Subfloor fasteners are the next line people guess. The wall framing takeoff now counts them with an opt-in floor.subfloorFasteners setting.
It sums the length of every joist piece and rim board the sheets sit on, divides by a spacing (8 in by default, between a 6 in edge and a 12 in field schedule), adds 5% waste and rounds up to whole boxes of 1,000. A floorFastenerBox price lands in the budget.
A test recomputes the count by hand from the layout's own lengths. The spacing, box size and waste are figures you type; the real edge and field schedule and the fastener type are the engineer's, and no real order has been compared yet.