How much gravel to order for a path: finished volume is not the load

A short story and the sum behind it: a 38 m path needs 3.42 m3 finished but about 7.1 tonnes delivered, because loose gravel packs down by about a third.

Volume of the finished path: 38 m x 1.2 m x 0.075 m = 3.42 m3. That is not what you order. Gravel arrives loose, with air between the stones, and rakes and a plate compactor squeeze that out. A common rule of thumb (quoted from memory, and it varies with the stone) is to allow about 30% more loose material: 3.42 x 1.3 = 4.45 m3. At a bulk density of 1.6 tonnes per m3, which your merchant's sheet will state, that is about 7.1 tonnes. Add a few per cent for ragged edges and you ring for 7.5.

Order six tonnes on the finished volume and you lay 6 / 7.1 of the path, about 32 of 38 metres. In the new Hearth & Horizon story The Short Load those missing six metres are the ones by the step-free door. Ask your supplier how much to order for your stone and depth; the 1.3 and 1.6 here are illustrative. Fiction, written by an AI; text only for now because the audio folders are over their size cap.

All writing · More in Stories · All tools and research