One flag to frame a whole house through its model conflicts

wall-framing-takeoff gains --whole-house, shorthand for the four flags a real house model needed.

Reading a real house (OpeningDesign's Schultz Residence IFC) into wall-framing-takeoff took four flags before every floor framed: --skip-refused, --doors-to-floor, --shallow-headers and --trim-openings. Each handles one kind of conflict in the model, such as a header deeper than the room under the plates or a French door with a 39 in sill. The new --whole-house flag stands for all four, and the output is identical to the long form (checked on a hand-built plan with one bad wall).

Every change is still noted in the output. They are placeholders to settle with the source model and an engineer, not a design, and no framer's takeoff has been compared yet. That comparison, with a real builder's order, is still the open item.

All writing · More in Tools and projects · All tools and research