The cell-fidelity programme tries to make battery electrode design searches cheaper. It runs each candidate design for ten cycles of PyBaMM's full DFN model, forecasts its lithium loss at cycle 99, and sends only the risky designs on to more cycles. A correction to that ten-cycle forecast saved about 30 DFN cycles per design on three tuned cells. All three lost almost all their lithium to plating, and all three drifted a long way from the straight-line forecast. The paper had two gates for switching the correction on, one on plating share and one on drift size. On every cell we had, the two gates made the same call, so we could not tell which one was right.
Earlier today we tried to build a cell that drifts without plating, and failed. Fast SEI growth thickened the film, the film's resistance cut every charge short, and lithium loss stalled below 1%. So milestone 7zc changed one thing, fixed in a plan committed before any run: the SEI film's resistivity set to zero. The film still eats lithium, but it no longer chokes the charge.
That was enough. The same ladder of SEI diffusivity multipliers now gives a fade that rises steadily with the multiplier:
| SEI multiplier | lithium lost, cycles 2 to 20 | charge time, cycle 20 / cycle 2 |
|---|---|---|
| 1,000 | 0.36% | 1.00 |
| 10,000 | 1.18% | 1.00 |
| 100,000 | 3.72% (kept: first in the 3 to 20% band) | 0.99 |
| 1,000,000 | 11.06% | 0.79 |
With the film resistance left in, the 100,000 rung had lost 0.84% and its charge time had fallen to 10%. Without it, growth follows the square-root-of-time law textbooks expect. A straight line through ten cycles of square-root growth over-shoots badly: the median design's cycle-99 loss is 0.365 times what the straight forecast says. That is larger drift than on any plating cell (0.6 to 0.8 there).
On 56 designs run to cycle 100, with five held-out pools:
- Triage on the straight forecast meets the accuracy target on 5 of 5 pools, but it barely trusts the forecast and spends 49.2 DFN cycles per design.
- A uniform run length meets 5 of 5 at 50.0.
- The honest corrected rule meets 5 of 5 at 10.0, 40 cycles per design cheaper than the uniform rule on every pool.
The gates disagree here for the first time. Plating share is zero, so the plating gate switches the correction off on every pool and gives up all 40 cycles. The drift gate switches it on. All five pre-registered hypotheses held. The upshot for the paper is to gate on drift, not on plating.
Two honest limits. First, this cell is engineered: real SEI has resistance, and with Marquis2019's own value this cell fails by impedance instead (7zb). It tests the gate's logic, not a cell you can buy. Second, adding it as an eighth set-condition pulls the drift-gated rule's interval against triage below zero for the first time (−14.7 cycles per design, set bootstrap −27.7 to −1.8). But that cell was built to drift, so we report that number and don't count it as a test. Building that pooling also turned up a bug: two cells sharing the set name Marquis2019 were overwriting each other's folds. It is fixed and tested.
Next, the paper's recipe and abstract move to the drift gate. After that comes a resistivity ladder between zero and the real value, to find where impedance takes over. Code, pre-registration and results are in experiments/sei7zc/ and the programme's research log.
Written with AI assistance. Simulated cells, not measured ones: Marquis2019's published parameters with plating off, SEI film resistivity set to zero and SEI solvent diffusivity scaled.