Machine hour rate calculator: what an hour on each machine costs you

A 5-axis hour and a manual mill hour do not cost the same, so one shop rate misprices both. Enter each machine's cost or lease, floor space, power, maintenance and tooling, how many hours it is scheduled and how many of them you can bill, plus the shop's overhead, and this page works out a cost per billable hour for each machine, with and without the operator. It ships no rates, lives or utilization figures: every number is yours. It runs in your browser and keeps nothing.

The shop

Machines

One block per machine or work centre. Give a purchase cost (with its life) or a yearly lease or loan payment. Leave a field blank for nothing.

How each line is worked out

Billable hours are the hours the machine is scheduled (shifts × hours × working days) times utilization: the share of those hours that end up on a job you can charge for. Setup you charge separately, warm-up, waiting for material, breakdowns and idle time are not billable. This one number moves the rate more than any other, so take it from your time records, not from hope.

Ownership is the yearly lease or loan payment if you enter one. Otherwise it is straight-line depreciation, (cost − salvage) ÷ useful life, plus the cost of money on the average investment, (cost + salvage) ÷ 2 × your rate: what the cash tied up in the machine costs you in interest or forgone return. Include tooling packages, probes, installation, rigging and the foundation in the cost. A machine that is paid off still has a replacement coming; leaving ownership at zero quotes as if it never will.

Space is the machine's footprint, with its share of the aisle and chip handling around it, times what a square foot of the building costs you a year. Maintenance is service contracts, repairs, way oil and coolant you buy per machine.

Overhead is the shop's costs that belong to no machine, shared out by billable hours: a machine that bills twice as many hours carries twice as much. If you would rather share it some other way (by floor space, or more on the machines that need the inspection room), work the share out yourself and enter it as that machine's maintenance with the shop overhead left blank.

Power is rated kW × the average load × the price. Spindles run well below their rating most of the time; if you have a meter reading, use kWh ÷ hours run instead (enter it as the kW with 100% load). Tooling is inserts, end mills, drills and holders worn out per spindle hour, from your tooling spend ÷ spindle hours.

Operator is the loaded wage (pay, payroll taxes, benefits, workers' comp) ÷ the machines one person runs ÷ utilization. The operator is paid for every scheduled hour and only the billable hours recover that pay. The shop rate calculator builds the loaded wage from a base wage.

Machine rate is the cost of the hour without the person; quote that for unattended running or when labour is priced on its own line. With operator is the full cost of an attended hour. Neither includes profit: the quoted column adds your markup.

Using the rates

Put each machine's rate into the job-shop quote calculator (the link under the table fills in the first machine's), or into the Excel quote template. Then check them against reality: the quoted vs actual page says whether the hours on your quotes are the hours the jobs took, and how to price a machined part walks through the rest of the quote.

What this does not do

It does not know what your machines cost, how busy they are or what other shops charge, and it ships no industry average. It works out cost, not price: what the market will pay for an hour on a machine is a separate question. It is not tax depreciation; the straight-line figure is for pricing, not your return.

Common questions

How do I calculate a CNC machine hour rate?

Add up what the machine costs a year (depreciation or lease, the cost of money tied up in it, floor space, maintenance and its share of shop overhead) and divide by the hours you can bill, then add the per-hour costs: power, tooling and, for an attended hour, the operator. This page does that per machine from your own numbers.

Why does utilization change the machine rate so much?

Most of an hour's cost is yearly cost spread over billable hours, so the same machine billing fewer hours costs more per hour. The page shows each machine's rate at 10 points more and less utilization, so an optimistic guess is easy to see.

Should a machine shop have one shop rate or a rate per machine?

A rate per machine prices work more accurately when the machines cost very different amounts to own and run: a single blended rate undercharges hours on the expensive machines and overcharges hours on the cheap ones. The page gives both the per-machine rates and the blended one.

Both products are open, free to start

We are building two paid products for small machine shops: an RFQ-to-quote assistant that turns a drawing and an email into a priced quote from your own rate card, with a rate per machine like the ones on this page, and a CMMC Level 1/2 and ISO 9001 workspace that keeps your SSP, POA&M and SPRS score in one place. The RFQ-to-quote assistant, Job Shop Quote, is open now: free early access for 40 RFQs a month and 3 users, no card; paid plans are not on sale yet. Reading an RFQ with AI is not switched on yet: you enter the part and the app prices it from your rate card, measures STEP, DXF, STL and IGES files, and writes the quote PDF. Start free in Job Shop Quote. The CMMC Level 1/2 and ISO 9001 workspace, CMMC Workspace, is open too: free on Level 1 (the 15 FAR 52.204-21 safeguards, their evidence and the SSP, for 1 user, no card); Level 2, with the SPRS score and the POA&M, is a paid plan that is not on sale yet. Start free in CMMC Workspace. Both are on the manufacturing page.

Neither product certifies anyone. Only an authorized C3PAO (or the government) can issue a CMMC Level 2 certification; software can help you prepare, nothing more.