CMMC affirmation and assessment due dates

Passing a CMMC assessment starts a calendar. Your Affirming Official affirms in SPRS after the assessment and every year after it, a Conditional Level 2 status has 180 days to be closed out, and the next assessment comes round in one year (Level 1) or three (Level 2). Enter the dates you already have and the page works out what is due next, lays out the years to your next assessment, and gives you a calendar file that reminds you 60 and 7 days ahead.

A planner from the dates you type, not a determination of your CMMC status and not an SPRS entry. Affirmations are entered by your Affirming Official in SPRS. Nothing you type leaves your browser.

Next due
—
By
—
Days left
—

Enter your CMMC Status Date to see your dates.

Your assessment

Due next

DueWhatDays leftRule

The years to your next assessment

Assumes each annual affirmation is made on the day it falls due. Affirming early moves the next one earlier: the year counts from the latest affirmation.

DateWhat

The calendar file has one all-day event per date with alarms 60 and 7 days before. Importing a newer file moves events in calendars that honour event IDs; others add a copy, so delete the old ones. (off by default).

The rules behind the dates

Why shops miss these dates

The assessment is a project with a deadline everyone knows. The affirmation a year later is a five-minute task with no one chasing it, often owned by the company officer rather than whoever ran the assessment, and SPRS does not remind you. A Conditional status adds a 180-day clock that starts on the status date, not when you start fixing things. Writing the dates down the day the status posts, with reminders far enough ahead to fix anything that drifted since, is most of the job. Your system security plan should name the Affirming Official and the date of the next review, and the SSP and POA&M guide covers what a closeout has to show.

The 32 CFR part 170 wording quoted above was read from the eCFR on 25 November 2026 for the CMMC workspace's own schedule; ecfr.gov did not answer the session that built this page, so the Level 2 (C3PAO) paragraph is a summary of search excerpts of § 170.17 and the final rule (89 FR 83092), not a quotation. Read the official text before relying on it; source notes are in SOURCES.md.

Common questions

How often does a CMMC affirmation have to be made?

After every assessment, including a POA&M closeout, and annually thereafter (32 CFR 170.22(a)). The Affirming Official enters each one in SPRS. This page counts the year from the latest affirmation you enter.

How long do I have to close out a Conditional CMMC Level 2 status?

180 days from the Conditional CMMC Status Date. For Level 2 (Self) the closeout self-assessment is posted to SPRS within that time; for Level 2 (C3PAO) a C3PAO performs the closeout assessment. If the 180 days pass without a closeout, the Conditional status expires.

When is the next CMMC assessment due?

A year after the CMMC Status Date for Level 1 (Self), and three years after it for Level 2, by yourself or by a C3PAO. A POA&M closeout does not restart the three years: they count from the original status date.

Both products are open, free to start

We are building two paid products for small machine shops: an RFQ-to-quote assistant that turns a drawing and an email into a priced quote from your own rates, and a CMMC Level 1/2 and ISO 9001 workspace that keeps your SSP, POA&M and SPRS score in one place, records each affirmation and keeps these dates on a calendar your team subscribes to. The RFQ-to-quote assistant, Job Shop Quote, is open now: free early access for 40 RFQs a month and 3 users, no card; paid plans are not on sale yet. Reading an RFQ with AI is not switched on yet: you enter the part and the app prices it from your rate card, measures STEP, DXF, STL and IGES files, and writes the quote PDF. Start free in Job Shop Quote. The CMMC Level 1/2 and ISO 9001 workspace, CMMC Workspace, is open too: free on Level 1 (the 15 FAR 52.204-21 safeguards, their evidence and the SSP, for 1 user, no card); Level 2, with the SPRS score and the POA&M, is a paid plan that is not on sale yet. Start free in CMMC Workspace. Both are on the manufacturing page.

Neither product certifies anyone. Only an authorized C3PAO (or the government) can issue a CMMC Level 2 certification; software can help you prepare, nothing more.