Machine shop guides: SPRS score, quoting and CMMC
Free tools and plain-language guides for small machine shops that quote parts and work on defense contracts. Everything runs in your browser; nothing you type is uploaded.
CMMC Level 1 self-assessment
The 15 FAR 52.204-21 requirements, word for word: mark each met or not met, note your evidence, and download a worksheet with the scope, CAGE codes and your next annual date. Level 1 has no score and no POA&M, so every requirement must be met.
CMMC scoping worksheet
List your computers, CNC controllers, CMM, printers, phones and cloud services; answer a few questions each and see which 32 CFR 170.19 category your answers point to (CUI, Security Protection, Contractor Risk Managed, Specialized, Out-of-Scope), what has to be documented, and what is still open. Download the asset inventory.
SPRS score calculator
Mark the 110 NIST SP 800-171 requirements met or not met and get the DoD Assessment Methodology score: 110 minus 5, 3 or 1 point for each gap. Includes the partial credit for MFA and FIPS cryptography, the 88-point Conditional check, and a downloadable POA&M starter.
NIST 800-171 SSP template
Write your system security plan in the browser: boundary, environment, connections, and an implementation statement, owner and evidence for each of the 110 requirements. See what an assessor would send back, and download the SSP (HTML or Markdown) and the POA&M.
NIST 800-171 policy templates
The 14 security policies CMMC Level 2 assessors ask for, one per NIST SP 800-171 family: each restates its requirements in NIST's own words, carries your company, system, owner and review interval, and takes its procedures from your SSP. Download one or all as HTML (opens in Word) or Markdown.
DFARS 7012 incident reporting
Found a cyber incident? Enter when, and get the 72-hour DIBNet deadline, the date to keep images until (90 days from your report), and every step of DFARS 252.204-7012 with its paragraph: review, report, DC3 malware, subcontractor report number. Download the incident record.
CMMC affirmation due dates
Enter your CMMC Status Date and last SPRS affirmation: the next annual affirmation, the 180-day POA&M closeout deadline for a Conditional status, the next Level 1 or Level 2 assessment, the years in between, and a calendar file that reminds you 60 and 7 days ahead.
How to submit your SPRS score
From SPRS's own entry guides: the SAM, CAGE and CAM setup PIEE needs, the SPRS Cyber Vendor User role, what to type for a NIST SP 800-171 Basic Assessment, CMMC Level 1 and Level 2 self-assessments, which scores can be affirmed, and the affirming official's steps.
What CMMC costs a small business
DoD's own estimate from the CMMC final rule, line by line: who does the work, the hours, the rates and the C3PAO's team. Put in your own rates and C3PAO quote, add what it leaves out (closing your gaps), and see the assessment and the three years after it.
Stock size from a STEP or STL file
Drop the customer's model: bounding box, the round bar it turns from, and the stock to cut with your allowance and rounding, plus weight and material cost from your own price. Read in your browser; the file is never uploaded.
Job-shop quote calculator
Material, setup, programming, cycle time, secondary operations and markup from your own rates, with the price per part at every quantity break. No built-in rates.
Machining quote template (Excel)
The same quote as a free spreadsheet: your rates and the part in, six quantity breaks out, and a customer quote sheet with price each and extended price but none of your cost lines. No macros, no rates of ours.
RFQ review checklist · Drawing review
Paste an RFQ and see its parts, revisions, quantities, material, finish, tight tolerances and dates, the DFARS and FAR clauses that change the job (CUI, SPRS, CMMC, specialty metals, export control, DPAS), and the questions to send the buyer as one email.
Drawing review
Drop the customer's drawing PDF: title block, revision table (and whether it matches the title block), general tolerance block, numbered notes tagged by what they cost, the dimension and thread callouts in the views, distribution and export markings, and the questions to send the buyer. The callouts open in the first article checker with the general tolerances filled in. Read in your browser; the file is never uploaded.
