RFQ review checklist: read the RFQ before you quote

Paste the buyer's email or the RFQ terms. The page pulls out what an estimator checks first (part numbers, revisions, quantities, material, finish, tolerances, dates) and the FAR and DFARS clauses and quality requirements that add cost or decide whether you can take the job. What it can't find becomes a question for the buyer, written as an email you can copy.

It reads by pattern, not understanding: it will miss things phrased in ways it doesn't expect, and every finding shows the text it came from so you can check it. The text you paste stays in this browser tab. It is not uploaded and not saved.

How to review an RFQ before you quote

Many quoting mistakes are not arithmetic. They are a requirement nobody read: a first article report on lot one, a domestic-melt material cert, an approved-processor list for the anodize, a CUI marking on the drawing. ISO 9001 and AS9100 both ask for this review before you commit to supply (clause 8.2.3, review of the requirements for products and services); a small shop without either still saves money doing it.

1. The part

Part number and drawing revision for every line. Quote to a revision, and write it on the quote, so a later drawing change is a new quote and not your loss. Check the drawing's notes block too: general tolerances, the finish spec, marking, and any "no substitution" note often live there and not in the email.

2. Quantities

The lot sizes to price, and the annual usage if the buyer will say. A single quantity with no annual figure is worth one question: setup is spread over the lot, so the price per part at 10 and at 400 a year are very different numbers.

3. Material and finish

Alloy and temper (6061-T6, 17-4 PH H1150), any material spec, and whether certs must travel with the parts. For finishes, the spec, type, class and color, plus masking. If the buyer names approved or NADCAP processors, get a price from one of them before you price the finish.

4. Tolerances

The tightest tolerance decides the machine, the inspection and sometimes whether you can make it at all. If a tight callout looks like a title-block default rather than a functional need, ask; buyers often loosen it.

5. Clauses and quality requirements

On defense work, the flowed-down clauses set obligations before the first chip: protecting CUI to NIST SP 800-171 (DFARS 252.204-7012), a current SPRS score (252.204-7019 and -7020), a CMMC level (252.204-7021), specialty metals melted in the US or a qualifying country (252.225-7009), export control (252.225-7048), a named quality standard (FAR 52.246-11) and DPAS-rated orders (52.211-15). Each one this page finds is listed with its title and what it means for the shop. Read the clause itself before you sign. For CUI and SPRS: the CMMC Level 1 vs Level 2 guide and the SPRS score calculator.

6. Dates

When the quote is due and when the parts are needed. Lead time on material and outside processing often sets the delivery date more than your own machine time does.

7. Ask once, in one email

Buyers answer one clear list faster than five separate emails. The questions above are written to be sent as they are, or edited first.

Common questions

What should I check in an RFQ before quoting?

Part numbers and drawing revisions, lot sizes and annual usage, material and finish specs, the tightest tolerances, the quote and delivery dates, and the FAR and DFARS clauses that add cost or decide whether you can take the job. Whatever is missing becomes a question for the buyer.

Which DFARS clauses matter for a machine shop?

252.204-7012 (protecting CUI to NIST SP 800-171), 252.204-7019 and -7020 (a current SPRS score), 252.204-7021 (a CMMC level), 252.225-7009 (specialty metals) and 252.225-7048 (export control), alongside FAR 52.246-11 (a named quality standard) and 52.211-15 (DPAS-rated orders).

Do ISO 9001 and AS9100 require contract review?

Both ask for a review of the requirements before you commit to supply, in clause 8.2.3 (review of the requirements for products and services).

Both products are open, free to start

We are building two paid products for small machine shops: an RFQ-to-quote assistant that turns a drawing and an email into a priced quote from your own rates, and a CMMC Level 1/2 and ISO 9001 workspace that keeps your SSP, POA&M and SPRS score in one place. The RFQ-to-quote assistant, Job Shop Quote, is open now: free early access for 40 RFQs a month and 3 users, no card; paid plans are not on sale yet. Reading an RFQ with AI is not switched on yet: you enter the part and the app prices it from your rate card, measures STEP, DXF, STL and IGES files, and writes the quote PDF. Start free in Job Shop Quote. The CMMC Level 1/2 and ISO 9001 workspace, CMMC Workspace, is open too: free on Level 1 (the 15 FAR 52.204-21 safeguards, their evidence and the SSP, for 1 user, no card); Level 2, with the SPRS score and the POA&M, is a paid plan that is not on sale yet. Start free in CMMC Workspace. Both are on the manufacturing page.

Neither product certifies anyone. Only an authorized C3PAO (or the government) can issue a CMMC Level 2 certification; software can help you prepare, nothing more.