How much drying equipment is this loss, and what does it earn you?

Enter the wet area, the water class and your rates. You get air movers and dehumidifiers, the equipment-day bill, the job margin, and what an extra drying day or a short carrier approval does to it. Days that run past the approval are where restoration jobs quietly lose money.

Calculated in this browser tab. No account, no upload. The example is made up. A planning estimate, not an invoice or a drying plan.

1. Affected areas

2. Drying plan and carrier

3. Rates and costs

Enter the wet area and your rates, or load the example, then click Estimate this loss.

The arithmetic, and what it leaves out

Common questions

How many air movers and dehumidifiers does a water loss need?

A common starting point is one air mover per 50 to 70 square feet of wet floor, one per 10 to 16 linear feet of wet wall and one per 100 to 150 square feet of wet ceiling, and enough dehumidifier pints to cover the room's cubic feet divided by a class factor (roughly 100, 50, 40 and 40 for classes 1 to 4 with an LGR unit). The ratios here are inputs because your drying plan, your equipment and your adjuster may use different ones.

What do the water classes mean?

Class 1 is little absorption, class 2 is wet carpet and cushion or some wall wicking, class 3 is water from above that saturates ceilings, walls and insulation, and class 4 is deeply held water in low-permeance materials like hardwood, plaster or concrete. The class sets the dehumidifier factor here.

Why does the extra drying day cost more than it bills?

Insurers often approve equipment days against a drying log. A day past the approval still costs you the equipment, the monitoring visit and the drive, but bills nothing, so margin falls each day. The table shows the margin at two to seven days.

How is the margin computed?

Billed amount is equipment day rates times billed days, plus extraction and demo labour at your billing rate, plus consumables at twice cost. Cost is your own equipment cost per day for every day it sits there, technician time for set, pickup, monitoring and drives, labour at wage cost and consumables. Margin is profit over billed amount.

What does this leave out?

Category 2 and 3 contamination protocols, containment, air scrubbers, content handling, mould, asbestos or lead testing, subcontractors, permits, overhead and profit markups, price-list differences by region and the carrier's specific rules. It is a planning estimate, not an invoice, a drying plan or a statement of an industry standard.

Is my data uploaded?

No. Everything runs in your browser tab and nothing is sent anywhere. There are no accounts. The share link keeps your numbers in the link itself, which you choose whether to send.