Quality fix: a bid due at 2:00 PM is late at 2:01, not at midnight

The bid readiness checklist now takes the solicitation's due time and the time zone it is read in, and reads past-due from that minute on the office's clock.

A solicitation does not say "due Tuesday". It says something like "sealed bids will be received until 2:00 PM local time on June 15 at the County Purchasing Office". A bid that arrives at 2:01 is late. For US federal sealed bids that is FAR 14.304, and most public owners follow the same rule.

Until today the Contractor Bid Readiness checklist only took the date. It counted whole calendar days in your browser's time zone. So a bid due at 2:00 PM still read urgent and "The deadline is today." at 3:00 PM, an hour after it could no longer be filed. The quality audit of 2026-11-19 listed this as its one high-severity defect. The same audit found a second problem: the page worked out the urgency label but never showed it.

What changed

The Opportunity panel has two new fields: Due time and Time zone the deadline is read in. The zone is usually the issuing office's. The list covers the US and Canadian zones, Arizona (no daylight saving), Hawaii, Alaska, Puerto Rico, the UK, Ireland, Sydney and UTC.

  • Past-due from the stated minute. With a due time, the bid reads past-due

    from that minute on that clock, wherever you open the page. A Chicago bid due at 14:00, checked from a laptop set to any zone:

    checked at (Chicago)labelsentence
    1:40 PMurgentThe deadline is today at 14:00 America/Chicago time, 20 min from now.
    3:00 PMpast-dueThe deadline passed today at 14:00 America/Chicago time, 1 h 0 min ago.

    These two rows are fixtures in model.test.mjs. They were also checked in Chromium with the clock pinned and the browser set to Asia/Tokyo, so the viewer's zone and the office's zone differed.

  • The office's calendar decides the day count. At 10 PM in Chicago it is already the next day in UTC. A bid due the next day is still 1 day out on the office's calendar, and that is the count the checklist now shows.
  • The urgency label is on the page. It shows as a badge next to the summary: normal, urgent at two days or fewer, or past-due. Before, it only appeared in the downloaded Markdown report.
  • Share links and the report carry the time and zone. A subcontractor who opens your link sees the same deadline you see. The Markdown report's "Due date" line shows the time and zone too.

Without a due time the checklist works as before: whole calendar days in your browser's zone. The days-remaining page now says how to switch to the exact minute.

How the time is converted

dueInstant in model.mjs turns "14:00 on 2099-06-15 in America/Chicago" into a single moment, using the browser's own time zone database (Intl.DateTimeFormat). It makes two passes, so a deadline on a daylight-saving changeover day still lands on the right hour. The tests check New York in winter and in summer, Arizona and London against UTC times worked out by hand. They pass under TZ=UTC, TZ=America/New_York and TZ=Asia/Tokyo. An unknown zone in a crafted link falls back to the browser's own clock and does not throw.

Still open from the audit

  • Checklist rows are not saved between visits unless you copy a share link.
  • Share links cut notes at 120 characters and drop rows past 100, and neither the sender nor the recipient is told.
  • The day-count DST regression test only bites when the test runner's zone observes daylight saving. The new timing tests pin UTC instants and do not depend on the runner.

A later audit round re-checks this fix. This round does not change the audit's scores.

The checklist is an evidence aid, not a compliance or award determination. Always read the solicitation's own deadline wording and confirm it with the issuing authority.

All writing · More in Quality audits · All tools and research