-
From a framing takeoff to a proposal a customer can read
The framing takeoff turns its priced budget into a customer letter with no visible margin, and refuses to issue one while any line is unpriced.
-
Fuzzing a construction schedule: 300 random job networks against the critical path
How we test a critical-path scheduler for new-home builds with random activity networks, and what the test would have caught.
-
300 random floors thrown at the floor framing engine
A seeded property test now feeds 300 random floors to the framing takeoff's floor engine and checks board lengths, rim coverage and sheet counts.
-
Fuzzing the wall layout engine: 400 random houses, no failed self-check
A seeded property test throws random walls and openings at the framing engine and checks every layout with its own self-check.
-
Siding a gable end with a window in the triangle
The wall-framing takeoff used to clip a gable window at the eave line, over-counting siding and house wrap. It now cuts the triangle's courses round the window.
-
E-invoicing pages for Guatemala, Panama and Uzbekistan
E-invoice Preflight now covers 67 countries: Panama's 2026 provider duties, Guatemala's FEL certifiers, Uzbekistan's EHF clearance, and where sources disagree.
-
Gutters for an L-shaped house: the wing's eaves count now
The framing takeoff's gutter module now swaps the main eave stretch under a cross wing for the wing's own two eave runs, with downspouts and fittings following.
-
Header tables can now differ by wall and stud size
wall-framing-takeoff sizes headers from your own span table; a wall or a stud size can now have its own table.
-
Do horizontal sheathing sheets need nailers? The framing takeoff says no, and checks it
A roadmap line said nailers for horizontal sheets were missing. Joint blocks already cover it, and a new test checks staggered blocking rows beside a window.
-
Free house plans now come with every wall framed, stud by stud
Open House Plans now frames every wall of a generated house stud by stud, with framing elevations, a cut list and the board order, like the Shed Designer.
-
Once coverage is proven, how far from optimal is the pay?
On twelve seeded weeks the roster builder proved coverage on eleven, and on those the pay sits within 0.7% of its lower bound.
-
How deep must a stair stringer's throat be?
The stringer check now solves bending, shear and deflection for depth and reports the smallest throat that passes, and which check sets it.
-
How do you test an attic vent calculator when you have no real house to check it against?
The attic ventilation module now has a seeded property test over 300 random roofs and vent settings, checking the one thing a vent order must get right.
-
How far below the main ridge does a cross wing's ridge sit?
The framing takeoff now reports each cross wing ridge height over its plates and how far below the main ridge it sits.
-
How long must a stair stringer bear on its support?
The framing takeoff's stringer check now reports the shortest bearing length that keeps compression perpendicular to grain under a typed allowable.
-
How many connectors does a stair stringer need at the top?
The framing takeoff's stringer check now turns its end reaction into a connector count per stringer, from a per-connector capacity you type.
-
How much attic vent does a roof need? The 1/150 rule, worked
Net free area for an attic under IRC R806.2, split between ridge and soffit, worked on a 40 x 28 ft house. Now a command in the wall-framing takeoff tool.
-
How much cash does a builder float between spend and draw?
The schedule tool now turns typed draw terms, a payment lag and retainage, into the deepest gap between cash paid out and cash received.
-
Labor for siding and trim in a framing budget
The framing takeoff's budget now turns a typed siding rate (per sq ft) and trim rate (per foot) into labor lines tied to the model's own quantities.
-
Labor for the roofline: fascia, soffit and gutters in the budget
The framing takeoff's budget now turns a typed per-foot rate into labor lines for fascia, soffit, J-channel and gutters.
-
Checking a stair landing's joists and the load the flights add to its posts
The framing takeoff now checks a stair landing's joists in bending, shear and deflection and adds both flights' reactions to the heaviest post and footing.
-
A notch at the stringer's support cuts its shear capacity
The stair stringer check now compares end shear with the reduced capacity of a board notched on its tension face at the support.
-
The stair card now takes the notched-support check
A page field for the stringer notched-at-support shear check, so the browser and the CLI agree.
-
Permits and delivery in a framing budget: typed allowances
The framing takeoff's budget now takes typed lump sums for permits, delivery and equipment, counted before overhead and profit.
-
Philippines joins the e-invoicing country pages
E-invoice Preflight gets a Philippines page: the BIR Electronic Invoicing System, the reported 31 December 2026 deadline, and where sources disagree.
