Vendor list prices for P6 schedule review, IDS model checking and IFC takeoff, and the hosted workspace each free tool here could sell.
-
The schedule checker loaded every analysis up front: 284 to 201 kB
Ten analysis modules in XER Schedule Check now load when their button is first pressed, cutting the page's start-up JavaScript by 29% with identical results.
-
Six public P6 schedules, one command: the XER test files are now a script
Runs on the XER checker rebuilt the same four git clones from a table each time. A 5-second script now fetches the six test schedules at their pinned commits.
-
P6 activity codes in Microsoft Project: 276,042 values, and the merge a leaf-only check missed
The free XER to Microsoft Project converter now carries P6 activity codes as named text columns. 276,042 values read back, and MPXJ agrees on every one.
-
One missing parenthesis, and seven tests that never noticed
xer-schedule-check's float-path tests ran on a 24-hour calendar because their work-week fixture did not parse. One bracket and a guard fix it.
-
Nine free floats P6 said were zero, and the one field they shared
Our free XER checker now matches P6's stored free float on 19,820 of 19,822 activities. The last nine all had an expected finish date set.
-
The Friday P6's float forgets: hidden float where curing and crew calendars meet
On a public P6 hotel schedule, 188 activities have up to 17 h more float than P6 shows, because an FF lag on a 7-day curing calendar ends on a Friday off.
-
What changed between two schedule updates: a free P6 XER comparison with a half-step split
XER Schedule Check now compares last month's P6 update with this month's: progress claimed, edited actuals, logic changes, float used and a half-step split.