← Certified payroll calculator · WH-347 builder
Washington certified payroll: the L&I PWIA XML upload
Every contractor on a Washington public works project files certified payroll online with the Department of Labor & Industries at least once a month (RCW 39.12.120), in L&I's Prevailing Wage Intents and Affidavits (PWIA) system. Weekly payrolls can be typed in, or sent as an XML file ("Submit Payroll in XML File") that takes several weeks at once.
| Where it goes | L&I's Prevailing Wage Intents and Affidavits (PWIA) system |
|---|---|
| Since | 1 January 2020, all public works |
| How often | At least monthly |
| How | Online entry, or an XML file on L&I's schema |
What the L&I PWIA file holds that the WH-347 does not
The hours, rates, fringes and deductions are the same numbers as on the federal WH-347. The state's file wraps them with more:
- The project's Intent ID (from the intent to pay prevailing wages you filed).
- Each worker's full SSN and home address (the WH-347 asks only for the last four digits).
- For every row, a four-letter L&I trade code (99 codes) and the county the work was in, plus L&I's job classification.
- For apprentices: the ARTS ID, the registering state (WA, OR, MT or AK), occupation, step and step hours.
- Fringe credits in L&I's five fixed benefit fields, by type, with other plans named.
- Double-time hours and rate where overtime is paid at double time.
- A no-work week, sent as a file with the no-work flag and no employees.
Upload errors to check before you send
- Trade codes in capitals and the county in Title Case, as the upload guide asks.
- SSNs checked against the patterns the SSA never issues; no duplicates.
- The apprentice's state one of WA, OR, MT or AK; apprentice rows carry a step, not a job class.
- Obsolete elements (WageID, the apprentice program IDs) left out.
- L&I's own upload step compares your rates with the project's journey-level and apprentice wages: a rate below them is caught there, after you have built the file.
Keep one set of numbers
The usual mistake is retyping the week: once on the WH-347 for the GC, once into the state portal. Two copies drift. Compute the week once, then produce the WH-347 and the state's file from it, so gross, deductions and net agree on both.
PayApps makes this file. PayApps' certified payroll page has a Washington public works section that writes this week's payroll as L&I's PWIA XML, from the same numbers as the WH-347 PDF (gross is the WH-347's 7B; FICA and withholding are the form's). Trade codes and counties are offered from L&I's lists and written as the guide asks. Full SSNs are held in the page's memory only, never saved or sent to our server. The output is tested against L&I's schema; it has not yet been through a live PWIA upload.
PayApps is our hosted pay-app billing for specialty subcontractors: pay applications with retainage and change orders, the weekly WH-347 and the state files, on the job they belong to. Certified payroll is on every plan. It is open now, free on one job, no card; lien waivers, QuickBooks and job costing are in paid plans that are not on sale yet.
Start free in PayAppsQuestions
How often do I file?
At least once a month, on every public works project, under RCW 39.12.120. Several weekly payrolls can go in one XML upload.
Do I report weeks with no work?
The schema has a no-work flag for a week with no employees on the job.
Is the WH-347 enough in Washington?
Not on state public works: L&I wants the payroll in its own system. A federal job may also need a WH-347 for the GC; the contract says.
Sources
Read on 2026-11-27 from the agency's own pages. Rules change: check the agency's page and your contract before your first payroll on a job. Cities, counties and DOTs often run their own system on top (LCPtracker is common); on those jobs the GC tells you where to file.
Other states' files: New Jersey (NJ Wage Hub MW-562), California (DIR eCPR), New York (NYSDOL), Illinois (IDOL CTP), Oregon (BOLI WH-38). Federal jobs: the WH-347 builder and overtime on cash fringe.