft in all, 14 panels of 12 ft, 14 pieces of J-channel and 11 frieze boards of 16 ft along the wall. Most houses leave the rake open or box it with a fascia only, so rake soffit and frieze are off until you ask for them.
A hip roof has eaves on all four sides and no rakes. A 24 x 40 ft hip roof with 18 in overhangs has 140 ft of eave, so with 12 in panels it takes 2 courses of soffit under each side, 210 sq ft, 27 panels of 12 ft, 11 fascia boards of 16 ft and 14 pieces of J-channel.
Corner mitres, drip edge (the roof calculator counts it), nails, caulk, paint, and a cross wing of a different pitch. Panel widths, stock lengths and the waste figure are yours to type; check the result against your plans and your supplier's catalogue.