Save bids, mark them won or lost.
Keep this bid so it is still here when the customer calls back. Every number on this form is saved together, under a name you choose, along with the figure it gave you, and restoring one puts the whole job back exactly as you priced it. Mark each one won or lost when you hear — the ones you have not heard back on stay listed as waiting, with how long they have been out. Once a few have come back, this panel says how long yours actually take, and how many are still out past that. Once enough of them have been decided, it also says whether the bids you save here have been landing differently lately than they used to.
Kept in this browser only, on this site’s own storage. Nothing is uploaded, and clearing your browser data clears it — download a backup to keep a copy or open your bids on another device. Bids are kept per tool, so these are the ones you saved here.
Type the house and its openings. The framing engine places every stud, king, jack, header, cripple and plate, measures the open cavity between them, and counts batt bags and the whole-wall R-value. Nothing leaves your browser.
Add insulation to a whole-house framing takeoff
For a 40 x 30 ft rectangle with 8 ft walls, one 3 ft door and two 3 x 4 ft windows framed in 2x4 at 16 in on center, the calculator finds 890 sq ft of open cavity. With 5% waste and bags that cover 88 sq ft, that is 11 bags. Change any figure to match your plan.
No. Framing conducts heat around the batt, so the whole wall is lower than the label. With the studs, plates, headers and cripples this calculator places, framing is 17.3% of the opaque wall, and the R-15 cavity gives about R-13.1 (R-16.9 through the cavity alone). A 2x6 wall with R-21 batts comes to about R-17.8 by the same method.
Counted from the members placed rather than guessed: in the 40 x 30 ft example, framing takes 16.6% of the wall panel area in 2x4 walls and 17.3% in 2x6 walls, so the open cavity is a little over 80% of the panel. The common 25% framing-factor guess is more pessimistic than a layout with 16 in spacing and one door and two windows needs.
Attic and ceiling insulation, rim joists, air sealing, windows and doors (their U-factors are yours to type), and compressed batts. Bag coverage and R-values come from your product's label, and the effective R uses typical handbook layer values you can replace. It is an estimate to check against your supplier, not an energy-code compliance check.