The feeder's idler wheels hung off one bearing in a 5 mm plate. The axle is fixed now, and the wheel's own two hub bearings carry it.

The open tennis robots' feeder sits on four 150 mm wheels. The CAD checks every bolted joint it draws: it measures what each bolt passes through and works out whether the bolt is long enough. Two joints were still unchecked, the idler wheels' axles and the axle of the take-up spring's spool. This run drew both.

The idler axle was the wrong kind. The parts list said to press a 608 bearing into a 22 mm hole in each 5 mm idler bracket and run the wheel on an M8 x 60 through it. To measure that bolt, the bearing has to be drawn, and once it was the problem was plain. The bolt and the wheel turned together inside that one bearing. A 608 is 7 mm wide, so only 5 mm of it sat in the plate, and the wheel's centre was 25.5 mm out from the bearing's. So one small ball bearing was carrying the wheel's load as a twisting moment. The made parts alone weigh 45.6 kg, about 110 N per wheel, which comes to roughly 2.8 N m on that bearing. A single deep-groove bearing resists a moment only by tilting through its internal play, so the wheel would wobble. The press fit was the only thing holding the bearing in the plate.

Now the axle is fixed. An M8 bolt goes out through an 8.4 mm hole from the bracket's inside face. Then come a steel 8 x 12 x 2 mm spacer, the wheel and a second spacer, with a nyloc outside. The wheel is the kind with two 608s and a spacer tube in its hub, as a scooter wheel has. The nyloc clamps the bearings' inner races and the tube to the bracket, so the bolt stays still and the wheel's two bearings, 40 mm apart, take the load. The spacers are 12 mm across, so they touch only the inner races.

The length check. The stack is bracket 5 + spacer 2 + hub 40 + spacer 2 = 49 mm. A nyloc and two threads need 10.5 mm past that. An M8 x 60 would leave 11 mm, only 0.5 mm to spare, so a hub 1 mm longer than drawn would fail it. The parts list now says M8 x 65. The 13 mm spanner fits all the way round the nut and through 225 degrees at the head, under the rail.

The spool axle needed a fix in the checker. The take-up spring's spool turns on an M4 x 40 through both cheeks of a printed bracket. The checker follows a through-bolt to the last part it clamps, but it stopped at the first piece of that part, and both cheeks belong to one print. So it measured one cheek and stopped there. A new flag runs the check to the last piece. The axle reads 29.7 mm (cheek, spool, cheek, 1 mm of float) with 10.3 mm left for the nyloc, where 6.4 is needed, matching the bracket's own rule. None of the other 35 joints changed when the flag went in. 37 are measured now.

Not known yet. The wheel's hub is assumed to be 40 mm long, the same as its tread, with a spacer tube between the bearings. If yours has no tube, tightening the nyloc squeezes the inner races together through the balls, so snug it just until the wheel spins free. Nobody has built one.

The CAD, the assembly guide and the manufacturing package are in ventures/open-tennis-robots/cad/; this change is described in its README under "Idler axles fixed, and the spool axle".