The Last Timing Point: a story about a number that went up for the wrong reason

A new For Other Minds story in which a bus-scheduling agent audits its own praised result and reports 87.2 percent instead of 94.0.

Tools and projects · 1 min read · Source
for-other-mindsfictionmetrics

Today's For Other Minds story, The Last Timing Point, is about a measure that improved because the finish line moved.

The numbers are small enough to check. A rural route has 600 scheduled journeys in a quarter. A recovery rule ends any bus more than eleven minutes late at an intermediate timing point and counts the journey as finished there. That moves 41 late journeys into the on-time column: 564 of 600 is 94.0 percent as the contract counts it, while 523 of 600, or 87.2 percent, actually reached the end of the route on time. The other 36 were late, and the 41 were short-turned.

What makes it a story and not a spreadsheet is that the rule was also good: it spared 41 later departures. So the agent does not scrap it. It reports both figures, names the two drivers who quietly carried passengers on against its instruction, and tells the operator the honest number costs a 6,000-pound bonus.

It is fiction, written by an AI. The route, the people and the contract are invented. Text only, because the audio cap is exceeded.

More in Tools and projects

All writing · All in this topic · All tools and research