How to size a detention pond

A detention pond holds back the extra runoff that roofs and pavement make, and lets it out slowly enough that the creek downstream sees no bigger a peak than it did before. Sizing one is a loop: make the developed site's hydrograph, push it through a basin and an outlet, and change the outlet until the peak coming out is the one you are allowed. Here is that loop worked through for one small site, with every number from the free detention pond sizer.

The site

Five acres of woods and pasture, curve number 61 and a time of concentration of 0.5 hours, becoming a small subdivision at curve number 85 with a 0.2 hour time of concentration. Two storms: a 2-year and a 100-year, each 24 hours long, from intensity = a / (minutes + 10)0.8 with a = 40 and a = 85. Those coefficients are illustrative and belong to no real place; on a real job they come from the local drainage manual or a fit to NOAA Atlas 14. They give 2.84 in and 6.03 in of rain over the day.

Step 1: how much runs off

The NRCS curve-number equation: S = 1000 / CN - 10 is the most the ground could hold, the first 0.2 S soaks in before anything runs off, and runoff Q = (P - 0.2 S)² / (P + 0.8 S). Woods at CN 61 have S = 6.393 in, so the first 1.279 in of rain makes no runoff at all and the 2-year storm gives 0.31 in. The subdivision at CN 85 has S = 1.765 in and starts running off after 0.353 in: the same storm gives 1.45 in, more than four times as much.

Step 2: when it arrives

The rain is laid out as an alternating-block storm: the 1.5-minute blocks from the IDF curve with the biggest in the middle of the day. The runoff in each block is spread by the NRCS triangular unit hydrograph, which rises to its peak in half a step plus 0.6 times the time of concentration and is scaled so it carries exactly one inch. For the developed site that is 0.1325 hours to a peak of 28.54 cfs per inch of runoff; for the woods 0.3125 hours and 12.10 cfs per inch. Faster and taller: development changes the timing as well as the volume. The step is 1.5 minutes because NRCS ties the unit duration to the time of concentration: with Tp = D/2 + 0.6 Tc and Tc + D = 1.7 Tp (NEH-630 chapter 16), D = 0.133 Tc, 1.6 minutes for the developed site's 12. A 2-minute step moves the developed 100-year peak by about 2%.

StormRain, inRunoff beforeRunoff afterPeak beforePeak after
2-year2.840.31 in1.45 in0.77 cfs9.81 cfs
100-year6.032.03 in4.33 in8.30 cfs28.81 cfs

Step 3: route it through the basin

The basin is 100 by 60 ft at the bottom with 3 to 1 side slopes, so its volume at depth h is 6,000 h + 480 h² + 12 h³ cubic feet. Each 1.5-minute step, the water that came in minus the water that went out changes the storage, and the storage sets the level, and the level sets the outflow. Written for the end of the step, 2S/Δt + O equals the two inflows plus 2S/Δt - O at the start, which the tool solves for the level directly. That is level-pool, or storage-indication, routing.

Step 4: size the outlet, small storm first

A single circular orifice at the bottom is made bigger or smaller until the 2-year storm's peak outflow equals the woods' 0.77 cfs. That lands at a 4.6 in orifice, and the 2-year storm then fills the basin to 2.05 ft, about 14,434 cubic feet.

That orifice alone would hold the 100-year storm to a trickle and back the water 5.50 ft up the bank. The ordinance allows the woods' 100-year peak of 8.30 cfs, so a weir goes in with its crest at 2.05 ft, the 2-year storm's highest level, where that storm never reaches it. Lengthening it until the 100-year peak out is 8.30 cfs gives a 1.10 ft weir, and the 100-year level comes down to 4.26 ft with about 35,234 cubic feet stored. The weir is a slot in a riser, so it has two end contractions: Francis's formula takes its effective length as L - 0.2 H. Treat it as suppressed (full channel width, L' = L) and a 0.62 ft weir looks enough, which a contracted slot that size is not.

Now look at the head: 2.21 ft of water over a 1.10 ft crest. Francis fitted his formula to heads up to about a third of the crest length, and the tool says so. A slot this narrow and this deep is behaving as an orifice, so the second stage of this site's outlet is better drawn as a second orifice or a rectangular opening and checked with the orifice equation. The weir number tells you the order of the opening's area; it is not a detail for the drawing.

Step 5: the depth

Add a foot of freeboard to the 100-year level: 5.26 ft deep, about 132 by 92 ft at the top of bank. Then the emergency spillway, the outlet barrel and tailwater, the water-quality volume and the local manual's minimum orifice size, none of which this example covers.

When to use something else

This is a screening model: one subarea, a storm built from an IDF curve rather than the NRCS 24-hour distributions, a free outfall and no infiltration. It is meant for a first layout and an independent check of a model run elsewhere. A permit set needs the method your reviewing agency names, run by a licensed engineer, usually in TR-20, HEC-HMS or a commercial package.

Size your own basin and download every step's hydrograph as a CSV.