The cell-fidelity programme forecasts how much lithium a cell design will have lost by cycle 99 from its first ten cycles. A battery design search uses that forecast to decide which designs deserve a longer, more expensive simulation. The last run ended on a puzzle. On two PyBaMM cells, Mohtat2020 and Ecker2015, whose plating reaction the programme speeds up so that they fade like the others, tripling the speed-up from 10 to 30 more than doubled the forecast's median error (0.045 to 0.105 and 0.098 to 0.249). The obvious guess is that ten cycles is too short a look once a cell fades fast.
This run tested that guess on data already on disk: 288 designs from three earlier steps, no new simulation, with the hypotheses committed before the numbers were computed (log, milestone 7t).
The plating reaction slows itself
For each design I took the lithium plated per cycle over cycles 90 to 99 and divided it by the rate over cycles 2 to 10. Call it the throttle, T. A value of 1 means plating runs at a steady rate; below 1 means it slows down.
| cell | multiplier | median T | median drift m | median ten-cycle error |
|---|---|---|---|---|
| Mohtat2020 | 10 | 0.555 | 1.006 | 0.043 |
| Mohtat2020 | 30 | 0.297 | 0.806 | 0.105 |
| Ecker2015 | 10 | 0.510 | 0.907 | 0.087 |
| Ecker2015 | 30 | 0.239 | 0.610 | 0.243 |
The drift m measures how far the fade law's late rate departs from its ten-cycle slope (1 means the straight line holds). At the faster rate, plating late in the run is a quarter to a third of what it was early. Within each cell that drifts, designs that throttle more drift more: Spearman +0.83 to +0.88, permutation p below 0.001. The one exception is Mohtat2020 at 10, where the median m is 1.006 and there is almost no drift to explain. Across all eight cell-and-rate combinations, including four parameter sets with no tuning, the median throttle orders the median drift (ρ = −0.81, p = 0.024). Inside every combination, the forecast error tracks the drift (Spearman +0.79 to +0.99).
A longer look does not fix it
If the trouble were only a short look, extending it should bring the error back down. It does not. At multiplier 30 the median error at a 50-cycle look is still 0.061 on Mohtat2020 and 0.131 on Ecker2015. That is worse than the ten-cycle error at multiplier 10 (0.043 and 0.087). The bend runs all the way to cycle 99, so a longer straight line only chases it.
A rule that scaled the look to the share of fade already seen would go the wrong way. A cell that throttles has seen 15 to 17% of its 99-cycle loss by cycle 10, against 11 to 12% at the slower rate, so that rule would stop at about 8 cycles.
What this means for the design-search recipe
The fix for throttling cells is a curved forecast whose bend comes from an early sign of the throttle, not more cycles. An earlier step tried borrowing a curvature from other designs on LG M50 cells and it failed, because there the bend went either way by 5 to 10%. Here it is one-signed and ordered by T, which gives the curved term something to stand on. That is the next step: an early throttle observable, fitted with one design pool held out at a time.
Limits: T and the fade come from PyBaMM's plating and SEI submodels at one version, so the throttle belongs to the simulated reaction, not a measured cell. T uses cycles 90 to 99, so it explains the drift after the fact rather than forecasting it. Eight combinations is a small sample, and two of them are the same chemistry at two rates. Results: experiments/bend7t/results.txt.