FOR HOMEOWNERS, BUILDERS AND ELECTRICIANS · A GUIDE TO THE FREE SERVICE LOAD CHECK

What size electrical service does a house need?

New all-electric houses are often specified at 200 A, or 400 A, by habit. The National Electrical Code's optional calculation for a dwelling, NEC 220.82, gives an actual figure from the house's own loads. This page walks through it and works one all-electric example; the free service load check does the arithmetic for your house.

When 220.82 applies

One dwelling unit on a 120/240 V or 208Y/120 V 3-wire service or feeder of 100 A or more. It works for a new house and for a replacement service on an existing one. It counts every load at once, existing and new. (For adding load to an existing service without replacing it, the code's methods are 220.83 and 220.87; the EV charger guide covers those.)

The calculation

220.82(B): general loads

Add 3 VA per square foot for lighting and receptacles, 1,500 VA for each 20 A small-appliance and laundry circuit, and the nameplate of every appliance that is fastened in place, permanently connected or on its own circuit (range, oven, cooktop, dryer, water heater, dishwasher, EV charger) and of every permanently connected motor. Count the first 10,000 VA at 100% and the rest at 40%.

220.82(C): heating and cooling, the largest of six

  1. Air conditioning and cooling at 100%.
  2. A heat pump with no supplemental electric heat at 100%.
  3. A heat pump compressor at 100% plus supplemental heat at 65%. If the compressor cannot run while the strips are on, it is left out.
  4. Electric space heat at 65%, with fewer than four separately controlled units.
  5. Electric space heat at 40%, with four or more separately controlled units.
  6. Electric thermal storage, or other heat expected to run continuously at full nameplate, at 100% (and not in any other selection).

Add (B) and the chosen (C), divide by 240 V (or 208 V), and that is the calculated load in amps. The service needs a rating at least that large, and never less than 100 A.

A worked example

The tool's second example: an invented 2,400 sq ft all-electric house with an induction range (12 kVA), dryer (5 kVA), water heater (4.5 kVA), dishwasher, disposal, a 48 A EV charger, a heat pump whose nameplate minimum circuit ampacity is 21 A at 240 V, and 10 kW of backup strips. It is a placeholder to show the method, not a real or typical house.

So in this example the backup heat, not the EV charger or the range, decides whether the house needs 125 A or 175 A. 175 A panels are uncommon, so the practical choice may still be 200 A, now for a reason you can see; the gap between 150.9 A and 200 A is room for later loads, not a code requirement.

Run it on your house: list the loads, choose the kinds, and the result shows each 220.82(C) selection, which one wins and the smallest standard service that covers the total, next to the 220.83 and 220.87 checks for an existing service.

Not decided

Which code edition and local amendments apply, whether the inspector or utility wants the standard method of Article 220 Part III instead, conductor and grounding sizes, panel spaces, the neutral calculation (220.61), the utility's transformer and service drop, and whether a given nameplate figure is right. A licensed electrician and the inspector decide. The factors are as I read the 2017 to 2023 editions from published section summaries, not checked line by line against a licensed copy.