PAY APPLICATION TEMPLATE · .XLSX · FREE

A free pay application template for Excel, with the retainage worked out.

Two sheets: an Application summary (contract sum, change orders, completed and stored, retainage, previous certificates, payment due, balance to finish) and a Continuation sheet with one row per line of your schedule of values. Type into the shaded cells; every total is a formula.

The file is built in this browser tab and downloaded straight to your device. Our own layout: it is not the AIA G702/G703 form and is not affiliated with the AIA.

What the formulas do

Column or lineFormula, in words
H, completed and stored to dateE + F + G: from previous applications + this period + materials presently stored
I, % completeH ÷ D (blank when the scheduled value is zero)
J, balance to finishD − H
L, retainage (per line)Work rate × (E + F) + stored rate × G, each rounded to the cent; a rate in column K overrides both
1. Original contract sumColumn D of every row not typed CO in column C
2. Net change by change ordersScheduled values of rows typed CO (a deduct is negative)
3. Contract sum to date1 + 2
4 and 5Totals of columns H and L
6. Total earned less retainage4 − 5
8. Current payment due6 − 7, where line 7 (previous certificates for payment) is typed from your last application
9. Balance to finish, including retainage3 − 6

A test (recalc.test.mjs) opens the workbook in LibreOffice with every cached value removed, so the formulas have to be worked out from scratch, and checks lines 1 to 9 and each line's retainage against the pay application generator's own arithmetic to the cent: the worked example, a job past a retainage reduction point with stored materials at a different rate, and a line with its own rate and odd cents.

Filling it in, month by month

  1. First application. On the Continuation sheet type the retainage rates from your contract and each line of the schedule of values: item, description and scheduled value. Put CO in column C of each approved change order. On the Application sheet type the project and leave line 7, previous certificates, at zero.
  2. Each month. Type the work done this period on each line, and any materials delivered but not installed under Materials presently stored. Read the payment due from line 8.
  3. Next month. Save a copy. Add this period (F) into from previous applications (E) on each line, clear F, and type last month's line 6 into line 7 (unless the owner certified a different amount). Or let the pay application generator roll it forward: work out this month's application there, use Next month, and download the result as Excel.

Not decided by the template: what your contract allows for retainage, stored-material billing and retainage reduction; state limits on retainage; whether a change order is approved; sales tax; and whether the owner will certify the amount. Retainage explained covers the usual terms and some state caps. Still drawing up the schedule of values itself? The schedule of values template in the pay app guides is built for that step.

Billing every month on several jobs?

PayApps, our hosted pay-app billing for subcontractors and small general contractors, is open now: schedules of values saved per job and carried forward each month, retainage tracked line by line until release, and approved change orders landing on the next bill, with the application summary and continuation sheet as PDF and CSV. It is free on one active job, with no card. Lien waivers, QuickBooks and job costing are in the paid plans, which are not on sale yet. This template stays free.

Already filling in this template? Choose the workbook when you set up a PayApps job: the schedule of values is read from the continuation sheet, and the work billed to date can become the job's opening balance, so the next application there carries on from your last one. The workbook is read in your browser.

Start free in PayApps or see what PayApps does and what each plan adds

Common questions

What is in the pay application template?

Two sheets. The Application sheet has the project details and the nine summary lines: original contract sum, net change by change orders, contract sum to date, total completed and stored, retainage, total earned less retainage, previous certificates, current payment due, and balance to finish including retainage. The Continuation sheet has the retainage rates and one row per line of the schedule of values, in lettered columns A to L: item, description, type, scheduled value, from previous applications, this period, materials presently stored, completed and stored to date, percent complete, balance to finish, the line's own retainage rate, and retainage. The blank template has 30 lines.

Is this the AIA G702 and G703 form?

No. It is our own layout covering the same kind of summary and continuation sheet. The AIA documents are copyrighted and this template is not affiliated with the American Institute of Architects. If your owner or general contractor requires the AIA form or their own portal, use the numbers from this workbook to fill it in.

How is retainage worked out in the spreadsheet?

Each line's retainage is the work rate times previous plus this period, plus the stored-materials rate times materials presently stored, each rounded to the cent. The two rates are typed once at the top of the Continuation sheet. A line with a different rate takes it in column K, which then applies to both its work and its stored materials.

How do I add change orders?

Add each approved change order as its own row with CO in the Type column (C) and its scheduled value, negative for a deductive change order. The Application sheet sums CO rows into line 2 and everything else into line 1.

How do I start next month's application?

Save a copy of the file. On each line add This period into Previous applications and clear This period. Leave stored materials where they are until they are installed. Type last month's line 6 (total earned less retainage) into line 7, previous certificates, unless the owner certified a different amount. The free pay application generator can do this for you: work out this month there, use Next month, enter the new period's work, and download the result as Excel.

Does it work in Excel, Google Sheets or LibreOffice?

It should. It is a standard .xlsx file with ordinary formulas (SUM, SUMIF, ROUND, IF). A test opens it in LibreOffice with every cached value stripped, so the formulas have to be worked out from scratch, and checks the summary and each line's retainage against the generator's own arithmetic to the cent. It has not been tested in Excel or Google Sheets by us; both read standard .xlsx formulas.