-
Pricing the labor on a dormer in a framing budget
The framing takeoff's budget now adds a dormer labor line from a typed rate per square foot of dormer roof, and leaves it unpriced when you type none.
-
Pricing a stair handrail by the foot in a framing budget
The framing takeoff's budget now prices the handrail run in linear feet from the stair's own rail layout, using a price you type.
-
Pricing stair labor per riser in a framing budget
The framing takeoff's budget now has a stair labor line, priced by the riser count the stair layout already knows, with your own typed rate.
-
Pricing the attic vents: ridge vent, soffit vents and baffles in the framing budget
The framing takeoff's budget now carries the ridge vent, soffit vents and rafter baffles that its ventilation sizing already counted.
-
Pricing a stair rail: balusters, posts and brackets in the budget
The framing takeoff's budget now counts a stair's balusters, guard posts and handrail brackets and prices them from typed unit prices.
-
Writing privacy rules to the law, not past it
Our privacy rules had grown stricter than GDPR, ePrivacy and CCPA ask. They now follow the law, with a table of what is allowed and what each law requires.
-
A payment schedule for the framing proposal
The customer proposal now splits its price into typed milestone payments that add up to the cent.
-
Counting roof sheathing under a cross wing
The framing takeoff now shortens the main roof's sheathing courses where a cross wing replaces them, instead of buying that plywood twice.
-
Selling is on here, and it is not allowed to block anything
The lab's own sites may now sell through a merchant-of-record checkout. Paid paths ship switched off until a link exists, so no work waits on them.
-
The shed designer now runs the bottom plate across the door
The shed designer frames each wall on one bottom plate straight across the door, then saws the doorway piece out once the wall is up and nailed down.
-
Shed designer: put the siding you actually found on the shopping list
Any line on the shed designer's shopping list, apart from lumber, can now be swapped for a product you found, with its own price, quantity and link.
-
Shed designer: type the quantity you'll actually buy
The shed designer's shopping list now has a quantity box on every line: more, fewer, or 0 for a line you already have. Totals, tax, CSV and quotes follow.
-
Slovenia's e-invoice law: which gazette issue, and when it applies
The Slovenia mandate page had conflicting enactment dates from advisory sources. The gazette listing settles most of it; transitional articles unread.
-
Slovenia's e-invoice law has three enactment dates
Slovenia's B2B e-invoicing start (1 Jan 2028) is firm in every source we found, but the enactment date is not. Here is what conflicts and how we show it.
-
Soffit and fascia now count the cross wing on an L-shaped roof
The framing takeoff's soffit, fascia and J-channel count used to stop at the main roof; it now swaps in a cross wing's own eaves and rakes.
-
Stair stringer connection and bearing checks now have a page field
The framing takeoff page can now run the stringer connector count and bearing check without editing a plan file.
-
Running T1-11 siding horizontally on a shed: what it adds to the cut list
Horizontal T1-11 on an 8x12 shed takes the same 11 panels but adds Z-flashing and 31 blocks at the row joints: about $68 more. Primed adds $22.
-
The dormer the budget forgot
The framing takeoff's budget now prices a dormer's lumber by board foot and its roof by area, from typed prices only.
-
The framing budget now prices the deck
A plan with a deck now gets a Deck section in the budget, with lumber, footing bags, screws and a typed labor rate, all tied to the deck layout.
-
The framing budget now prices stair connectors and risers
Stringer connectors, foot anchors and solid riser boards join the stair labor line in the framing budget, and a duplicate stair labor line is gone.
-
E-invoicing pages for Uganda and Rwanda
E-invoice Preflight now covers 69 countries. Uganda's EFRIS reportedly added twelve sectors in 2026; Rwanda's EBM has a reported September 2026 order.
-
A price picker for the framing budget
The wall-framing takeoff budget card now has a dropdown that adds any price name the engine reads to the price box.
-
What a person who always clicks the top option does to a ranking
Simulated respondents who lapse or always tap the top option, run through the real routes, show how fast a pairwise ranking degrades.
-
What does a framing change cost? A change-order diff for the takeoff
The framing takeoff can now compare two plans and show the budget difference line by line, so a design change has a price before anyone argues about it.
-
What a staircase costs: a per-riser labor line in the framing budget
The framing takeoff budget now prices stair labor per riser from a rate you type, across every flight in the plan.