What it does, and what it does not do
A workspace for the person in a small shop who has been handed CMMC on top of their real job. Everything on the left is in the workspace today; what each plan includes is on the pricing page.
Does
- Asks plain questions about your shop (machines, network, who has access, which vendors and clouds) and drafts the SSP from your answers only. Anything you have not answered stays marked as a gap; nothing is filled in for you.
- Tracks each of the 15 Level 1 or 110 Level 2 requirements as met, not met or not applicable, with the evidence you attach.
- Imports the self-assessment spreadsheet you already keep: choose the Excel workbook (or a CSV), preview which requirements change, then apply. The workbook is read in your browser and only the assessment sheet is sent. Statuses, owners, notes and implementation statements come across; rows it cannot read are listed by line, not guessed.
- Keeps the Level 2 asset inventory by the five scoping categories of 32 CFR 170.19(c), and imports the asset list you already have (an Excel workbook, a CSV, or the CSV from the free scoping worksheet). The category is your decision: a row without one is listed, not guessed. Link your network diagram of the assessment scope to the inventory, and the SSP names it.
- Calculates your SPRS score with the DoD Assessment Methodology weights and shows which open items cost the most points.
- Builds the POA&M, flags requirements that may not sit on one, and reminds owners before the 180-day close-out. Already keep one in Excel? Import it: dates written month first (12/31/2026) or day first (31/12/2026) are read in the order the sheet uses, and anything unclear is listed by line, not guessed.
- Keeps the subcontractor and supplier register DFARS 252.204-7021 asks for: what each order sends (CUI, FCI or neither), the level flowed down, the supplier's CMMC status, its date and latest affirmation, and whether the status was checked before award, with the date each stops being current. Imports the approved-supplier list you already keep in Excel; what an order sends is never guessed, and an approval column such as "Approved" is never read as a CMMC status.
- Reminds the senior official about the annual affirmation and keeps the record of what was affirmed and when.
- Keeps ISO 9001 / AS9100 records (document control, internal audits, corrective actions) beside the CMMC work, and imports the master document list you already keep in Excel. A revision counts as released only where your list gives its approval date; the rest come in as drafts, listed by line, not guessed. Link the approved file of each revision as its controlled copy: the history keeps its name and SHA-256, so you can show an auditor which file was released.
- Exports the SSP, POA&M and score worksheet as documents you own and can hand to an assessor or prime.
Does not
- Certify your shop. We are not a C3PAO or an assessor, and we are not affiliated with or endorsed by the DoD or the Cyber AB.
- Guarantee a score, an assessment result or a contract award. The score is what your own evidence supports.
- Post to SPRS or sign the affirmation for you. Your senior official does that, in SPRS.
- Fix your network. It tells you what is missing; your IT person or MSP closes the gap.
- Hold CUI. The workspace is for documents about your system, not the controlled drawings themselves (see security).
- Give legal advice. For contract questions, ask your contracting officer or counsel.
Also for the same shops
Job Shop Quote: Turn an RFQ package (drawings, quantities, material) into a priced quote you check before it goes out.
Start free with Level 1 Level 1 is free, with no card. Level 2 plans are not on sale yet. Already have an account? Sign in.