CUI markings explained, with a checker
Paste the text of a drawing, RFQ or PO (or open the PDF): the CUI banner split into its category (CTI, EXPT, PROPIN) and dissemination controls (NOFORN, FEDCON, NOCON), the "Controlled by" line, distribution statements, and legacy FOUO. Each finding quotes 32 CFR 2002, DFARS 252.204-7012 or the CUI Registry, and the questions go to the buyer as one email.
First article inspection checker
Paste the ballooned characteristics and what you measured: each requirement read into its limits (bilateral, limit, MAX/MIN, GD&T, finish, general tolerance), every result judged, and the gaps that get an FAI report sent back. Download an AS9102 Form 3 style CSV.
Corrective action report template and checker
Write up a nonconformity the way an auditor reads it: the correction, the whys down to a root cause, could it happen elsewhere, the action and the effectiveness check. Flags "operator error" causes, training-only actions, an action that repeats the correction and missing checks; downloads as Markdown or a CSV log row.
ISO 9001 internal audit checklist
All 47 clauses with what to look for in a small shop, a result, the evidence seen and the finding for each, graded major, minor, observation or improvement. Splits the year's audits across the clauses, flags an auditor auditing their own work and a nonconformity with no evidence, and hands each nonconformity to the corrective action report. Clause numbers and headings only.
Machine hour rate calculator
What one billable hour on each machine costs you: depreciation or lease and the cost of money, floor space, power, maintenance, tooling, a share of shop overhead and the operator, from your own numbers, with how 10 points of utilization moves it. The rate drops into the quote calculator.
Quoted vs actual hours
Paste your job history and see, per machine, how far quoted setup hours and cycle times ran from what the jobs took, what the misses cost at your rate, your win rate, and a correction factor the quote calculator applies.
Guides
- CMMC Level 1 vs Level 2 for a small machine shop: FCI or CUI, the clauses to look for, what each level asks, and where CMMC Phase 2 stands (suspended since 13 July 2026; checked 24 November 2026).
- CMMC flow-down to subcontractors and suppliers: which CMMC level each supplier needs under 32 CFR 170.23 (FCI only: Level 1; CUI: at least Level 2), what DFARS 252.204-7021 makes you check before award, and what a "current" status is.
- What goes in an SSP and a POA&M: scope, implementation statements, and the POA&M limits in 32 CFR 170.21.
- How to price a machined part: shop rate, material yield, setup, cycle time, outside processes, markup versus margin and quantity breaks, from your own records.
- Machine shop quoting software: the four kinds (spreadsheet, ERP quoting module, standalone quoting platform, AI RFQ reader), listed prices with their sources, and the questions to ask in a demo.
Why these are free
Quoting and cybersecurity compliance land on the same person in a small shop, usually the owner. These pages answer the questions that come up first. They are also the front door to two paid products we are building for the same shops, described below. The tools on this page stay free to use and source visible (all rights reserved).
Sources for every regulation cited, with the date each was checked, are listed in SOURCES.md in the source repository.
Common questions
What is an SPRS score and how is it calculated?
It is the NIST SP 800-171 DoD Assessment score a contractor posts in the Supplier Performance Risk System. You start at 110 and subtract 5, 3 or 1 point for each of the 110 requirements not met. The SPRS score calculator here does that arithmetic, with the partial credit for MFA and FIPS cryptography.
Do I need CMMC Level 1 or Level 2?
It depends on what the contract sends you. Federal Contract Information (FCI) only, under FAR 52.204-21, means Level 1: 15 requirements and a yearly self-assessment. Controlled Unclassified Information (CUI), such as a drawing marked CUI, puts the systems that touch it in Level 2 scope: the 110 requirements of NIST SP 800-171.
How do I price a machined part?
From your own records: a shop rate built from your books, material per part from the stock price and yield, setup and programming spread over the lot, cycle time at the machine rate, secondary and outside operations, then markup. Re-run it at each quantity for the price breaks. The job-shop quote calculator does the arithmetic and ships no rates of its own.
Is anything I type uploaded?
No. Every tool on these pages runs in your browser; drawings, models, RFQs and answers are not uploaded. Some pages can keep a draft in your browser if you turn that on.