Who this is for
- Homeowners quoted a service upgrade before an EV charger or heat pump can go in, who want to know whether to ask about the alternatives.
- Electricians and electrification contractors who want a quick 220.83 worksheet and a 220.87 reading of the customer's Green Button file to take to the inspector, instead of a spreadsheet per job.
- Energy advisors sizing a heat pump retrofit who need to know whether the panel is the real constraint.
The two methods
NEC 220.83: calculate from what is installed
Add up 3 VA per square foot for lighting and receptacles, 1,500 VA for each small-appliance and laundry circuit, and the nameplate of every fixed appliance, including the new one. The first 8,000 VA counts at 100%, the rest at 40%. If the new load is air conditioning, a heat pump or electric heat, the larger of the heating or cooling total counts at 100% on top instead. Divide by 240 V for amps.
NEC 220.87: measure what the house actually draws
Take the highest 15-minute average demand from a year of meter data, multiply by 125%, add the new load. If that is within the service rating, the service may carry it. Most smart meters already record exactly this, and the utility's Green Button download gives it to you. Hourly data is not enough: an hour's average hides the busiest quarter-hour inside it.
A worked example
This is the example built into the tool: an invented 2,000 sq ft house on a 100 A, 120/240 V service with an electric range (12 kVA), dryer (5 kVA), electric water heater (4.5 kVA), dishwasher, gas furnace blower and a 3-ton central air conditioner (20 A at 240 V), and a synthetic year of 15-minute meter data. It is a placeholder to show the method, not a real home or a typical one.
- 220.83, before the charger: 6,000 VA lighting + 4,500 VA circuits + 28,100 VA of appliances = 38,600 VA. 8,000 + 40% of 30,600 = 20,240 VA, or 84.3 A. That leaves 3,760 VA of calculated load, which at 40% is 9,400 VA of new nameplate: enough for a charger set to 32 A, not 40 A.
- 220.87: the synthetic year's highest 15-minute demand is 10.39 kW, on an August evening with the air conditioner running. 125% of that is 12,985 VA, or 54.1 A, leaving 11,015 VA: enough for a charger set to 40 A, not 48 A.
- A 48 A charger (11,520 VA) fits neither way: 103.5 A by 220.83 and 102.1 A by 220.87 on a 100 A service.
So in this example the choice is not "upgrade or nothing". A 40 A setting on a 50 A circuit adds about 30 miles of range an hour on a typical EV, enough to refill a day's driving overnight. A load management device that holds the charger back when the house is busy (NEC 625.42 and 220.70 in the 2023 edition) is another route, and counts at its set limit.
Run the check on your house: list the appliances, paste or choose your Green Button file, and the tool shows both methods, the largest charger setting each one allows, the five highest 15-minute blocks and every month's peak.
When to use something else
- The panel is full, damaged or recalled. Load is not the only reason to replace a panel. A licensed electrician should look.
- You have solar. A meter behind solar records net load and hides daytime demand. Use 220.83, or a consumption export from the solar monitor.
- You are adding a lot at once, such as an EV, a heat pump with backup strips and an induction range together. Run them together in the tool; if it is close, a service upgrade may be the honest answer.
- Your inspector wants a stamped or software-generated calculation. This tool prints a worksheet for the conversation; it is not a permit document.
Not decided
Whether your inspector accepts either method, which code edition and local amendments apply, the condition of the panel and service conductors, breaker spaces, conductor sizing for the new circuit, and whether the utility's transformer and service drop are adequate.